cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 949 Documents
Pengukuran Kesenjangan (Gap) Kualitas Layanan Perpustakaan UK Petra dengan Metode Servqual Kansil, Alvin; Sutapa, I Nyoman
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

The purpose of the research was to measure gap between perceive and expectation of the library users on quality of PCU Library services (gap 5), gap between library user expectations and library management perceptions (gap 1), gap between library user expectations and library staff perceptions (gap 6), and gap between library management perceptions and library staff perceptions about library user expectations (gap 7). The gap analysis used Servqual method.The research result showed that the most negative value of gap 5 is activity staff offer assistance to library users, with a score of -1,47. The most negative value of gap 1 is conformity Digital Theses collection with library user’s needs (-1,00). The most negative value of gap 6 is the existence of DiVo as a means of information and promotion (-0,15). The most negative value of gap 7 is conformity Digital Theses collection with library user’s needs (-1,19).
Pembaharuan Prosedur Departemen Produksi dan Departemen QSHE di PT Charoen Pokphand Indonesia Balaraja Chandra, Genesius; Halim, Siana
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT Charoen Pokphand Indonesia Balaraja is a company in feed production. One of the ways for PT Charoen Pokphand Indonesia maintaining their feed quality is through documentation of all activity that related with production in procedure. The last update of procedures was in 2008, so some procedures are no longer applicable in company’s current condition. So that, the procedures must be updated and those procedures can be used as work guidance and work standard. Total of 8 procedures, 34 work instructions, 14 forms, 10 appendixes in Production Department and 13 procedures, 109 work instructions, 31 forms, 7 appendixes in QSHE Department, which had been revised.
Peningkatan Efisiensi Manpower Berdasarkan Prinsip Shoujin di Area Produksi Head Lamp PT Astra Otoparts Divisi Adiwira Plastik Sanjaya, Robert Gorevi; Palit, Herry Christian
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Regional Minimum Wage (RMW) enhancement in Kab. Bogor is adequately high which in 2013, the RMW increasing 61% from 2012. RMW enhancement which not followed with manpower (MP) efficiency could became a disadvantage for company. The initial condition evaluation indicate the MP efficiency value is 45% and the line efficiency value is 70,5%. Total initial manpower allocation is 8 MP. Improvement executed which consider to customer demand and production capability. Evaluation result indicates there’s unbalance work load distribution of each MP. Improvement planned such as balancing the work load of each MP, machine modification, and re-layout the production area. The implementation based on shoujin principle’s resulted manpower saving from 8 MP to 6 MP, which the MP efficiency value is 53% and the line efficiency value is 85,8%. Standardized work did as well as the control item in order to stabilize the improvement process. The next step is the analysis of production capability to face the increasing of customer demand. This analysis concluded that production needed additional overtime and additional work shift (for November only) in order to fulfill the customer demand.
Perancangan Quality Plan untuk Penurunan Tingkat Kecacatan Produk di PT. Sentosa Alloy Industri Susanto, Gunedi; Rahardjo, Jani
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. Sentosa Alloy Industri is a company which engaged in spare part manufacture field of motorcycle. This company produces velg, hub, flange, brake handle. The purpose of this study is to devise improvements proposed and quality plan in die casting process which aims to reduce the level of defects and improve the product quality.The result of this study are: the level of porous defects 4,38%,  the level of imperfect product defects 2,08%, the level of sticky product defects 1,43%, and the smallest level of defects is cracked with 0,04%. Potential problem can be identified and analyzed using fishbone and Failure Mode and Effect Analysis method. The improvements proposed to get are got from the highest Risk Priority Number value (RPN), which occurs in Machine (RPN = 128), Method (RPN = 112), Man (RPN = 112), and Material (RPN = 72)
Peningkatan Yield Secondary Processing di PT “X” Wijaya, Valencia; Octavia, Tanti
Jurnal Titra Vol 2, No 2 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

The percentage of unaccountable in the Secondary Processing Department during 2013 (early 2014) is 0.66%. There are three factors that affect that percentage. Those are processed tobacco spillage, tobacco stem, and another factor that has not been identified. The reduction of processed tobacco spillage and tobacco stem will reduce the percentage of unaccountable. Improvements that implemented are providing tools and modify some machines at Feeding to SKM Area, changing Stem Box’s setting, replacing broken parts from Stem Box, and providing sieving tools. Other improvement is implementing work instruction to prevent the clean processed tobacco spillage become waste. Improvements that implemented had reduced the percentage of unaccountable and had increased the Yield Secondary Processing by 0.13%.
Pembuatan Dokumentasi HACCP di Plant-1 PT X Megawati, Maria Yohana; -, Felecia
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT X is one of coconut oil company in Indonesia with copra and Crude Palm Oil (CPO) as raw material.  PT X has ISO 9001:2008 certification, and now they want to get ISO 22000:2005 certification to gain customer satisfaction. One of ISO 22000:2005 requirement is certification of HACCP. This thesis intended to prepare HACCP at Plant-1 PT X. This preparation have been done until making of HACCP team, product description, making of flowchart, making of principle one until principle seven of HACCP. Result of this thesis has been done until making follow up steps for every Critical Control Point (CCP). Problems that occurs in CCP  are metal, oil and grease may contaminate coconut oil. Suggestions that given for these problems are oil and grease must be changed into food grade oil and grease and application of metal trap. Result of implementation that has been done is given metal trap for every section that highly risk contaminated by metal.
Peningkatan Kepuasan Konsumen Internal untuk Material Shipment di PT. X Tanojo, Stephanie; Octavia, Tanti
Jurnal Titra Vol 2, No 2 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. X measures internal customer satisfaction using an index called Internal Supplier Service Rate (ISSR) monthly. One of the order intake in PT. X is material that called as material shipment. Currently, Order intake for material shipment was increasing, but the increasing not in line with the ISSR. PT. X only achieved ISSR as 89,5% in 2013 which target is 95%. This final assignment attempts to increase ISSR in material shipment activity. The proposed improvements are standar work flow, material forecast for Supplier, coordination between company and Supplier, and an additional staff for material shipment. The proposed improvements are implemented and the ISSR increases to 97,5%.
Value Stream Mapping sebagai Upaya Pengurangan Waste di Departemen S PT A Sudjianto, Novitriana Anggraini; Bendatu, Liem Yenny; Widyadana, I Gede Agus
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT A is a manufacturer company which produces cigarette. PT A wants to do continuous improvement by keeping on reducing waste in S department. Value Stream Mapping (VSM) is a method that has been used to identify value added activity and non value added activity (waste) in that company.Based on the current value stream mapping of brand Y, there are 3 types of wastes which are inventory, transportation, and waiting. The proposed improvements will reflect in the future value stream mapping and reduce the total lead time by 5.82 %.
Perbaikan Work Cell XCSPA dengan Metode Lean Six Sigma Hansen, Chris; Widyadana, I Gede Agus
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

This study discuss about XCSPA product’s work cell with lean problem WIP after curing process with the maximum location capacity 2640 pieces. Quality issue with main problem contact resistance has resistance value above 25 mΩ, will impact to product function. This study objective is doing improvement to work cell with Lean Six Sigma Method, for improve lean problem and quality issue. In this research, DMAIC is used to solve the problem, however we did not discuss the Improve step. Value Stream Mapping tool used for knowing value added and non-value added process with improvement opportunity. Quality tool using Process Failure Mode & Effect Analysis (PFMEA) for finding cause of problem and potential problem can be happened in XCSPA Work Cell. Reduction of WIP by rearrange WIP quantity between process that will reducing about 85.49% WIP quantity from VSM current state WIP quantity. Quality issue eliminated by change and modify production process. Eliminate quality issue will impact to CNQ reduction for the reject product. Target achievement stated has accomplish that was reduction of PLT from contribution of WIP reducing, otherwise MDR, PRR still can’t be monitored. There’s 26 improvement suggestion, with 11 suggestion done, 7 suggestion in progress, 5 suggestion not yet implemented, 3 suggestion aborted.
Perencanaan Sistem Pengendalian Kualitas di PT. Surya Putra Barutama Santoso, Joseph; Rahardjo, Jani
Jurnal Titra Vol 2, No 1 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. Surya Putra Barutama is a company that produces trucks and the others heavy equipment which Dump Truck as their main product. In order to maintain the customer’s satisfaction on supplying a good quality product, the company has obtained ISO 9001:2008 in 2009. It shows the company has implemented a good quality management in accordance to the guidelines of quality standards. During the production, the company has the objective to produce a good product and having less number of defects to the product. However, the fact shows that the defect rate is still relatively high and even exceeds the standards and tolerances specified. This study aims to determine the quality plan  for each processes by using statistical tools that are useful to control the level of defective products. The results of the Pareto diagram analysis shows that the priority defect are Over Painting (63%), Dirty Painting (60%), Uneven Paint (51%), Rough Paint (43%), Less Paint (29%), Power Take Over (53%), Porous Welding (45%), SpakBoard (39%), Less Welding (26%). The next step is to find the cause of the above defects with cause and effect diagram. It results that the cause are derived from human factors/worker, working methods, materials/raw materials and work environment. The company can take these causes into consideration on applying the Quality Plan. Quality Plan describes the quality characteristics of each process and department have standards and tolerance limits. Quality Plan also describes how the inspection and work procedures. Tub Assembly Quality Plan, SubFrame Assembly Quality Plan, Component Assembly Quality Plan, Painting Quality Plan and Finishing Quality Plan has been prepared to improve the quality planning systems and reduce the amount of re-work at the finishing stage. Preparation of Painting Quality Plan is included with the Painting Work Instructions.

Page 3 of 95 | Total Record : 949