cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 949 Documents
Perancangan Sistem Manajemen Pergudangan di PT. Intidaya Dinamika Sejati Daniel Wahyuning Laksono; Herry Christian Palit
Jurnal Titra Vol 11, No 1 (2023): Jurnal Titra 11(1) Januari 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Intidaya Dinamika Sejati is a workshop company as well as the official holder for importers of blowers and vacuums in Indonesia with Pedro Gil and Becker as its brands. As a company that has a vision and mission to become a public company, it is appropriate to need a stable system that has a concept of continuous improvement to support success. This research began with the purchase of goods which are always processed even though the availability of goods was adequate, the cause of this incident was the difference in the physical stock in the warehouse with the stock recorded in the system. The purpose of this research was none other than to find out the root cause of the problem from the incompatibility of recording and storage data. The research was conducted by observation method. The results of the study stated that the discrepancy was caused by logistics management and warehouse management that lacked discipline both from the operational and warehouse management side, which resulted in discrepancies in the recording results. Through the results of the analysis, it is found a suggestion in the form of using the bar code method which includes rearranging the storage system, updated operating standards, and an organized recording method. From the result, it is expected to provide a concept that can be implemented and as a support in the company development process.
Perancangan dan Implementasi Sistem Manajemen Mutu ISO 9001:2015 PADA PT. X Albert Lucano Effendi; Jani Rahardjo
Jurnal Titra Vol 11, No 1 (2023): Jurnal Titra 11(1) Januari 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. X is a heavy duty roller conveyor manufacturer based in Indonesia. The growing market and tense business competition are pushing the company to expand the business locally and internationally in order to survive. To expand the business network, the company must have a quality management system based on ISO 9001:2015. The company wants re-certification with more improved and sustained operation. The previous gap analysis shows that the company still hasn't managed to complete each clause to 100%. Lack of human resources impact on the implementation of ISO 9001:2015.
Perancangan Dokumen Persiapan Sertifikasi ISO 17025:2017 untuk Laboratorium Perkerasan dan Bahan Jalan Sean Rennard Tirtawijaya; Jani Rahardjo
Jurnal Titra Vol 11, No 1 (2023): Jurnal Titra 11(1) Januari 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Petra Christian University Pavement and Road Materials Laboratory requires the design of an SNI ISO 17025:2017 document. The design of the document is carried out so that the Pavement and Road Materials laboratory gets accreditation so that the test results can be recognized internationally. This research was conducted by analyzing the initial gap of the document, identifying the business process, creating the document, verifying the document, and analyzing the final gap of the document. The results of the initial gap analysis show that the Pavement and Road Materials Laboratory only has 5 documents with a percentage of 6.76%. Document creation is done by making adjustments to existing documents and designing and creating documents that do not yet exist. After the document creation process is complete, the document is verified, the results of the final document gap analysis show that the completeness of the document has increased by 72.97%. The completeness of the final documents for the Pavement and Road Materials Laboratory is 79.7% with a total of 59 documents.
Usulan Perbaikan Lean Manufacturing untuk Mengevaluasi Waste Produksi Packaging pada PT. Temprina Media Grafika William Nico Widodo; Jani Rahardjo
Jurnal Titra Vol 11, No 1 (2023): Jurnal Titra 11(1) Januari 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Temprina Media Grafika is a company engaged in manufacturing packaging production. In the production process PT. Temprina still needs to maximize efficiency and minimize waste. The Lean Manufacturing design uses the Value Stream Mapping method to map the existing problem conditions in the production process and evaluate them. VSM development begins with the creation of the current state VSM, then VSM Kaizen Lightening Burst to focus on the parts of the production station that will be repaired, and VSM Future State to map the flow of the production process after applying alternatives and improvements. The results of the initial analysis of the production process have a VA time of 1,738 minutes, NVA of 1.078 minutes, and a total Lead Time of 2.816 minutes. After identification, analysis, and mapping of the VSM Future State, the VA time did not change, namely 1,738 minutes, the overall NVA decreased to 387 minutes, causing the Total Lead Time to decrease to 2.125 minutes, so that the Total Lead Time experienced a faster improvement by 691 minutes or 24.54%.
Upaya Penurunan Kecacatan Produk dan Perancangan Monitoring Proses Produksi di CV Jamatex Raoulian Witarto Tjandra; Herry Christian Palit
Jurnal Titra Vol 11, No 1 (2023): Jurnal Titra 11(1) Januari 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

CV Jamatex is a company engaged in the textile industry. One of the products produced by CV Jamatex is a patterned rayon fabric. The high level of defects and the absence of monitoring of the production process are the two biggest obstacles experienced by CV Jamatex. In the analysis of the problem for a high level of defects in this report, there are four types of defects, namely the types of defects in the rayon fabric which are stained, faded, torn and dirty. To analyze the level of disability is done using the five whys analysis method. For these four types of defects, improvement plans have been made, in the form of form printing worksheets, machine maintenance worksheets, work instructions, and prototype stenter machine aids. Whereas for problem analysis there is no monitoring of the production process, this is because monitoring at CV Jamatex is still quite simple. The design of the improvements made is to monitor the production process through the Microsoft Excel platform. The design of improvements in this final project report aims to overcome two problems that occur at CV Jamatex. The company has validated the proposed improvements.
Perancangan Sistem Manajemen Jig Departemen Finishing Central Pada PT. X William Salim Wijaya; Iwan Halim Sahputra
Jurnal Titra Vol 11, No 2 (2023): Jurnal Titra 11(2) Juli 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT X is a company that is engaged in the gold jewelry industry. The problem found in the company is that the jig management system currently used by the company for the maintenance and repair process is not working well because the current system can be said to be ineffective. The problem causes many damaged jigs that require repair but are not immediately repaired because the current system is complicated for companies to detect damaged jigs. If the damaged jig is still used, it will cause the goods to be worked on to become defective and have to undergo a re-process. The number of technicians on duty is also limited so it requires a structured system so that technicians can make the best use of time in performing maintenance or repairing Jigs. So improvements are proposed in the form of methods to overcome the shortcomings or gaps of the current system. The methods will be related to automation to reduce errors from intentional or unintentional workers. Furthermore, a Standard Operating Procedure (SOP) is also made regarding the methods used by technicians in the Jig maintenance or repair process. 
Upaya Penurunan Jumlah Breakdown dengan Metode Reliability Centered Maintenance di PT. Sentosa Laju Sejahtera Site SLS-Bosowa Elian Sasmita Wijaya; Kriswanto Widiawan
Jurnal Titra Vol 11, No 2 (2023): Jurnal Titra 11(2) Juli 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Sentosa Laju Sejahtera is a contracting company engaged in coal and mineral mining industry. PT. Sentosa Laju Sejahtera is facing low reliability problem due to a high rate of functional failures. To address this issue, a study was conducted using Reliability Centered Maintenance (RCM. The goal of RCM is to determine the best type of maintenance. RCM is assisted by two other methods, namely Failure Mode and Effect Analysis (FMEA) and Fault Tree Analysis (FTA). FMEA aims to identify the models that has highest number of failures and rank them based on the highest risk value. Model AXOR 2528CH had the highest number of failures, with 2416 failures or 47% of all models. The two main causes were tyre component and brake system component. FTA aims to identify the root causes of problems related to the method, man, material, machine, measurement, and environment factors. The proposed solutions include implementing tyre inspection, ensuring consistency in brand selection, and creating tyre report. These proposed solutions have resulted in a decrease of 23.5% in the number of functional failures of the tyre components compared to April 2022 and an increase of 50.68% in the average duration of tyre component failures.
Upaya Peningkatan Kapasitas Produksi & Koeifisien Efisiensi Improvement di Proses K-Contactor Backend pada PT X Alexander Alfredo; Siana Halim
Jurnal Titra Vol 11, No 2 (2023): Jurnal Titra 11(2) Juli 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT X is a company engaged in the electrical sector. This research was conducted to increase production capacity due to a surge in demand of 8% from the previous year for K-Contactor products. PT X has an average production of 342 contactors per hour and has been unable to meet the new K-Contactor production target. PT X wants to increase production capacity by 375 pcs per hour. The new target was given to meet the surge in demand. Then the company also wants to improve the Coefficient Efficiency rate towards 80%, which is currently still between 65-75%, which will automatically increase if the production target is reached, then the Coefficient Efficiency rate will automatically increase.
Hazard Identification, Risk Assessment, and Risk Control di PT. Intan Utama Felicia Ellen Wijaya
Jurnal Titra Vol 11, No 2 (2023): Jurnal Titra 11(2) Juli 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Intan Utama is a service company where one of its businesses is engagedin the interior design contracting business that produces various kinds of furniture products. Until now the company does not have a HIRARC document. This final project aims to identify hazards, carry out risk assessments, and create risk control plans for hazards in the company's production area. After conducting research, there are 8 activities with 15 sub-activities in the production area which includes warehouses. This research is only focused on sub-activities that have extreme and high risk ratings. In the production area of the 15 sub-activities there is an extreme risk rating category with a total of 2 cases, and a high risk rating category with a total of 9 cases. In hazard riskcontrol there are 14 administrative controls, 7 controls by carrying out technical designs, 1 control by substitution and 6 controls using PPE. If risk control is carried out, it is estimated that the risk rating will be moderate with a total of 18 cases and low with a total of 15 cases which the company is also willing to pay for from the proposed controls that have been given.
Identifikasi Bahaya, Penilaian Risiko dan Upaya Pengendaliannya: Studi Kasus di Departmen Papercore PT. XYZ Febiana Puspita Jatiningtyas; Kriswanto Widiawan
Jurnal Titra Vol 11, No 2 (2023): Jurnal Titra 11(2) Juli 2023
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In this increasingly advanced era, almost all products are sold using plastic-based packaging. One of these plastic packaging products is produced at PT. XYZ. In supporting the production process, PT. XYZ needs raw material in the form of the paper core which is produced by PT. XYZ in the Papercore Department. This study aims to find out what potential hazards exist in the new department, then how much risk assessment is obtained, and what controls can be carried out. The method used in this study is HIRARC assisted by observation and interviews with production workers and other company parties. In practice, this research will focus on identifying existing potential hazards, assessing hazard risks, and proposing risk controls. There were 15 potential hazards with a high and medium risk rating, consisting of 9 mechanical categories, 5 chemical categories, and 1 ergonomic category. The proposed risk controls include technical engineering, administrative controls, and the use of PPE. From the existing risk controls, a reduction in the potential hazard risk rating was obtained to 15 hazards with a low-risk rating.