cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota malang,
Jawa timur
INDONESIA
Journal of Engineering and Management in Industrial System
Published by Universitas Brawijaya
ISSN : 23383925     EISSN : 24776025     DOI : -
Core Subject : Engineering,
Journal of Engineering and Management in Industrial System is a peer reviewed journal. The journal publishes original papers at the forefront of industrial and system engineering research, covering theoretical modeling, inventory, logistics, optimizations methods, artificial intelligence, bioscience industry and their applications, etc.
Arjuna Subject : -
Articles 216 Documents
ANALISIS PERBAIKAN WORK STATION PADA PROSES PRODUKSI GARMENT DENGAN MENGGUNAKAN PENDEKATAN ANTHROPOMETRI Mentari Rasyid; Surachman Surachman; Sugiono Sugiono
Journal of Engineering and Management in Industrial System Vol 4, No 1 (2016)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (347.953 KB) | DOI: 10.21776/ub.jemis.2016.004.01.10

Abstract

ABSTRACT  Productivity garment greatly influenced by the work station facilities and presence in the workplace . UD Aliya -  Malang is one example as an object of research . Based on the research conducted , there are still some problems . This is also supported by the operator of complaints about the draft working facilities , the work table is often used as a medium to carry out the activity of cutting material (cloth or canvas). Incompatibility between the dimension table with the body dimensions of operators resulted in operators often complain , and perform movements beyond the normal limits . By using anthropometric approach , the results obtained is the size of the table corresponding to the dimensions of the body of the operator , namely the size of the table is 117cm x 69cm x 98,41cm . Keywords: Work Station, Facilities of Work, Anthropometry
ANALISIS PERBANDINGAN UTILITAS DAN PERILAKU PEMANFAATAN PELICAN CROSSING DI AREA UNIVERSITAS BRAWIJAYA Ratih Ardia Sari; Remba Yanuar Efranto; Amanda Nur Cahyawati
Journal of Engineering and Management in Industrial System Vol 4, No 2 (2016)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (359.878 KB) | DOI: 10.21776/ub.jemis.2016.004.02.5

Abstract

Pelican Crossing is one of  facilities that available in Malang City for pedestrians. Although it had been provided, pedestrians sometimes donot utilize this pelican crossing. This research would be carried out a comparative analysis of pelican crossing utilization and road user behavior on Veteran and MT Haryono street. Worksampling was used to determine the utilization of pelican crossing. From this study, pelican crossing utilization in Veteran street higher than in MT Haryono street during weekday at 51%. The behavior of road users could be seen in the breakdown of activities undertaken at the time of observation. The behavior of road users tend to be more dicipline in the pelican crossing in MT Haryono compared with Veterans.Percentage of incompatibility used of pelican crossing by road users at Veteran's higher than MT Haryono. Incompatibility use of pelican crossing due to the ignorance of community about crossing facilities, undicipline behavior of road user and malfunction of the pelican crossing
STUDI FAKTOR KANSEI PADA PRODUK BERBASIS KEARIFAN LOKAL (STUDI KASUS: BATIK MALANGAN) Dewi Hardininingtyas; Ishardita Pambudi Tama; Agustina Eunike; Debrina Puspita Andriani
Journal of Engineering and Management in Industrial System Vol 4, No 2 (2016)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (540.399 KB) | DOI: 10.21776/ub.jemis.2016.004.02.6

Abstract

One product that has a short life cycle is a fashion products where the consumer desires can influence the company's decision to develop the product. Batik is one of Indonesian local wisdom, which not all of batik in Indonesia has a high popularity, such as Batik Malangan. Kansei Engineering method used in this study to identify the implicit desire of users in the form of feeling, emotion, or perception when interacting with Batik Malangan. By implementing the procedures Kansei Engineering Type I, there are 30 words that appear using 14 stimulants of Batik Malangan. Statistical data analysis performed using multivariate analysis. The most important kansei words chosen by using Factor Analysis and Principal Component Analysis. In this study, a total of 61 respondents who are citizens of Malang and from outside Malang participated. For customers, the main attraction at the Batik Malangan is the motive, whether the primary motive, secondary motive, nor the isen motive. Until now, Batik Malangan’s motive not yet have a characteristic, so it is less well known by customers. Overall, this study contributes to that Kansei Engineering is a method that can be used to capture the feeling of customers mainly on customized products. With so many product variations based on local wisdom should be able to be developed by actually capturing the customer's desire, not only explicit but also implicit.
DETERMINATION OF PART SPECIFICATION AND CRITICAL PAR FOR FOOD PACKAGE IMPROVEMENT AT MSME AE JAYA BATU BY USING QFD METHOD Rika Amartha Wulandari; Yuswono Hadi
Journal of Engineering and Management in Industrial System Vol 5, No 1 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (820.251 KB) | DOI: 10.21776/ub.jemis.2017.005.01.3

Abstract

MSME AE Jaya is a food industrial company which produces Bakpia. It is located in Jalan Samadi Batu City. Recently, AE Jaya markets its products in Batu and Malang city. During its marketing, it faces some difficulties and problems in selling the products. Such as it is not accepted in a particular supermarket or even in a souvenir shop. It is because the standard packaging of its bakpia is not fulfilled yet. Not only that, it is also because the packaging is less interesting and less hygienic. Due to this condition, therefore a research is needed. The research aims to identify consumers’ attributes, technical requirement attributes and critical part attributes in bakpia’s packaging that produces by AE Jaya. Those aspects could be very helpful in identifying or knowing some information about an interesting packaging design and how to make a good packaging which is appropriate with consumers needs. The method used in this research is called Quality Function Deployment. The researcher used the first phase and the second phase of QFD. Based on the analysis that has been conducted, there are 8 consumers’ attributes, 10 technical requirement attributes and 9 critical part attributes.
THE INTEGRATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD AND LEAN MANUFACTURING CONCEPT TO IMPROVE PRODUCTION PERFORMANCE (CASE STUDY: FERTILIZER PRODUCER) Adi Yermia Tobe; Denny Widhiyanuriyawan; Lilis Yuliati
Journal of Engineering and Management in Industrial System Vol 5, No 2 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (596.615 KB) | DOI: 10.21776/ub.jemis.2017.005.02.7

Abstract

High machine downtime and large number of rejected products is still become a big problem for company as a research object in this study. Overall Equipment Effectiveness (OEE) is one of the methods used to measure the effectiveness of a machine with three measurement factors, namely; availability rate, performance rate, and quality rate. The integration of OEE measurement and lean manufacturing analysis method is employed to improve production system in company. The measurement result shows that the value of availability rate is 88.82%, performance rate 93.70%, and quality rate 98.20%; then the OEE values obtained 81.73%. The root cause is investigated by using FMEA (Failure Mode and Effect Analysis) method particularly from the RPN (Risk Priority Number).
INVENTORY CONTROL OF CRITICAL SPARE PART BASED ON FNS ANALYSIS Niken Trisnawati; Oyong Novareza; Agustina Eunike
Journal of Engineering and Management in Industrial System Vol 4, No 1 (2016)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (342.484 KB) | DOI: 10.21776/ub.jemis.2016.004.01.2

Abstract

Krebet Baru I Sugar Factory is a producer of sugar that operate on the milling season that start from June until November 2015. The problem that occured in the Krebet Baru I were ineffectively and inefficiently spare parts inventory policy that cause stockout and led to production process stoppage. This research used FNS analysis for the classification spare parts and EOQ Probabilistic method for calculation of stockout probability, optimum Q and ROP,  total cost, also service level which were would be compared with existing policy. The research resulted that 44 types of spare parts categorized as urgent, 8 types else categorized as critical. EOQ Probabilistic method was chosen as the best method of control policy, with total cost reduction  by 12%-93% and service level increase by 995-100% than existing policy which resulted a total cost by Rp 5.004.890 – Rp 142.647.057 and service level by 0%-30%. 
INVESTMENT ANALYSIS OF ADDITIONAL WAREHOUSE AT CEMENT DISTRIBUTE WITH A METHOD OF ANALYTIC HIERARCHY PROCESS Fidyah Mawarda; Rahmi Yuniarti; Wifqi Azlia
Journal of Engineering and Management in Industrial System Vol 4, No 1 (2016)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (934.421 KB) | DOI: 10.21776/ub.jemis.2016.004.01.7

Abstract

Cement Industry for distribute product to consumer has many distributors for each district. One of them an Pasuruan. Pasuruan Distributor has problem that cement’s demands are increasing significantly but  sales are decreasing. This phenomenon happened because of the limited capacity of warehouse about 352 m2. Therefore, they planning to additional warehouse capacity with three options (1) Build new warehouse, or renting warehouse from location (2) A or location (3) B. Distributor should conduct a feasibiility study in order to determine the best option. In this research, Analytic Hierarchy Proces) is used to know the interest rate of each criteria. The criteria are location, wide of location and cost. The results shows that AHP value for building warehouse is 0,327. In the other hand, AHP Value for renting warehouse A and B are  0,448 and 0,225. Based on this comparison, rent A will be the best option as it has the highest AHP.
PENGUKURAN DAN PERBAIKAN TOTAL PRODUCTIVE MAINTENANCE (TPM) MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN ROOT CAUSE FAILURE ANALYSIS (RCFA) Amrussalam Amrussalam; Purnomo Budi Santoso; Ishardita Pambudi Tama
Journal of Engineering and Management in Industrial System Vol 4, No 2 (2016)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (590.639 KB) | DOI: 10.21776/ub.jemis.2016.004.02.1

Abstract

Total productive Maintenance (TPM) is an initiative to optimize the effectiveness  of manufacturing equipment which the objectives are elimination of all accidents, defects and downtimes [5].  The fundamental measurement of   TPM    using  a method   called the Overall Equipment Effectiveness (OEE). The study  was began by  root cause   identification of losses using  Root Cause Failure anaysis (RCFA), OEE was calculated based on the metrics  calculation which consist of availability metrics, performance metrics, and quality metrics, while reliability was calculated based on the value of MTBF.It is followed by recommendation of TPM  for  improvement of  losses .  The results  of this study  indicate that the value of OEE is not  achieve of world-class standards, where OEE is only  35,38%. The  factor witch greatly affects of   poor  OEE and reliability is  downtime loss  in the machine, which   is 2394,8 sec / process / day or 88,07% of all total losses. The proposed  improvements of losses  are application  of Autonomous Maintenance and  5S concept, making of  the preciseprocess operating standard   based on  the machine conditions,  need for planned maintenance, focused improvement,  quality maintenance and most important, supervision of the machine operator.
PENILAIAN KINERJA PERUSAHAAN MEBEL DARI PERPSPEKTIF KARYAWAN DENGAN MENGGUNAKAN METODE AHP DAN OMAX Sri Widiyawati
Journal of Engineering and Management in Industrial System Vol 4, No 2 (2016)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (141.117 KB) | DOI: 10.21776/ub.jemis.2016.004.02.7

Abstract

Increasingly rapid technological development has resulted in the current business competition is getting tougher. With the increased competition, the company should be able to apply the right strategy at all levels in order to meet the wishes of stakeholders. As an organization that is oriented to profit (profit oriented), during this performance measure based solely on the financial aspects of using profitability ratios. Besides measured by profit, the company's success in improving the company's performance is highly dependent on the quality of Human Resources (HR). The company's performance appraisal conducted using Analytical Hierarchy Process (AHP) that can help decision-making within the company relating to the employee. To make an assessment based on ranking or score will be used method Objective Matrix (OMAX). Scoring system based on the calculation that the data obtained are 4 KPI that fall into the red category. Among them is the KPI-2 (an increase in welfare), KPI-5 (level of discipline employees, KPI-6 (degree of achievement of employee productivity, and KPI-7 (rate of sick employees). There is also a 6 KPIs included in the yellow category. from the results of the scoring system showed that during the company's performance can not be achieved with good when viewed from the perspective of employees for only six KPIs are included in the green category and 10 KPIs others included in the category of critical KPI / needs improvement. Keywords company's performance appraisal, employee perspective, Analytical Hierarchy Process (AHP),OMAX.
RISK ANALYSIS BY COMBINING FAULT TREE ANALYSIS (FTA) AND ANALYTIC HIERARCHY PROCESS (AHP) METHOD APPLICABLE TO CANE CUTTER MACHINE Oyong Novareza; Chindy Elsanna Revadi; Remba Yanuar Efranto
Journal of Engineering and Management in Industrial System Vol 5, No 1 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2057.688 KB) | DOI: 10.21776/ub.jemis.2017.005.01.5

Abstract

2000 times of downtime had been occurred during year 2013 to 2014 in Tjoekir sugar factory. The most serious downtime occurred in mill. Fault Tree Analysis (FTA) was employed to analyze the probability score and implement Analytic Hierarchy Process (AHP) to find out impact score of risk event. The results of FTA indicate that risk event in cane cutter blade had the highest probability score, while results of AHP shows that the decrease of steam pressure in turbine drive had the highest impact score. The scores classified in risk class and mapped in risk matrix show that there were three risk events. Tjoekir has to set a conveyor gate to filter canes before being received by the machine, use blades with the thickness not exceed 22 cm to avoid fatigue, and check harvested cane thoroughly that is loaded onto carriers to ensure no machete is accidently loaded with the cane.

Page 7 of 22 | Total Record : 216