cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surakarta,
Jawa tengah
INDONESIA
Jurnal Ilmiah Teknik Industri
ISSN : 14126869     EISSN : 24604038     DOI : -
Core Subject : Engineering,
Jurnal Ilmiah Teknik Industri is a scientific journal that aims to participate in developing the scientific field of Industrial Engineering, contains the results of research and theoretical study from lecturers, researchers and industry practitioners. Jurnal Ilmiah Teknik Industri is administered by the Department of Industrial Engineering, Faculty of Engineering, Universitas Muhammadiyah Surakarta and published by the Muhammadiyah University Press (MUP).
Arjuna Subject : -
Articles 22 Documents
Search results for , issue "Vol. 19, No. 02, December 2020" : 22 Documents clear
Analysis of Postponement Practice in Cement Supply Chain: A Case Study Romadlon, Fauzan; Kurniawan, Hadi; Ananda, Ridho
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.11343

Abstract

This research focuses on assessing implementing postponement in a cement industry especially for OPC (Ordinary Portland Cement) in Indonesia. The company offers three postponement points; Ciawi and Kampung Rambutan, and Jatiwarna. This research has been done with observational method to map customer condition. Moreover, implementing linear programming model is used to gain optimal solution for allocated truck. The results are, highest proportion of OPC customer is in Jakarta, followed Karawang, and Bogor. The result from linear programming model simulation, Ciawi point is assigned to serve Jakarta and Bogor’ customers, Kampung Rambutan point is assigned for Jakarta and Kawarang’ customers, and Jatiwarna point is prepared for Jakarta, Karawang, Bekasi, Lampung, Pekalongan, Tangerang, and Serang’ customers. So, implementing postponement can increase customer satisfaction without adding higher cost such as investment cost. The cement industry encounter effectiveness and responsiveness even tough, some problem shall be taken such as double administration process (manual and computerized).
Designing The Proposed Improvement of TIX ID Online Cinema Ticket Purchase Service Quality Julya Ditazha; Eko Pujiyanto; I Wayan Suletra
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.11540

Abstract

TIX ID is application in Indonesia that provides new experiences in purchasing cinema tickets. The success of a company can be seen from service quality in fulfilling the satisfaction of customers. Therefore, the purpose of this study is to designing the proposed improvement TIX ID online cinema ticket purchase service quality. This study was conducted in three stages, namely testing the hypotheses of the relationship between variables using PLS-SEM, measuring service quality using the servqual method, and designing the proposed improvement. The result of this study is e-service quality has a significant effect on e-satisfaction and e-loyalty. In addition, the dimensions of e-service quality are dominant effect on the low TIX ID service quality is compensation, with a gap of 27%. Recommendations for improvement are providing customer access to be able to contact customers service directly and SOP of the cooperation TIX ID and DANA.
Disruptions Control on Precast Concrete Supply Chain in Construction Projects Iveline Anne Marie; N. Nilla; Nora Azmi; Yayang Ade Suprana
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.11791

Abstract

Agility amid uncertain circumstances is key to all-across sustainable industries, and the construction industry depends heavily on projects as potent drivers to their operational activities regardless of projects’ hardwired constraints—shipment, resistance to risks— to affect Key Performance Indicator (KPI). PT ABX as one of Indonesian precast-concrete manufactures is the object of this research aiming to find precautionary strategies for controlling disruptions to concrete supply chain in construction projects. It takes into account such supply-chain disruptions, and therefore, the two-layered model of House of Risk (HOR) to subsume risks identification and risks control is applicable for minimizing possible disruptions. It finds risk events some of which are classified as critical risk events and preventive actions against risks. The findings contribute to working framework for managers responsible for applying effective strategies for preventing such disruptions. 
Redesign of OrthoLPPDUNS External Fixation for Bone Reconstruction Using the Function Analysis System Technique (FAST) Method Lobes Herdiman; Ilham Priadythama; Susy Susmartini; Yusuf Priyandari; I Nyoman Suci Anindya Murdiyantara; Durkes Herlina Apriani
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.10732

Abstract

Taylor Spatial Frame (TSF) better known as an external fixation product from several types of fixation devices in the orthopedic field. The Laboratory of Product Planning and Design has manufactured TSF or called OrthoLPPDUNS external fixations. The OrthoLPPDUNS design found that frame instability forming ring-strut angles caused by strut screw rotations was feeling rough due to backlash. The purpose is how to redesign an OrthoLPPDUNS with a Function Analysis System Technique (FAST). FAST method is applied at each stage of starting from the information stage to the interpretation of the results. The OrthoLPPDUNS design with the joint system uses custom components that cause weakness in frame stability. The use of standard components in joint systems can provide solutions to external fixations, although there are still weaknesses in the ring-strut angle. The OrthoLPPDUNS redesign has a better success rate in terms of stability parameters, allowing more precise bone reconstruction.
Analysis of Postponement Practice in Cement Supply Chain: A Case Study Fauzan Romadlon; Hadi Kurniawan; Ridho Ananda
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.11343

Abstract

This research focuses on assessing implementing postponement in a cement industry especially for OPC (Ordinary Portland Cement) in Indonesia. The company offers three postponement points; Ciawi and Kampung Rambutan, and Jatiwarna. This research has been done with observational method to map customer condition. Moreover, implementing linear programming model is used to gain optimal solution for allocated truck. The results are, highest proportion of OPC customer is in Jakarta, followed Karawang, and Bogor. The result from linear programming model simulation, Ciawi point is assigned to serve Jakarta and Bogor’ customers, Kampung Rambutan point is assigned for Jakarta and Kawarang’ customers, and Jatiwarna point is prepared for Jakarta, Karawang, Bekasi, Lampung, Pekalongan, Tangerang, and Serang’ customers. So, implementing postponement can increase customer satisfaction without adding higher cost such as investment cost. The cement industry encounter effectiveness and responsiveness even tough, some problem shall be taken such as double administration process (manual and computerized).
Six Sigma as a Method for Controlling and Improving the Quality of Bed Series Products Octa Bimansyah Untoro; Irwan Iftadi
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.11623

Abstract

The research was conducted at PT. XYZ where there were defect problems in bed series products so that additional time is needed to repair a product. One way to make improvements and improve quality in a production process is the Six Sigma method with the stages of DMAIC. The results of the calculated average of DPMO values and Sigma Level have the result 58558.56 and 3.07 which are still not good because still far from 6 sigma. After that analyzing the root causes of defect product problems, then the priority problem is carried out using (RPN) where the highest value is at the assembly work station because the material that has been used up in the warehouse has an RPN of 405 so that it becomes a top priority for repairs. With the standardization and documentation, proposed improvements that have been given then the possible defects of Electric Lovina Bed 3 Motor will be reduced.
Factors Affecting The Implementation of Green Procurement: Empirical Evidence from Indonesian Educational Institution Ilyas Masudin; Bangalie Summah; Fien Zulfikarijah; Dian Palupi Restuputri
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.10718

Abstract

This paper reported the factors affecting the adoption of green procurement in Indonesian educational institutions.  A quantitative method is used to understand the effects between variables on green procurement implementation. Data from respondents working on the divisions of procurement from higher degree institutions in the province of East Java Indonesia are collected in this study. The results were indicated that there are no significant effects on middle management staff, awareness, and corporate responsibility on the implementation of green procurement on educational institutions. At the same time, there is a significant impact of green supply approaches such as ISO certification and eco-design product strategy on the adoption of green procurement.
Understanding Behavior of Household Food Waste Management: Food Waste Hierarchy Context Luthfina Ariyani; Kirana Rukmayuninda Ririh
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.11994

Abstract

The determinant factor identification of behavior considers as an important means in order to develop effective intevention towards household waste management in Indonesia. This study extended the Theory of Planned Behavior (TPB) by using the following construct: intention, attitude, subjective norm, perceive behavioral control, government intervention, environmental knowledge and awareness, as well as household planning and buying habit; to understand household waste management behavior from the ‘reduce-reuse-recycle’ point of view. The structural equation modeling (SEM) were used in this study and the result showed that the model accounted for relatively substantial amount (61.7%) of the variance in intention, with the attitude, subjective norm, and environmental knowledge and awareness emerge as significant predictor.  Above findings could be used by both governmental and non-governmental organization to formulate strategies to manage food waste at the household level.
Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast Machine Jasmine Raisya Salsabila; Fransiskus Tatas Dwi Atmaji; Aji Pamoso
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.11961

Abstract

Losses caused by unreliable machines in a production line will affect the total cost losses from a manufacturing company's production process. Based on historical data of damage that has been obtained from the maintenance department of XYZ companies, the MACH MWJ 9/10 Shot Blast Machine is the machine that has the highest-level frequency of damage. This machine is useful for cleaning sand or residual production dirt that sticks to workpieces that have been cast in the casting process, especially for E-Clips components. The research's purpose is to determine the value of cost losses due to machine unreliability using the Cost of Unreliability (COUR) method, with Business Consequence analysis (BC) analysis. The cost effects of these costs include Corrective COUR and Downtime COUR. The final calculation of COUR shows that the total cost of COUR Downtime caused by the unreliability of the machine is greater than the total Corrective COUR. After calculating the COUR, an analysis of the business consequences resulting from the machine's unreliability is carried out using a risk matrix. The analysis results show that the shot blast machine's critical components are in the red or high-risk category and have a very high Probability of Failure (PoF). The results of COUR analysis with business consequence analysis will be an input for the company to make a machine maintenance system policy, especially for the MACH MWJ 9/10 Shot Blast machine's critical components. In general, this research's novelty is to combine the application of the Cost of Unreliability method with an analysis of the effects of the Business Consequence caused by the machine's selected critical components.
Consolidation Model Recommendation for Rice Distribution in Indonesian Bureau of Logistics (West Java Regional Division) Fran Setiawan; Loren Pratiwi; Elisa Ferdilia Wigono
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.11908

Abstract

BULOG (Indonesian Bureau of Logistics) Regional Division West Java is a state-owned public company that regulates and maintains a supply of rice in order to meet the needs of all Indonesian people. Currently, BULOG distributing rice from one SubDivre warehouse to another SubDivre warehouse (point-to-point system) so shipping costs are higher because the frequency of transportation used is higher and the total distance traveled is higher. To reduce the cost of distribution, we propose consolidation model based on hub and spoke network topology. Hub and spoke system is done by determining which points become the hubs and which points become the spoke. The problem in determining the location of the hub and spoke is known as the hub location problem. In this problem, single allocation p-hub median problem is used. We use AMPL to get the solution. Various number of hubs (5,6,7) are tested and evaluated based on total shipping cost. The number of hubs which gives the minimum total shipping cost is 7. Delivery system using the hub and spoke network model can reduce the total cost of distribution by 13,94%.

Page 2 of 3 | Total Record : 22


Filter by Year

2020 2020


Filter By Issues
All Issue Vol. 22, No. 2, December 2023 Vol. 22, No. 1, June 2023 Vol. 21, No. 2, December 2022 Vol. 21, No. 1, June 2022 Vol. 20, No. 2, December 2021 Vol. 20, No. 1, June 2021 Vol. 19, No. 02, December 2020 Vol. 19, No. 1, June 2020 Vol. 18, No. 2, Desember 2019 Vol. 18, No. 1, Juni 2019 Vol. 18, No. 1, Juni 2019 Vol. 17, No. 2, Desember 2018 Vol. 17, No. 2, Desember 2018 Vol. 17, No. 1, Juni 2018 Vol. 17, No. 1, Juni 2018 Vol. 16, No. 2, Desember 2017 Vol. 16, No. 2, Desember 2017 Vol. 16, No. 1, Juni 2017 Vol. 16, No. 1, Juni 2017 Vol. 15, No. 2, Desember 2016 Vol. 15, No. 2, Desember 2016 Vol. 15, No. 1, Juni 2016 Vol. 15, No. 1, Juni 2016 Vol. 14, No. 2, Desember 2015 Vol. 14, No. 2, Desember 2015 Vol. 14, No. 1, Juni 2015 Vol. 14, No. 1, Juni 2015 Vol. 13, No.2, Desember 2014 Vol. 13, No.2, Desember 2014 Vol. 13, No. 1, Juni 2014 Vol. 13, No. 1, Juni 2014 Vol. 12, No. 2, Desember 2013 Vol. 12, No. 2, Desember 2013 Vol. 12, No. 1, Juni 2013 Vol. 12, No. 1, Juni 2013 Vol. 11, No. 2, Desember 2012 Vol. 11, No. 2, Desember 2012 Vol. 11, No. 1, Juni 2012 Vol. 11, No. 1, Juni 2012 Vol. 10, No. 2, Desember 2011 Vol. 10, No. 2, Desember 2011 Vol. 10, No. 1, Juni 2011 Vol. 10, No. 1, Juni 2011 Vol. 6, No. 2, Desember 2007 Vol. 6, No. 2, Desember 2007 Vol. 6, No. 1, Agustus 2007 Vol. 6, No. 1, Agustus 2007 Vol. 5, No. 3, April 2007 Vol. 5, No. 3, April 2007 Vol. 5, No. 2, Desember 2006 Vol. 5, No. 2, Desember 2006 Vol. 5, No. 1, Agustus 2006 Vol. 5, No. 1, Agustus 2006 Vol. 4, No. 3, April 2006 Vol. 4, No. 3, April 2006 Vol. 4, No. 2, Desember 2005 Vol. 4, No. 2, Desember 2005 Vol. 4, No.1, Agustus 2005 Vol. 4, No.1, Agustus 2005 Vol. 3, No. 2, Desember 2004 Vol. 3, No. 2, Desember 2004 Vol. 3, No. 1, Agustus 2004 Vol. 3, No. 1, Agustus 2004 Vol. 2, No. 3, April 2004 Vol. 2, No. 3, April 2004 Vol. 2, No. 2, Desember 2003 Vol. 2, No. 2, Desember 2003 Vol. 1, No. 3, April 2003 Vol. 1, No. 3, April 2003 More Issue