cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surakarta,
Jawa tengah
INDONESIA
Jurnal Ilmiah Teknik Industri
ISSN : 14126869     EISSN : 24604038     DOI : -
Core Subject : Engineering,
Jurnal Ilmiah Teknik Industri is a scientific journal that aims to participate in developing the scientific field of Industrial Engineering, contains the results of research and theoretical study from lecturers, researchers and industry practitioners. Jurnal Ilmiah Teknik Industri is administered by the Department of Industrial Engineering, Faculty of Engineering, Universitas Muhammadiyah Surakarta and published by the Muhammadiyah University Press (MUP).
Arjuna Subject : -
Articles 766 Documents
PENINGKATAN KUALITAS LAYANAN KEPADA PELANGGAN DI TERMINAL PENUMPANG PELABUHAN TANJUNG PERAK SURABAYA Hariastuti, Ni Luh Putu; Ardiansyah, Dwi Rifki
Jurnal Ilmiah Teknik Industri Vol. 12, No. 2, Desember 2013
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v12i2.645

Abstract

To be able to retain its customer, PT Pelindo III Tanjung Perak Surabaya must serve and fulfill what is desired by prospective passengers so that they can maintain the loyalty of passengers who use the services. In this observation, there are 6 criterias that have servqual value below the average values (-0.03746). The first criteria is, the capacity of the waiting room (seats) is adequate (-0.16206), comfortable waiting room (-0.1500), security of luggage passengers (-0.08232), hygiene at Tanjung Perak harbor (-0.06160), giving attention to the grievances of passengers (-0.05896), and management responsiveness to complaints of passengers (-0.05040). This indicates that the port services are still not able to fulfill customer expectations. Method to solve this problem is using the TRIZ method. Results obtained from the analysis using TRIZ,that acquired  4 solutions given to the manager. The 4 solutions are division of task should be differentiated according to the places that exist in the passenger terminal, the process of measuring the quality of services they provide in a regularly and periodically, changes in physical conditions, especially the addition of a seat and air conditioning (central) or fan.
PERANCANGAN SISTEM PENDUKUNG KEPUTUSAN UNTUK PEMILIHAN PEMASOK NATA DE COCO DENGAN METODE SIMPLE ADDITIVE WEIGHTING Pramudyo, Cahyono Sigit; Purnomo, Dian Eko Hari
Jurnal Ilmiah Teknik Industri Vol. 11, No. 1, Juni 2012
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v11i1.1126

Abstract

Pemasok nata de coco lembaran bagi CV. Agrindo Suprafood Yogyakarta merupakan suatu bagian yang penting bagi perusahaan. Saat ini, di perusahaan dalam melakukan pemilihan pemasok tidak kontrak menjadi pemasok kontrak terkadang mengalami kesulitan. Kesulitan terebut terjadi karena belum adanya kriteria yang secara rinci dapat dipergunakan untuk pemilihan pemasok. Sehingga pada penelitian ini akan berusahaan menemukan kriteria-kriteria yang berpengaruh dalam pemilihan pemasok. Pengolahan data pada penelitian ini menggunakan metode Simple Additive Weighting (SAW). Selain itu, model yang telah dibuat akan diimplementasikan menjadi suatu Sistem Pendukung Keputusan (SPK). Kriteria yang dapat mempengeruhi pemilihan pemasok adalah jumlah total, jumlah total kualitas satu, jumlah total kualitas dua, jumlah total nata rusak, jumlah pengiriman maksimal, jumlah maksimal kualitas satu, jumlah maksimal kualitas dua, jumlah maksimal rusak, jumlah pengiriman minimal, jumlah minimal kualitas satu, jumlah minimal kualitas dua, jumlah minimal rusak, kerutinan, harga kualitas satu dan harga kualitas dua. Di samping itu, berdasarkan hasil pengujian Sistem Pendukung Keputusan (SPK) yang telah dibuat diperoleh kesimpulan bahwa sistem yang telah dibuat dapat dipergunakan nantinya oleh CV. Agrindo Suprafood Yogyakarta.
PENGURANGAN WASTE MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING Jakfar, Akhmad; Setiawan, Wahyu Eko; Masudin, Ilyas
Jurnal Ilmiah Teknik Industri Vol. 13, No. 1, Juni 2014
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v13i1.320

Abstract

PT. XYZ is one of some cigarette companies in Indonesia. In producing cigarette, the firm requires a material named ?etiket? which is produced by printing division for internal consumers of PT. XYZ. In order to produce ?etiket?, there are some wastes occurred. One of wastes occurred in printing division is product defects. This paper attempts to identify wastes in the division of printing using Lean Manufacturing approach by applying Value Stream Mapping (VSM) method. The results from cause root analysis found that the problems caused the defects in production process. It shows that the most wastes occurs in the printing division are product defect and waiting time. The product defects are caused because there is no standard applied in processing the product and poor inspections by management, while the causes of waiting time wastes is because of lack of carrier and no standard in each process. The recommendation can be suggested to the company are adding some carrier (product?s transporter), creating process standard in each process. 
PENINGKATAN KUALITAS PRODUK KERAMIK DENGAN PENDEKATAN SIX SIGMA PADA INDUSTRI KERAMIK DINOYO – MALANG Garside, Annisa Kesy
Jurnal Ilmiah Teknik Industri Vol. 6, No. 1, Agustus 2007
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v6i1.1636

Abstract

Penelitian ini bertujuan menerapkan konsep Six Sigma untuk mengurangi terjadinya cacat dan menekan adanya variabilitas yang terjadi pada proses pembuatan keramik. Proses perbaikan dilakukan secara sistematis dan kontinyu dengan menggunakan siklus DMAIC (Define, Measure, Analyze, Improve and Control). Dengan menggunakan diagram Pareto diperoleh dua jenis cacat kritis yang menjadi permasalahan utama yaitu retak dan bintik melepuh. Selanjutnya alternatif-alternatif perbaikan pada proses diperoleh dengan FMEA. Berdasarkan nilai Risk Priority Number (RPN) yang tertinggi diambil 3 alternatif perbaikan dan selanjutnya dipilih satu alternatif terbaik dengan menggunakan metode AHP. Implementasi perbaikan dilakukan dengan menggunakan timer dan menugaskan operator khusus pada saat pembakaran untuk mengurangi cacat retak dan membersihkan kotoran bodi dengan menggunakan kompresor untuk mengurangi bintik melepuh. Setelah dilakukan evaluasi hasil implementasi alternatif perbaikan pada proses pembuatan keramik diperoleh kenaikan level sigma dari 2,8 menjadi 3 yang diikuti penurunan DPMO dari 104.167 menjadi 65.625. Sedangkan prosentase biaya akibat kualitas keramik yang jelek (COPQ) terhadap total penjualan mengalami penurunan dari 16,48% menjadi 9,93%.
MINIMASI BIAYA PERAWATAN DENGAN MENGGUNAKAN METODE PREVENTIVE MAINTENANCE POLICY Djunaidi, Much; Bakdiyono, Eko
Jurnal Ilmiah Teknik Industri Vol. 11, No. 2, Desember 2012
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v11i2.926

Abstract

PT. Primatexco Indonesia merupakan perusahaan tekstil dengan produk benang tenun, kain, printing, dan waste. Di PT. Primatexco Indonesia terdapat bagian blowing yang bertugas menyuplai bahan baku untuk proses produksi. Artikel ini membahas mengenai alternatif jadwal perbaikan maupun perawatan dengan biaya terkecil untuk komponen mesin blowing. Dengan menghitung biaya perawatan untuk repair policy dan dibandingkan dengan biaya preventive maintenance policy, maka akan didapatkan jadwal perbaikan maupun perawatan yang optimal. Dari hasil perhitungan, diusulkan jadwal perawatan mengikuti kebijakan repair untuk kerusakan komponen klasifikasi A. Untuk kerusakan komponen klasifikasi B diterapkan kebijakan preventive maintenance setiap 5 bulan. Dan untuk kerusakan komponen klasifikasi C diterapkan kebijakan preventive maintenance setiap 7 bulan.
PENGEMBANGAN ALGORITMA PENJADUALAN PRODUKSI JOB SHOP UNTUK MEMINIMUMKAN TOTAL BIAYA EARLINESS DAN TARDINESS Dewi, Dian Retno Sari
Jurnal Ilmiah Teknik Industri Vol. 4, No. 2, Desember 2005
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v4i2.1311

Abstract

This paper develops job shop production scheduling using Non Delay algorithm through forward and backward-forward algorithm to minimize total earliness and tardiness costs. Backward approach has some disadvantages, such as, if the job is scheduled in backward, there is a possibility that the infeasible situation occurs, in which the job is scheduled at t<0. This paper used hypothetic data generated randomly. This job shop scheduling algorithm development was validated using LINDO software to check the effectiveness heuristic method, compared with the optimation method. The validation proves that the result of backward-forward scheduling method is better than the result of forward scheduling method.
Analisis Kebutuhan Teknis Stakeholder Pada Produk Kursi Roda Manual Menggunakan Zachman Framework Ayundyahrini, Meilinda; Suprapto, S.; Fahma, Fakhrina; Soetopo, Wahyudi; Pujiyanto, Eko
Jurnal Ilmiah Teknik Industri Vol. 18, No. 1, Juni 2019
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v18i1.7771

Abstract

Most wheelchairs circulating in Indonesian market are imported from China at affordable prices, but do not fufill the ISO 7176 series standards. SNI 09-4663-1998 about wheelchair is one of medical devices standard. The standard is considered do not covers the quality and user safety, while wheelchair technology is transform rapidly. Mapping and analyzing gap between stakeholder need and SNI 09-4663-1998 is expected to be input of standard review to improve the competitiveness of products. This research using the Zachman Framework approach following FACTS steps. Data collection uses the observation, in-depth interviews and Focus Group Discussion. Data analysis using Inter Rater Reliability (IRR) which to measure the level of agreement of respondents. The results showed that stakeholder technical needs included 7 parameters: stability, maneuverability, mobility, dimensions, strength, durability, and product information. SNI 09-4663-1998 only includes the product strength parameters through a drop test so that the standard needs to be reviewed.
PENENTUAN WAKTU PERAWATAN UNTUK PENCEGAHANPADA KOMPONEN KRITIS CYCLONE FEED PUMP BERDASARKAN KRITERIA MINIMASI DOWN TIME Nandiroh, Siti; Pratiwi, Indah; Widodo, Hesthi
Jurnal Ilmiah Teknik Industri Vol. 5, No. 1, Agustus 2006
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v5i1.1593

Abstract

Sistem perawatan mesin yang dilakukan di PT. Newmont Nusa Tenggara, selama ini masih bersifat korektif yaitu perawatan setelah terjadi kerusakan. Kerusakan komponen ini biasanya akan ditandai dengan ditemukannya produk yang dihasilkan tidak sedikit mengalami kecacatan. Peranan perawatan terhadap komponen-komponen Cyclone Feed Pump pada Process Departement - PT.Newmont Nusa Tenggara sangat penting artinya untuk mencegah terjadinya kecacatan produk masal dan mencegah terjadinya down time produksi. Dan perawatan yang paling baik digunakan adalah perawatan pencegahan sebelum terjadinya kerusakan (preventive maintenance). Mesin kritis adalah mesin yang mengalami frekwensi kerusakan terbesar dengan total downtime terbesar. Untuk penentuan mesin kritis ini, langkah pertama yang dilakukan adalah dengan mengukur lamanya waktu downtime produksi dari tiap-tiap mesin yang ada. Perhitungan MTTR berdasarkan data downtime, yang sebelumnya juga dilakukan uji kecocokan distribusi dan hasilnya sesuai, Dengan melakukan perhitungan Mean Time To Repair dan Mean Time To Failure dapat diketahui rata-rata waktu berapa lama pompa beroperasi dan berapa lama pompa tersebut dapat dilakukan perbaikan serta dapat diketahui Reliability pada Cyclone Feed Pump 2.0.1. Setelah dilakukkan perhitungan, komponen kritis Discharge Pipe pada Cyclone Feed Pump 2.0.1 harus sudah dilakukan inspeksi preventif, karena telah beroperasi 664.8 jam, dan perbaikan yang harus lakukan maksimal 3.4997 jam setiap kali dilakukan shutdown.
MODEL PERAMALAN KONSUMSI BAHAN BAKAR JENIS PREMIUM DI INDONESIA DENGAN REGRESI LINIER BERGANDA Farizal, Farizal; Rachman, Amar; Rasyid, Hadi Al
Jurnal Ilmiah Teknik Industri Vol. 13, No.2, Desember 2014
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v13i2.635

Abstract

Energy consumption forecasting, especially premium, is an integral part of energy management. Premium is a type of energy that receives government subsidy. Unfortunately, premium forecastings being performed have considerable high error resulting difficulties on reaching planned subsidy target and exploding the amount. In this study forecasting was conducted using multilinear regression (MLR) method with ten candidate predictor variables. The result shows that only four variables which are inflation, selling price disparity between pertamanx and premium, economic growth rate, and the number of car, dictate premium consumption. Analsys on the MLR model indicates that the model has a considerable low error with the mean absolute percentage error (MAPE) of 5.18%. The model has been used to predict 2013 primium consumption with 1.05% of error. The model predicted that 2013 premium consumption was 29.56 million kiloliter, while the reality was 29.26 million kiloliter.   
PERANCANGAN TATA LETAK FASILITAS DI INDUSTRI TAHU MENGGUNAKAN BLOCPLAN Pratiwi, Indah; Muslimah, Etika; Aqil, Abdul Wahab
Jurnal Ilmiah Teknik Industri Vol. 11, No. 2, Desember 2012
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v11i2.772

Abstract

Tata letak pabrik (plant layout) sebagai tata cara pengaturan fasilitas pabrik untuk mendukung kelancaran proses produksi. Dalam penelitian ini, obyek yang diamati yaitu pabrik pembuatan tahu di Sukoharjo.  Jarak tempuh material handling yang terlalu jauh menyebabkan aktivitas dan produktivitas menurun dan mempengaruhi biaya pemindahan bahan, maka dilakukan re-layout pada objek yang diteliti. Perhitungan jarak material handling yang digunakan yaitu jarak Rectilinear, jarak SquareEuclidean dan jarak Euclidean. Terdapat sepuluh alternatif usulan tata letak hasil olahan BLOCPLAN, dipilih alternatif usulan ke-empat karena memiliki skor kedekatan tertinggi.  Hasil perhitungan terjadi penurunan jarak untuk model Rectilinear adalah 1.385 m/hari, model  Square Euclidean adalah 198.09 m/hari dan model Euclidean adalah 1.38935 m/hari. sehingga diperoleh penambahan penghasilan untuk masing-masing model jarak, yaitu model Rectilinear sebesar Rp 80.000,- model Square Euclidean sebesar Rp. 200.000,-dan model Euclidean sebesar Rp. 120.000,-.

Filter by Year

2003 2023


Filter By Issues
All Issue Vol. 22, No. 2, December 2023 Vol. 22, No. 1, June 2023 Vol. 21, No. 2, December 2022 Vol. 21, No. 1, June 2022 Vol. 20, No. 2, December 2021 Vol. 20, No. 1, June 2021 Vol. 19, No. 02, December 2020 Vol. 19, No. 1, June 2020 Vol. 18, No. 2, Desember 2019 Vol. 18, No. 1, Juni 2019 Vol. 18, No. 1, Juni 2019 Vol. 17, No. 2, Desember 2018 Vol. 17, No. 2, Desember 2018 Vol. 17, No. 1, Juni 2018 Vol. 17, No. 1, Juni 2018 Vol. 16, No. 2, Desember 2017 Vol. 16, No. 2, Desember 2017 Vol. 16, No. 1, Juni 2017 Vol. 16, No. 1, Juni 2017 Vol. 15, No. 2, Desember 2016 Vol. 15, No. 2, Desember 2016 Vol. 15, No. 1, Juni 2016 Vol. 15, No. 1, Juni 2016 Vol. 14, No. 2, Desember 2015 Vol. 14, No. 2, Desember 2015 Vol. 14, No. 1, Juni 2015 Vol. 14, No. 1, Juni 2015 Vol. 13, No.2, Desember 2014 Vol. 13, No.2, Desember 2014 Vol. 13, No. 1, Juni 2014 Vol. 13, No. 1, Juni 2014 Vol. 12, No. 2, Desember 2013 Vol. 12, No. 2, Desember 2013 Vol. 12, No. 1, Juni 2013 Vol. 12, No. 1, Juni 2013 Vol. 11, No. 2, Desember 2012 Vol. 11, No. 2, Desember 2012 Vol. 11, No. 1, Juni 2012 Vol. 11, No. 1, Juni 2012 Vol. 10, No. 2, Desember 2011 Vol. 10, No. 2, Desember 2011 Vol. 10, No. 1, Juni 2011 Vol. 10, No. 1, Juni 2011 Vol. 6, No. 2, Desember 2007 Vol. 6, No. 2, Desember 2007 Vol. 6, No. 1, Agustus 2007 Vol. 6, No. 1, Agustus 2007 Vol. 5, No. 3, April 2007 Vol. 5, No. 3, April 2007 Vol. 5, No. 2, Desember 2006 Vol. 5, No. 2, Desember 2006 Vol. 5, No. 1, Agustus 2006 Vol. 5, No. 1, Agustus 2006 Vol. 4, No. 3, April 2006 Vol. 4, No. 3, April 2006 Vol. 4, No. 2, Desember 2005 Vol. 4, No. 2, Desember 2005 Vol. 4, No.1, Agustus 2005 Vol. 4, No.1, Agustus 2005 Vol. 3, No. 2, Desember 2004 Vol. 3, No. 2, Desember 2004 Vol. 3, No. 1, Agustus 2004 Vol. 3, No. 1, Agustus 2004 Vol. 2, No. 3, April 2004 Vol. 2, No. 3, April 2004 Vol. 2, No. 2, Desember 2003 Vol. 2, No. 2, Desember 2003 Vol. 1, No. 3, April 2003 Vol. 1, No. 3, April 2003 More Issue