Journal of Civil Engineering
ISSN : 20861206     EISSN : 25799029     DOI : -
Core Subject :
Journal of Civil Engineering merupakan jurnal bidang teknik sipil yang mengacu pada sistem standar internasional dalam pengelolaannya dengan tujuan utama memajukan bidang teknik sipil melalui publikasi ilmiah demi terwujudnya kemudahan mendapatkan ilmu dan informasi serta mendukung kemajuan teknologi.
Arjuna Subject : -
Articles 5 Documents
Search results for , issue "Vol 32, No 2 (2017)" : 5 Documents clear
ANALISIS DAMPAK DELAY YANG TERJADI PADA RUNWAY, APRON DAN RUANG UDARA TERHADAP OPERASIONAL PESAWAT (STUDI KASUS: BANDARA INTERNASIONAL JUANDA) Laila Fatchiyah; Ervina Ahyudanari
Journal of Civil Engineering Vol 32, No 2 (2017)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (605.257 KB) | DOI: 10.12962/j20861206.v32i2.4549

Abstract

The Air transport demand still increasing continuously both of number passengers, cargo and aircraft movements will have a direct impact on the capacity of the airport. Juanda International Airport has one runway that serves about 35-40 aircraft per hour. The number of aircraft movements cause the problem of delay and wasting fuel. Delay can reduced the productivity airport services and airlines. This goal of this paper is to analyze the airport capacity, delay and effect of delay on the aircraft's fuel consumption. Calculations using simulation software arena with arrivals and departure modelling. The results showed that in the calculation of the existing runway capacity as much as 44 scheduled aircraft movements during peak hours there are only 33 aircraft for 1 hour with an average delay of 29 minutes. Simulations using the software arena, delay for arrival varied between 0.6 minutes to 4.2 minutes and delay for departure varied between 0.8 minutes to 19 minutes. Aircraft fuel consumption A320 for the queue 1 to 4 of aircraft varied between 67.56 lb to 270.26 lb. While fuel consumption B737-500 for the queue 1 to 4 of aircraft varied between 131.31 lb to 525.26 lb
ANALISA PERUBAHAN KINERJA DI JALAN GAJAH MADA MEDAN AKIBAT ADANYA JALAN LAYANG Yaumil Fauzi; Hera Widyastuti
Journal of Civil Engineering Vol 32, No 2 (2017)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (236.493 KB) | DOI: 10.12962/j20861206.v32i2.4550

Abstract

The increase of vehicles is one of the impacts of activity growth in a region. The high number of vehicles has an impact on the high saturation rate and the decreasing level of effectiveness and performance through Gajah Mada Medan Street. One of the solutions offered for performance improvement in Gajah Mada Street is the construction of flyover. Therefore, it is necessary to analyze the performance alteration due to the constructed of flyover.The analysis process development in Gajah Mada Street is conducted on the number of vehicles, speed, capacity, and delay analysis at the intersection. From the analysis result obtained the volume roads, degree of saturation, travel time and forecasting from Gajah Mada Street.
ANALYSIS OF RELATIONSHIP AMONG THE FACTORS OF NON-EXCUSABLE AFFECTING DELAY IN CONSTRUCTION PROJECT Satrio Rekso Wilogo; I Putu Artama Wiguna
Journal of Civil Engineering Vol 32, No 2 (2017)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (372.973 KB) | DOI: 10.12962/j20861206.v32i2.4558

Abstract

The contribution of the Surabaya construction sector to the growth of the Surabaya economy over the past few decades is highly phenomenal, but many of construction projects in Surabaya are experiencing delays. While much research has been done about the cause of the delay, but the chronic problem of delay time is still very difficult to clearly discovered. The primary objectives of this research are to identify the main factors of non-excusable delay in construction projects and analyze the interdependence relationships of one factor with another. Based on literature, structural model has been developed and then use Partial Least Square to analyze the relationships with quantitative impact value among identified factors. In order to collect the data on the measured attributes, a questionnaire survey was designed in the form of an affirmative question. Respondents for this study are selected from a project manager, head project and director in the Surabaya construction firms were worked on building projects and experienced of dealling delays problem. The results of the research suggest that poor field management is one of the most significant factors significant affecting construction project delay. While path coefficient of poor capability of contractors and improper planning indicated possitive, neither of these two factors has any impact on time delay. On the other hand, poor capability of contractor to be one of the key contributing factors resulting in improper planning and improper planning affecting in poor field management.
PENILAIAN KEBERLANJUTAN PENGELOLAAN SISTEM PENYEDIAAN AIR MINUM BERBASIS MASYARAKAT DI KOTA BLITAR Puji Kamulyan; I Putu Artama Wiguna; Agus Slamet
Journal of Civil Engineering Vol 32, No 2 (2017)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (441.465 KB) | DOI: 10.12962/j20861206.v32i2.4559

Abstract

The paper disccuses an assess the sustainability level, to identify important and priority factors of Community Based Water Supply System (CBWSS) management. Public and stakeholders perception are the main data needed for the analysis, and these data are collected through observation and structured interviews. The consideration aspects to measure the sustainability level consist of technical,institutional, financial, social and environmental aspects.This study used several analysis methods, i.e. Index Formulation (measuring sustainability level), Relative Importance Index and Confidence Interval (identifying important factors) and Development Priority Index (determining priority factors).The results indicate that CBWSS management is generally quite sustainable, with the highest sustainability value on environmental aspect, while the lowest one is on social aspect. The most important factor in the CBWSS management is the existence of community retribution and the development priority factor lead to the management transparency.
EFFECT OF REDUCED BEAM SECTION IN STAGGERED TRUSS FRAME STRUCTURE VIERENDEEL ELEMENT WITH EARTHQUAKE LOAD ANALYSIS M. Farid Nurul Iman; Endah Wahyuni; Data Iranata
Journal of Civil Engineering Vol 32, No 2 (2017)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (678.524 KB) | DOI: 10.12962/j20861206.v32i2.4560

Abstract

The purpose of this study is to describe the effect of Reduced Beam Section in vierendeel panel element in STF system’s inelastic behavior based on earthquake load analysis. STF system is applied to 4, 6, and 10 storey building that served as office building. The structure’s system used Special Moment Resisting Frame (SMRF) system in longitudinal direction (W-E) and STF system in transversal direction (N-S). The analysis method that used in this study is nonlinear pushover analysis. Application of RBS in vierendeel panel element showed that by the increasing of storey number, the ductility of the structure was increased in both directions, while N-S direction has bigger ductility than W-E direction. Dissipation energy of the structure was also increased, especially in N-S direction. The first yielding process occurred in vierendeel panel element, and then followed by truss and diagonal chord around vierendeel panel element, while the critical condition showed still at life safety level.

Page 1 of 1 | Total Record : 5