cover
Contact Name
Sulha
Contact Email
ojs_mk@uho.ac.id
Phone
+628114097029
Journal Mail Official
ojs_mk@uho.ac.id
Editorial Address
Kampus Hijau Bumi Tridharma, Jl. H.E.A. Mokodompit, Anduonohu, KENDARI 93232
Location
Kota kendari,
Sulawesi tenggara
INDONESIA
Media Konstruksi : Jurnal Ilmiah Teknik Sipil
Published by Universitas Halu Oleo
ISSN : -     EISSN : 25032712     DOI : http://dx.doi.org/10.33772/jmk.v7i2
Adapun bidang-bidang yang tercakup di dalam ruang lingkup Jurnal Media Konstruksi, namun tidak terbatas pada, antara lain: - Teknologi Informasi dan Komunikasi - Pemukiman dan Bencana - Bangunan Berorientasi Lingkungan - Transportasi - Teknologi Proses - Kelautan - Geoteknik - Struktur - Manajemen Konstruksi - Keairan
Articles 7 Documents
Search results for , issue "Vol 8, No 2 (2023)" : 7 Documents clear
Analisis Penyediaan Air Bersih (Studi kasus: Desa Poni-poniki, Kec. Tirawuta, Kab. Kolaka Timur) Ramjan Ramjan; Romi Talanipa; Rini Sriyani; Muh. Handy Dwi Adityawan
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 8, No 2 (2023)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v8i2.28766

Abstract

AbstractAlong with the growth of the community, the water demand in Poni-Poniki Village is increasing, but it is not balanced with the development of existing clean water management facilities. The purpose of this study was to determine the availability of clean water in the village of poni-poniki, by measuring the discharge of the springs in the mountains of Poni-poniki. Then analyze the need for clean water based on survey data and the results of population projection analysis. Based on the real demand survey (RDS), the water needs of the people of Poni-poniki Village in 2019 = 0.840 liters/second, and in 2023 = 0.993 liters/second. Mountain spring discharge based on field measurements using the Volumetric method is 0.00347 m³/second or 3.467 liters/second. Thus, the availability of water until 2023 can still be met safely, but the water sources used will not meet the needs in the next few years.AbstrakSeiring dengan pertumbuhan masyarakat maka kebutuhan air di Desa Poni-Poniki semakin meningkat namun tidak diimbangi dengan pengembangan sarana pengelolahan air bersih yang ada. Tujuan dari penelitian ini untuk mengetahui ketersediaan air bersih desa poni-poniki, dengan melakukan pengukuran debit mata air pegunungan Poni-poniki. Kemudian menganalisis kebutuhan air bersih berdasarkan data hasil survey dan hasil analisis proyeksi penduduk. Berdasarkan real demand survey (RDS), kebutuhan air masyarakat Desa Poni-poniki pada tahun 2019 = 0,840 ltr/dtk, dan tahun 2023 = 0,993 ltr/detik. Debit Mata Air pegunungan berdasarkan pengukuran dilapangan menggunakan metode Volumetrik adalah 0.00347 m³/detik atau 3.467 liter/detik. Dengan demikian ketersediaan air sampai tahun 2023 masih dapat terpenuhi dengan aman, tetapi sumber air yang digunakan tidak memenuhi kebutuhan dalam beberapa tahun mendatang.
Tinjauan Kebutuhan Alat Berat Pada Proyek Peningkatan Jalan Ambaipua - Motaha La Ode Resaldi; Nasrul Nasrul; Firiah Fitriah
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 8, No 2 (2023)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v8i2.32506

Abstract

AbstrakAlat berat yang diteliti dalam Tugas Akhir ini adalah Wheel Loader, Dump Truck, Motor Grader, Vibrator Roller dan Water Tank Truck.Metode perhitungan yang digunakan adalah analisis data, perhitungan volume, perhitungan produktivitas mesin, jumlah mesin, waktu yang dibutuhkan dan analisis biaya mesin.Hasil penelitian lapis pondasi agregat kelas A dengan volume 1.022,25 m3, produktivitas untuk 1 unit wheel loader dapat mencapai 31,74 m3 / jam selama 4,6 hari, dengan harga sewa Rp. 23.464.393 per/hari, 5 unit dump truck dapat 3,87 m3 / jam selama 7,54 hari dengan harga sewa Rp. 296.106.862,66 per/hari, 1 unit motor grader dapat 25,94 m3 / jam selama 5,62 hari dengan harga sewa Rp. 34.998.305,67 per/hari, 1 unit Vibrator Roller bisa 37,35 m3/jam selama 3,90 hari dengan harga sewa Rp. 15.840.537,12 per/hari, Dan didapatkan 1 unit water tangker sebesar 71,14 m3 / jam selama 2 hari dengan harga sewa Rp. 7.823.036,3. AbstrakAlat berat yang di teliti pada Tugas Akhir ini yaitu Wheel Loader, Dump Truck, Motor Grader, Vibrator Roller dan Water Tank Truck .Metode perhitungan yang digunakan yaitu analisa data, perhitungan volume, perhitungan produktivitas alat berat, jumlah alat berat, waktu yang dibutuhkan dan analisa biaya alat berat.Hasil penelitian Lapis gitar agregat kelas A dengan volume 1.022,25 m3 maka produktivitas Untuk 1 unit wheel loader di dapat sebesar 31,74 m 3 /jam selama 4,6 hari, dengan harga sewa Rp. 23.464.393 per/hari, 5 unit dump truck di dapat sebesar 3,87 m 3 /jam selama 7,54 hari dengan harga sewa Rp. 296.106.862,66 per/hari, 1 unit motor grader dapat sebesar 25,94 m 3 /jam selama 5,62 hari dengan harga sewa Rp. 34.998.305,67 per/hari, 1 unit Vibrator Roller dapat sebesar 37,35 m 3 /jam selama 3,90 hari dengan harga sewa Rp. 15.840.537,12 per/hari, Dan 1 unit water tangker yang di dapatkan sebesar 71,14 m3 /jam selama 2 hari dengan harga sewa Rp. 7.823.036,3.                                                                                        
Metode Pelaksanaan Pekerjaan Bore Pile Jembatan Teluk Kendari Tryagum Tryagum; Sulha Sulha; Wayan Mustika
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 8, No 2 (2023)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v8i2.28767

Abstract

AbstractThe government continues to promote infrastructure development outside Java as an effort to equalize development, including Kendari City. This study aims to determine the implementation method, requirements and standards of bore pile work in the Kendari Bay Bridge project. The results of the research on the method of carrying out bore pile work on the Kendari Bay Bridge project include a series of preparations for casing bore pile erection, mobilization of bore pile steel casing, erection of bore pile steel casing, connection of bore pile steel casing, setting of RCD tools then drill bore pile points to the desired depth. specified on the plans, rebar installation, bore pile casting. Material requirements and standards used in bore piles for concrete use high-strength SCC (Self Compacting Concrete) concrete with a quality of fc 30 Mpa, by adding Retarder RD, Super Plastic SP and Fly Ash.AbstrakPengembangan infrastruktur di luar pulau Jawa terus digenjot pemerintah sebagai upaya pemerataan pembangunan, termasuk Kota Kendari. Penelitian ini bertujuan untuk mengetahui metode pelaksanaan, syarat dan standar pekerjaan bore pile di proyek Jembatan teluk Kendari. Hasil penelitian metode pelaksanaan pekerjaan bore pile pada proyek Jembatan Teluk Kendari antara lain rangkaian persiapan pemancangan casing bore pile, mobilisasi casing baja bore pile, pemancangan casing baja bore pile, penyambungan casing baja bore pile, setting alat RCD kemudian bor titik bore pile sampai kedalaman yang telah ditentukan pada gambar rencana, instalasi rebar, pengecoran bore pile. Syarat dan standar material yang dipakai pada bore pile untuk beton menggunakan beton mutu tinggi SCC (Self Compacting Concrete)  dengan mutu fc 30 Mpa, dengan menambahkan Retarder RD, Super Plasitis SP dan Fly Ash.
Analisis Perbandingan Penggunaan Quarry Abeli Dan Quarry Simbo Berdasarkan Waktu Dan Biaya (Studi Kasus : Proyek Pembuatan Jalan Inspeksi Bandar Udara Haluoelo) Abdul Rajab; Sulha Sulha; Fitriah Fitriah
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 8, No 2 (2023)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v8i2.32659

Abstract

Optimization of construction projects is very important because many projects have had their work schedule stopped due to funding problems and soaring material prices. One type of project that is of concern in terms of cost optimization is a road pavement project. This huge cost is inseparable from the procurement of the materials needed for road construction, what's more, quarry materials are not available around the project site and to bring in these materials is increasingly expensive. The purpose of this study is to analyze how to compare costs and compare the duration of time required between the use of the Abeli Quarry and the Simbo Quarry. Based on the calculation results, the time needed to replace subgrade using simbo quarry is done by 1 person the foreman, 10 units of dump trucks and 1 unit of excavator is 14 days while for abeli quarry with the same number of workers and equipment it can be done in 28 days. Based on the results of the calculation of the budget plan, the cost required for subgrade replacement work using quarry simbo is Rp. 538,102,160.00 while for the abeli quarry it is Rp. 1,048,254,320.00 with a difference of Rp. 510,152,160.00. The duration of time needed for subgrade replacement work using abeli quarry is 28 days while for simbo quarry is 14 days. Where the difference in time is 14 days with a comparison percentage of 50%.Optimalisasi pada proyek konstruksi menjadi sangat penting karena banyak proyek yang jadwal pekerjaannya dihentikan karena masalah dana dan harga material yang melonjak. Salah satu jenis proyek yang menjadi perhatian dalam hal pengoptimalisasian biaya adalah proyek perkerasan jalan (pavement). Biaya yang besar ini tidak terlepas dari pengadaan material yang dibutuhkan untuk pembangunan jalan apa lagi quarry material tidak tersedia disekitar lokasi proyek dan untuk mendatangkan material-material itu semakin mahal. Adapun tujuan penelitian ini, yaitu Untuk menganalisa Bagaimana perbandingan biaya dan perbandingan durasi waktu yang dibutuhkan antara quarry abeli dan quarry simbo. Berdasarkan hasil perhitungan, waktu yang dibutuhkan Pada penggantian tanah dasar dengan mengunakan quarry simbo yang dikerjakan oleh 1 orang mandor, 10 unit dump truck dan 1 unit excavator adalah 14 hari sedangkan untuk quarry abeli dengan jumlah pekerja dan peralatan yang sama dapat dikerjakan dalam waktu 28 hari. Berdasarkan hasil perhitungan rencana anggaran biaya, biaya yang dibutuhkan perkerjaan penggantian tanah dasar dengan menggunakan quarry simbo adalah Rp. 538.102.160,00 sedangkan untuk quarry abeli adalah Rp.1.048.254.320,00 dengan selisih sebesar Rp.510.152.160,00. Durasi waktu yang dibutuhkan untuk pekerjaan penggantian tanah dasar menggunakan quarry abeli yakni 28 hari sedangkan untuk quarry simbo yakni 14 hari. Dimana selisih waktunya yakni 14 hari dengan persentase perbandingan 50%.
Tinjauan Mutu Agregat Lapis Pondasi Kelas A Pada Pekerjaan Peningkatan Kapasitas Struktur Jalan Asphalt Hot Mix Ac-Bc (Studi Kasus Quarry Desa Amesiu Kecamatan Pondidaha Kabupaten Konawe) Ikhsar Ikhsar; Umran Sarita; Wayan Mustika; Anafi Minmahddun
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 8, No 2 (2023)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v8i2.29279

Abstract

Road is a transportation infrastructure that functions to support human activities and needs in terms of mobility to achieve economic and non-economic goals. The purpose of this research was  to find out class A aggregate material quality usedwith refers to the general specifications of Bina Marga in 2018. Theresearch carried out by surveying the locations stock pile, this method was needed to obtain primary and secondary data. The results of testing the characteristics of the aggregate, the results obtained  Sieve analysis tests have met the specifications for class A aggregate, specific gravity of coarse aggregate is 3.20, specific gravity of fine aggregate is 2.81, density of loose coarse aggregate is 1.58 and dense is 1.82, density of loose fine aggregate is 1.81 and dense 1.90, aggregate wear 24.22%, maximum dry density 2.689 gram/ cm3, optimum moisture content 3.80%, CBR 100% γd maximum 142%, CBR 95% γd maximum 108%.conclusionIn Class A aggregate material used Fulfill General Specifications for Highways 2018 (Division 5). Jalan merupakan suatu prasarana transportasi yang berfungsi mendukung aktivitas dan kebutuhan manusia dalam hal  mobilitas untuk mencapai tujuan ekonomi dan non ekonomi. Tujuan  penelitian ini untuk mengetahui mutu material agregat kelas A yang digunakan dengan mengacu pada spesifikasi umum Bina Marga tahun 2018. Metode penelitian dilakukan  dengan melakukan survey pada lokasi stock pile, metode ini  dibutuhkan untuk mendapatkan data primer dan  sekunder. Hasil pengujian karakteristik agregat , diperoleh  hasil  pengujian analisa saringan telah memenuhi spesifikasi agregat kelas A,  berat jenis agregat kasar 3,20  , berat jenis agregat halus 2,81 , berat isi agregat kasar lepas 1,58 dan padat 1,82, berat isi agregat halus lepas 1,81 dan padat 1,90, keausan agregat 24,22%, kepadatan kering maksimum 2,689 gram/ cm3, kadar air optimum 3,80%, nilai CBR 100% γd maksimum 142%, CBR 95% γd maksimum 108%. Kesimpulannya material agregat kelas a yang digunakan memenuhi Spesifikasi Umum Bina Marga 2018 (Divisi 5).
Pengujian Kelayaksan Material Gunung Bente Desa Madampi Kecamatan Lawa Kabupaten Muna Barat Sebagai Lapis Pondasi Kelas A Muhamad Nasrul; Muhamad Handy Dwi Adityawan; Wayan Mustika
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 8, No 2 (2023)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v8i2.29913

Abstract

"This research aims to determine the feasibility of Mount Bente Material in Madampi Village as a Class Foundation Layer. From the results of research in the laboratory that based on existing tests, the characteristics of the material for Mount Bente in Madampi Village are not suitable for use as a class A road pavement layer because they do not meet the General Highways 2018 specifications (Devision 5). In testing the aggregate sieving analysis of Mount Bente in Madampi Village does not meet General Specifications for Bina Marga 2018 Revision 2 (Division 5) on sieve numbers 1”, 40, and 200 For Class A foundation layer, For laboratory CBR testing of class A aggregates, Mount Bente material, Madampi Village, Lawa District, Muna Barat Regency, 66% also do not meet the Standards specifications implied is 90%.”“Penelitian ini bertujuan untuk mengetahui kelayakan Material Gunung Bente Desa Madampi Sebagai Lapis Pondasi Kelas. Dari hasil penelitian dilaboratorium bahwa berdasarkan pengujian yang ada, karakteristik dari material Gunung Bente Desa Madampi tidak layak digunakan sebagai lapis perkerasan jalan kelas A karena tidak memenuhi spesifikasi Umum Bina Marga 2018 (Devisi 5).Pada pengujian analisa saringan agregat Gunung Bente Desa Madampi tidak memenuhi Spesifikasi Umum Bina Marga 2018 Revisi 2 (Divisi 5) pada saringan nomor 1”, 40, dan 200 Untuk lapis Pondasi Kelas A, Untuk pengujian CBR laboratorium agregat kelas A material Gunung Bente Desa Madampi Kecamtan Lawa Kabupaten Muna Barat 66 % juga tidak memenuhi Standar spesisifikasi yang diisyaratkan yaitu 90%.”
Analisa Faktor Kerusakan Jalan Pada Perkerasan Ruas Jalan Poros Walengkabola Kabupaten Muna Abdul Rajab; Siti Nurjanah Ahmad; Anafi Minmahddun
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 8, No 2 (2023)
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v8i2.29945

Abstract

The increase in traffic volume on the Walengkabola road section resulted in a lot of damage at several points such as cracks, damage to the pavement surface, and potholes. This study aims to analyze the level of road damage at one point along 1 km and provide recommendations for handling that can be used. Analysis of the level of road damage using the Surface Distress Index (SDI) method. The results of the analysis obtained good road conditions 60%, moderate 30% and 10% slightly damaged. The recommended treatment for this section is sealing the cracks, filling the cracks and patching the entire hole.Peningkatan volume lalu lintas pada ruas jalan Walengkabola mengakibatkan banyak kerusakan di beberapa titik seperti retak, rusaknya permukaan perkerasan jalan, dan berlubang. Penelitian ini bertujuan untuk menganalisis tingkat kerusakan jalan pada satu titik sepanjang 1 km dan memberikan rekomendasi penanganan yang dapat digunakan. Analisis tingkat kerusakan jalan menggunakan metode Surface Distress Index (SDI). Hasil analisis diperoleh kondisi jalan baik 60%, sedang 30% dan rusak ringan 10%. Perawatan yang disarankan untuk bagian ini adalah menyegel retakan, mengisi retakan dan menambal seluruh lubang.

Page 1 of 1 | Total Record : 7