PENGUJIAN HARMONISA PADA LAMPU HEMAT ENERGI (LHE) MENURUT STANDAR IEC 61000-3-2 KELAS C, IEEE 512-1992 DAN POWER FACTOR PLN (STUDI KASUS UNTUK LHE 5 WATT) Widhiatmaka, Widhiatmaka; Aman, Mohamad
Ketenagalistrikan dan Energi Terbarukan Vol 11, No 2 (2012): KETENAGALISTRIKAN DAN ENERGI TERBARUKAN
Publisher : P3TKEBTKE

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Telah diuji tingkat harmonisa yang ditimbulkan oleh 6 sampel lampu hemat energi (LHE) 5 watt yang beredar di pasaran. Data individual harmonic distortion (IHD) diukur sampai orde ke-39 untuk setiap LHE, sesuai standar International Electrotechnical Commission (IEC) 61000. Hasil pengujian menunjukkan bahwa ITHD berkisar 69,3-81,72%, power factor (PF) 0,54-0,62, dan IHD tertinggi pada orde ke-3 dan diikuti orde ke-5. Menurut standar Institute of Electrical and Electronics Engineers (IEEE) 519-1992 ITHD < 20%, standar Perusahaan Listrik Negara (PLN) PF ≥ 0,85 dan standard IEC 61000, dapat disimpulkan bahwa 6 sampel LHE tersebut tidak ada yang memenuhi standar performance yang disyaratkan. The level of harmonics generated by the six samples of common market energy-saving lamps (ESL) of 5 watts has been measured up to the 39th order for each ESL, according to IEC 61000. From thetest results of the six samples show ITHD ranged from 69.3 to 81.72%, and power factor (PF) 0.54 - 0.62, with the highest harmonics on the order of the 3rd and 5th. According to the IEEE Standard 519-1992 ITHD has to be less than 20%, PLN standard i.e. PF has to be greater than or equal to 0.85, and the IEC61000. It can be concluded that  the six samples of ESL have not met the required performance standards.
ANALISIS KEEKONOMIAN PENERAPAN PEMBANGKIT LISTRIK TENAGA SURYA PADA SISTEM KETENAGALISTRIKAN NIAS; THE ECONOMIC ANALYSIS OF SOLAR SYSTEM POWER PLANT IMPLEMENTATION IN NIAS ELECTRICAL SYSTEM Nafis, Subhan; Aman, Mohamad; Hadiyono, Adjar
Ketenagalistrikan dan Energi Terbarukan Vol 14, No 2 (2015): KETENAGALISTRIKAN DAN ENERGI TERBARUKAN
Publisher : P3TKEBTKE

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Biaya pokok produksi (BPP) pada sistem ketenagalistrikan area Nias cukup tinggi dikarenakan sebagian besar pembangkitnya mengunakan PLTD. Salah satu solusi untuk menekan BPP sekaligus mengurangi emisi karbon dari sektor pembangkit listrik adalah dengan menggantikan jam operasi PembangkitListrik Tenaga Diesel (PLTD) dengan Pembangkit Listrik Tenaga Surya (PLTS). Tulisan ini bertujuan untuk menganalisis keekonomi penggantian jam operasional PLTD dengan PLTS berdasarkan analisis terhadap sistem Gunung Sitoli, Teluk Dalam, dan Pulau Tello. Kapasitas PLTS dibatasi 20% dari bebanpuncak siang hari sistem-sistem di area Nias guna menjaga stabilitas sistem. Berdasarkan potensi energi matahari, biaya pengembangan sistem PLTS dan konsumsi bahan bakar PLTD, biaya energi PLTS lebih rendah dari biaya bahan bakar untuk PLTD. Jika PLTS sebagian dapat mengantikan operasi PLTD, maka konsumsi bahan bakar yang dapat dihemat kurang lebih senilai Rp. 1,26 milyar per tahun. Secara ekonomis penerapan PLTS sebagai pengganti jam operasional PLTD layak diterapkan pada sistem ketenagalistrikan Nias. The Cost of Production in Nias system is considerably high as the system mainly operates Diesel Power Plants. A possible solution to decrease the production cost and reduce the carbon emission from the power plant sector is to replace the operating hours of the Diesel power plants with Solar power plant (PV). The purpose of this paper is to analyze the economic value of this replacement based on the analysis of the system in Sitoli Mountain, Dalam Gulf and Tello Island. The total capacity of PV is limited only by 20% of the daytime peak load of the systems in Nias in order to maintain the system’s stability. Based on the solar energy potential, the cost of system development in PV and the fuel consumption in Diesel Power Plants, the cost of energy in PV is lower than the fuel cost in Diesel Power Plants. If the PV can partially replace the Diesel Power Plants operation, the fuel consumption can be saved for about Rp. 1,26 billion per year. Economically, the utilization of solar power as the  replacement for Diesel Power Plants operating hours is  reasonable in Nias electrical power system.
ANALISIS KINERJA PLTU INDRAMAYU SEPANJANG TAHUN 2015; PERFORMANCE ANALYSIS OF INDRAMAYU'S COAL-FIRED POWER PLANTS IN YEAR 2015 Widhiatmaka, Widhiatmaka; Gunawan, Yohanes; Simorangkir, Charles Lambok F.; Aman, Mohamad
Ketenagalistrikan dan Energi Terbarukan Vol 16, No 2 (2017): KETENAGALISTRIKAN DAN ENERGI TERBARUKAN
Publisher : P3TKEBTKE

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Subsidi listrik yang semakin besar telah memberatkan pengeluaran Anggaran Pendapatan Belanja Negara (APBN) untuk biaya energi. Salah satu cara untuk mengurangi subsidi tersebut adalah dengan meningkatkan efisiensi pada pembangkit listrik. Pembangkit Listrik Tenaga Uap (PLTU) adalah pembangkit terbesar di Indonesia yang harus ditingkatkan efisiensinya dengan menurunkan heat rate. Tujuan dari penelitian adalah untuk menganalisis kinerja PLTU Indramayu (Jawa Barat) yang mempunyai kapasitas 3x330 MW sepanjang tahun 2015. Metodologi yang digunakan adalah metode heat loss atau metode tidak langsung dan diasumsikan bahwa nilai heat rate yang rendah akan menghasilkan efisiensi yang maksimum. Hasil menunjukkan bahwa dari ketiga unit yang ada, Unit 3 memiliki nilai heat rate terendah yaitu 2.765 kcal/kWh dengan kalori batubara 4.690 kcal/kg dan efisiensi termal tertinggi yaitu 31,1%. Dengan data tersebut dapat dikatakan bahwa PLTU Indramayu tidak efisien yang disebabkan oleh rugi-rugi boiler akibat hilangnya panas pada preheater air. Dua hal penting yang perlu diperhatikan untuk meningkatkan efisiensi PLTU Indramayu adalah kalori batubara dan kebocoran pada komponen-komponen boiler. Kata kunci: heat rate; efisiensi termal; PLTU;  The increasing of electricity subsidy – in terms of energy – has resulted a heavy burden on government spending. One of the key strategies to reduce those burden is generation efficiency. Coal-fired power plant has currently been the largest generating capacity in Indonesia. This paper examines the generation performance in Indramayu’s coal-fired power plant (West Java) in year 2015 which has a total capacity 3x330 MW. The methodology used is the heat loss or indirect method and we assume that the lowest heat rate parameter could produce a maximum efficiency. The results show that among 3 installed units, there was only one units (3rd unit) that the lowest heat rate (2,765 kcal/kWh), using coal callories (4,690 kcal/kg) and highest thermal efficiency about 31.1%. These implies that Indramayu’s power plants in inefficient due to the boiler losses: heat elimination at the water preheater. Two crucial components that are required to increase the Indramayu’s generation capacity, that are coal callories and leakage on boiler components. Keywords: heat rate; thermal efficiency; coal- fired power plan;