Claim Missing Document
Check
Articles

Found 10 Documents
Search

DIGITAL OPERATION AND MAINTENANCE MANUAL FOR SMALL EXCAVATORS: A CASE STUDY OF KOMATSU PC135F-10M0 AT PT ABC, NORTH SUMATRA Dedi Hamdani; Gembong Baskoro; Andi Idhil Ismail
ILTEK : Jurnal Teknologi Vol. 21 No. 01 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/iltek.v21i01.470

Abstract

Penelitian ini mengkaji penerapan Digital Operation and Maintenance Manual (DOMM) pada excavator Komatsu PC135F-10M0 yang dioperasikan PT ABC di Sumatera Utara. Pengguna alat berat sering mengalami kesulitan perawatan karena tidak tersedianya manual di lapangan, tingginya turnover operator, serta jarak yang jauh dari teknisi dealer. Dengan kerangka DMAIC, dikombinasikan dengan Failure Mode and Effect Analysis (FMEA), diagram Pareto, dan Training Needs Assessment (TNA), penelitian ini mengidentifikasi masalah utama perawatan dan menawarkan solusi berbasis smartphone yang terintegrasi dengan WhatsApp Business. Data diperoleh dari 38 pertanyaan pelanggan, validasi ahli, serta survei operator dengan hasil kelayakan di atas 92% dan penerimaan pengguna 87%. Hasil penelitian menunjukkan DOMM mampu mengurangi downtime, mempercepat troubleshooting, dan meningkatkan kemandirian operator di area terpencil. Kesimpulannya, digitalisasi manual tidak hanya meningkatkan efisiensi operasional dan kepuasan pelanggan, tetapi juga mendukung keandalan jangka panjang serta layanan purna jual strategis.
EXTENDING THE LIFE OF SCANIA P410 ENGINE BY PREVENTING ENGINE OVERHEAT: A CASE STUDY AT PT ABC, TENGGARONG, EAST KALIMANTAN, INDONESIA NT Iwan Prasetyo Nugroho; rer. nat. Filiana Santoso; Gembong Baskoro
ILTEK : Jurnal Teknologi Vol. 21 No. 01 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/iltek.v21i01.500

Abstract

Engine overheating is a critical issue that reduces the performance and lifespan of heavy-duty trucks. At PT ABC, Tenggarong, East Kalimantan, Indonesia, the Scania P410 fleet experienced recurring overheating, leading to reduced reliability, increased downtime, and higher maintenance costs. This study applies the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) framework to identify root causes and propose improvements. Data were obtained from operational records, maintenance logs, and field observations. Root cause analysis using Fishbone Diagram and Failure Mode and Effect Analysis (FMEA) revealed inadequate preventive maintenance, inefficient cooling systems, and poor operating practices as the main contributors. Kaizen-based improvements, including enhanced maintenance scheduling, standardized cooling inspections, and operator training, were implemented. As a result, overheating incidents decreased significantly, maintenance costs were reduced, and engine life was extended. The findings confirm that structured problem-solving methods are effective in improving technical reliability in the heavy equipment sector.
EVALUATING THE IMPACT OF MECHANICAL COMPETENCY DEVELOPMENT ON CERTIFICATION ON WORK PERFORMANCE AT PT. XYZ Rahmat Riyadi; Gembong Baskoro; rer. nat. Filiana Santoso
ILTEK : Jurnal Teknologi Vol. 21 No. 01 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/iltek.v21i01.501

Abstract

This study investigates the impact of mechanical competency development through training and certification on the performance of mechanics at PT XYZ, a nationwide heavy equipment distributor. The main issue lies in the high failure rate of certification exams, particularly in theory, caused by a misalignment between training materials and exam requirements. This mismatch reduces certification success rates, prolongs job completion times (lead time), and increases operational costs. Adopting a quantitative research design, the study utilizes surveys, SAP system data, and multiple regression analysis to examine the relationships among training, certification, work experience, and performance. Findings reveal that certification exerts a stronger influence than training alone, particularly in reducing lead time. Certified mechanics work faster, more accurately, and more efficiently. Moreover, work experience and task repetition significantly enhance performance. Therefore, an effective mechanic development strategy should integrate structured training, certification, and hands-on exposure to improve competency, lower costs, and boost productivity and customer satisfaction.
Enhancing Product Support Performance and Revenue Through Localized Service Point: Case Study at PT XYZ in Tenggarong Rizky Awalul Ramdani; Gembong Baskoro; Dwityapoetra S. Besar
ILTEK : Jurnal Teknologi Vol. 21 No. 01 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/iltek.v21i01.503

Abstract

This study aims to analyze the impact of establishing a localized service point on after-sales performance in the mining sector. A case study was conducted at PT XYZ in Tenggarong, which faced issues with low On-Time In-Full (OTIF) delivery (~83%), far below the corporate target of 90%. As a result, PT XYZ captured only about 50% of PT PKSM’s spare parts sales potential. Using a mixed-method approach (DMAIC, customer satisfaction survey, IRR/NPV analysis), the findings show that developing a local service point can improve OTIF to ~95%, reduce downtime by more than 70%, increase customer satisfaction scores (from 2.8 to 4.3 on a 5-point Likert scale), and raise annual revenue by up to 74% (IDR 24 billion). Financial analysis confirms feasibility, with an IRR of ~75% and positive NPV even under pessimistic scenarios. Thus, a localized support point is proven to be both feasible and strategic for enhancing service performance and strengthening market position.
Optimizing Excavator Physical Availability Using Lean Six Sigma and Predictive Inventory Management: A Case Study of PC1250 at Samarinda Coal Mine Satria Adi Prabowo; Gembong Baskoro; rer. nat. Filiana Santoso
ILTEK : Jurnal Teknologi Vol. 21 No. 01 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/iltek.v21i01.505

Abstract

The coal mining industry faces critical challenges due to the low Physical Availability (PA) of heavy equipment, leading to excessive downtime costs and unmet production targets. This study investigates the optimization of Komatsu PC1250 excavator availability at a Samarinda coal mining site by applying the Lean Six Sigma DMAIC framework combined with Predictive Inventory Management. Baseline data indicated PA at only 73%, below the 85% target, with an average Mean Time To Repair (MTTR) of 34 hours and spare parts On-Time In-Full (OTIF) of 78%. Using analytical tools such as Failure Mode and Effects Analysis (FMEA), Fishbone diagrams, 5-Why analysis, and a predictive inventory system through two-bin Kanban and Vendor Held Stock (VHS), this study successfully reduced MTTR to ≤24 hours, improved Mean Time Between Failures (MTBF) by 18%, and increased OTIF for critical parts to 95%. As a result, PC1250 availability rose significantly to 83%, approaching the corporate target. The findings confirm that integrating Lean Six Sigma with predictive inventory systems provides practical solutions for mining contractors to enhance productivity while reducing operational costs.
PRESCRIPTIVE MAINTENANCE OF KOMATSU DUMP TRUCK HD785-7 USING NAÏVE BAYES CLASSIFIER UNDER FULL MAINTENANCE CONTRACT Paimin; Gembong Baskoro; Iwan Sahputra
Jurnal Dinamika Vokasional Teknik Mesin Vol. 10 No. 2 (2025)
Publisher : Department of Mechanical Engineering Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21831/dinamika.v10i2.89737

Abstract

This study proposes a Prescriptive Maintenance (RxM) framework aimed at improving the Physical Availability (PA) of Komatsu Dump Trucks HD785-7 operated under a Full Maintenance Contract (FMC) at PT ABC Site Sangkulirang. The research integrates the DMAIC methodology with the Knowledge Discovery in Databases (KDD) process to systematically analyze operational failures. Historical breakdown data were preprocessed and modeled using a Naïve Bayes (NB) classifier, selected for its robustness in handling categorical features common in maintenance records. The model demonstrated high predictive performance with 97.93% accuracy, 100% precision, 94.12% recall, and an AUC of 0.995, indicating strong reliability in distinguishing high-risk conditions. The RxM framework was embedded into daily maintenance planning and Standard Operating Procedures (SOPs), supported by a monitoring dashboard for continuous feedback and retraining. As a result, the proportion of Breakdown Unscheduled (BUS) events decreased from 45% in 2024 to 26% in mid-2025, while fleet PA consistently exceeded the contractual target of 92%, reaching 95.5%. These findings confirm that embedding prescriptive analytics into maintenance workflows not only reduces unplanned downtime but also enhances resource allocation and decision-making. The case study highlights the practical value of combining statistical learning with structured process improvement to drive digital transformation in mining operations.
IMPROVING MEAN TIME BETWEEN FAILURE OF HYDRAULIC EXCAVATOR KOMATSU PC4000-6 BY USING DMAIC Deni Eko Mukti; Gembong Baskoro
ILTEK : Jurnal Teknologi Vol. 21 No. 02 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/9zrpdv71

Abstract

The maintenance process of heavy equipment, particularly the Hydraulic Excavator Komatsu PC4000-6, is highly complex as it is influenced by machine quality, work methods, materials, and operator skills. PT United Tractors Tbk faced a challenge in its Full Maintenance Contract with PT XYZ, as the Mean Time Between Failure (MTBF) failed to reach the target of 100 hours and only achieved 80 hours (80%). This research applied the DMAIC approach, FMEA (Risk Priority Number), Pareto analysis, 5W2H, and Why-Why analysis to identify root causes and formulate improvement strategies. The results showed that the proposed strategy successfully increased MTBF from 80 hours to 100 hours, fulfilling the contractual target. This improvement not only supports the productivity of hydraulic excavators in mining operations but also enables PT United Tractors Tbk to maintain service quality in its Full Maintenance Contractbusiness.
INCREASING THE PRODUCTIVITY OF THE PC2000 AND PC1250 EXCAVATORS BY REDUCING ABNORMAL CYCLE DT HAULER AT PT. PAMA SMMS SEKAKO Hendri Albert Nopaer Simanjuntak; Dena Hendriana; Gembong Baskoro
ILTEK : Jurnal Teknologi Vol. 21 No. 02 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/qcgbgy95

Abstract

Excavator productivity is a critical factor in overburden stripping activities in coal mining. This study aims to improve the productivity of Komatsu PC2000 and PC1250 excavators at PT PAMA Site SMMS Sekako, Central Kalimantan, which during July–December 2023 reached only 597.26 bcm/hour (96% of the 623 bcm/hour target). The dominant cause of underperformance was the occurrence of abnormal dump truck (DT) hauler cycles. The study applied time study, work sampling, and fishbone analysis methods. The improvement measures included enhancing blasting fragmentation quality, introducing DT parking methods during shift changes, improving operator start-up discipline, monitoring operations through a Long-Range Control System (LRCS), and increasing the physical availability of equipment. The implementation of these corrective actions successfully increased average productivity by 12%, from 600 bcm/hour to 678 bcm/hour, exceeding the company’s target. These findings emphasize the crucial role of DT cycle management in supporting production achievement.
IMPROVEMENT OF FORECASTING & INVENTORY CONTROL FOR OPTIMIZING INVENTORY AT PT UNITED TRACTORS SITE MUARA TIGA BESAR Muhammad Ridho Fabio; Aditya T. Pratama; Gembong Baskoro
ILTEK : Jurnal Teknologi Vol. 21 No. 02 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/r72x7674

Abstract

PT United Tractors, Muara Tiga Besar site, faces challenges in spare parts inventory management. Days of Inventory (DOI) performance increased to 81.9 days in May 2024, far exceeding the corporate target of 70 days. This condition leads to higher storage costs and inefficiencies. This research aims to improve DOI performance using the DMAIC framework, with root cause analysis via 5 Why Analysis and improvements implemented through Simple Moving Average (SMA) forecasting and inventory control using the Periodic Review System and Continuous Review System. The results show that SMA forecasting successfully reduced DOI to 72 days, while the Continuous Review System decreased storage costs by 49%. These findings demonstrate that integrating forecasting with systematic inventory control can create cost efficiency while maintaining customer service levels.
IMPROVING MAINTENANCE STRATEGY FOR SCANIA P410-HT USING DMAIC AT PT.KPP INDE JOBSITE Yudha Mahendra Agni; Gembong Baskoro; Iwan Halim Sahputra
ILTEK : Jurnal Teknologi Vol. 21 No. 02 (2026): ILTEK : Jurnal Teknologi
Publisher : Fakultas Teknik Universitas Islam Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47398/vyk1jz24

Abstract

This study aims to improve the maintenance strategy of Scania P410-HT units operating at PT Kalimantan Prima Persada (KPP) INDE jobsite by applying the DMAIC (Define–Measure–Analyze–Improve–Control) methodology. Equipment availability fell below the contractual target of 92%, mainly due to frequent breakdowns, low Mean Time Between Failures (MTBF < 120 hours), and high Mean Time to Repair (MTTR > 4 hours). Data were collected from breakdown records, periodic inspection results, and mechanic performance. Pareto analysis and 5-Why were used to identify root causes, followed by FMEA to prioritize failure modes. Improvement strategies included redesigning the radiator system, enhancing mechanic competency, developing new check sheets for periodic inspection, and scheduling critical component replacement. After implementation, physical availability increased from 87.84% to 94.09%, surpassing the contractual target. This confirms DMAIC’s effectiveness in optimizing maintenance and reducing downtime.