Analysis of Steam Needs at Stelilizer Station With 80 Minutes at Pt Socfindo Seunagan Palm Oil Factory Asri Refendi Refendi; Sulaiman Ali; Joli Supardi
Jurnal Inotera Vol. 7 No. 2 (2022): July-December 2022
Publisher : LPPM Politeknik Aceh Selatan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31572/inotera.Vol7.Iss2.2022.ID166

Abstract

The process of making palm oil fresh fruit bunches (FFB) into crude palm oil (CPO) goes through many processing sessions. The processing steps were tried at several stations, including reception stations, sorting stations, sterilizer stations, thresher stations, digester and press stations, and clarification stations. One very useful process lies in the sterilizer station. The quality of the resulting CPO, one of which depends on the boiling process at the sterilizer station. FFB boiling process at PT. Socfindo seunagan uses a triple peak system, with pressures near 2.5 to 3 bar. The boiling process is tried for 80 to 85 minutes. The processing time, which takes so long, will ripen the fruit to the bottom
Damage Analysis of Hydraulic Bucket Cylinder on Excavator Komatsu CP-200 At PT. Wiratako Mitra Mulia Riski Arianda; Masykur; Herri Darsan; Al Munawir; Joli Supardi
Jurnal Inotera Vol. 7 No. 2 (2022): July-December 2022
Publisher : LPPM Politeknik Aceh Selatan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31572/inotera.Vol7.Iss2.2022.ID191

Abstract

PT. Wiratako Mitra Mulia is a company engaged in asphalt construction and road repair. At this time PT. Wiratako Mitra Mulia uses several heavy equipment to facilitate the work process, one of the heavy equipment used by PT. Wiratako Mitra Mulia is an excavator which is used for the process of dredging soil, moving materials and leveling the ground. From this, there are several obstacles or problems that occur in the excavator, such as damage to the bucket hydraulic cylinder, in which the bucket hydraulic cylinder has an oil leak, cylinder piston damage and seal leakage, therefore proper and scheduled maintenance is needed so that the damage that occurs to the hydraulic cylinder of the bucket excavator can be minimized so that the work process can run smoothly and do not experience any problems. Therefore, daily, weekly, monthly and yearly maintenance is required. For daily maintenance carried out every day by checking lubricants and performing services, for weekly maintenance inspections are carried out every 60 working hours. For monthly maintenance it is done every 250 working hours and for annual maintenance it is done every 2500 working hours.
Analysis of the Causes of Failure and Damage to Conveyor Scraper for Transporting Oil Palm Bunches at PT. Socfindo Seunagan Plantation using the FMEA Method (Failure Modes Effect Analysis) Rizwan; Joli Supardi Joli; Masykur; Veranita
Jurnal Inotera Vol. 8 No. 2 (2023): July - December 2023
Publisher : LPPM Politeknik Aceh Selatan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31572/inotera.Vol8.Iss2.2023.ID273

Abstract

PT. Socfindo Kebun seunagan is a company engaged in the plantation and processing of Fresh Fruit Bunches (FFB) into Crude Palm Oil (CPO). Fresh Fruit Bunches before processing, are first transported using a conveyor to be processed into oil (CPO) from a sterilizer. Based on the analysis of damage and failure that often occurs in scrapper conveyor parts, damage is hampered by the productivity of the company. The purpose of this study is to analyze the causes of failure and damage that occur on the scrapper conveyor by calculating the RPN (Risk Priority Number) value of each failure and damage that occurs to determine maintenance actions that need to be followed up. The results of the analysis showed that there were failures and potential damage to the scrapper conveyor, including the release of the scrapper conveyor chain connecting of 135 RPN, the wear of the scrapper conveyor chain of 40 RPN, and the rupture of the bearing of 56 RPN. Connecting the scrapper conveyor chain is more often damaged than other parts, so monitoring and repair are prioritized. Overall, the factors causing damage and failure are caused by lack of routine maintenance so that they are damaged.