Analisis Konsumsi Bahan Bakar Alat Muat dan Angkut Pada Pengupasan Overburden di PT Putra Maga Nanditama Bengkulu Utara Alamsyah, Muhammad Izhar; Franto, Franto; Andini, Delita Ega
MINERAL Vol 9 No 2 (2024): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i2.5135

Abstract

The research was conducted at PT Putra Maga Nanditama site Gunung Selan, PT Putra Maga Nanditama is a company engaged in coal mining. The background to the research is that overburden production did not reach the company's target and fuel consumption for overburden loading and transport equipment exceeded the company's fuel target. The research method used is a quantitative method. Data collection consists of primary and secondary data. Primary data includes tool cycle time and work efficiency, actual fuel consumption as well as road geometry and distance to disposal. Secondary data in the form of regional performance maps, equipment specifications, rainfall data, equipment working hours data, drone maps for August 2023 and contours. Based on the results of research in the field, factors that influence fuel consumption such as road geometry, road conditions and distance to overburden disposal are still not in accordance with established standards. The productivity of the DX800LC Excavator is 279.59 BCM/hour, the Doosan DA45 ADT is 60.47 BCM/hour and the Volvo A40G ADT is 59.37 BCM/hour. For Doosan DX800LC Excavator fuel consumption is 48.21 liters/hour, ADT Doosan DA45 is 26.62 and ADT Volvo A40G is 23.72 liters/hour. The actual fuel comparison for the two haulers is that the ADT Volvo A40G is more efficient than the ADT Doosan DA45 both in terms of fuel consumption and fuel costs.
Evaluasi Kinerja Alat Pengolahan Wet Belt Low Intensity Magnetic Separator (WBLIMS) Untuk Meningkatkan Kadar dan Recovery Sn di TB Primer Batubesi PT Timah Tbk Kabupaten Belitung Timur: (Performance Evaluation of Wet Belt Low Intensity Magnetic Separator (WBLIMS) for Enhancing Grade and Recovery of Sn in the Primary TB Batubesi Site PT Timah Tbk East Belitung Regency) Pangestu, Dimas; Franto, Franto; Pitulima, Janiar
MINERAL Vol 8 No 2 (2023): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v8i2.5020

Abstract

Primary TB Batubesi Site a subsidiary of PT Timah Tbk, processes primary tin feed stockpile and SHP of oxide clay type using various tools, including the Wet Belt Low Intensity Magnetic Separator (WBLIMS). Currently, WBLIMS can only produce tin concentrate with a grade of 0.5-2% and a recovery of 5-8%, falling below the company's target of 8% grade and 15% recovery (XRF Test). This research conducted eight experiments with variations in feed types and rates. The WBLIMS feed from the stockpile has a Sn content of 0.62%, resulting in a tin concentrate with 1.21% Sn and a recovery of 7.05%. On the other hand, the feed from SHP has a Sn content of 0.61%, resulting in a tin concentrate with 0.95% Sn and a recovery of 5.11%. The type and rate of feed affect the increase in Sn grade and recovery. At low feed rates, the feed material yields lower Sn grade and recovery, while at high feed rates, the results are higher. Increasing the feed rate for WBLIMS from the stockpile leads to a decrease in Sn grade and recovery, whereas in the processing of SHP, the Sn grade increases but recovery varies. Experiments F1L1 and F2L3 yield the most optimal Sn grade and recovery, with F1L1 having a Sn grade of 2.28% and recovery of 11.54%, and F2L3 having a Sn grade of 2.87% and recovery of 9.24%. Although not reaching the company's target, these experimental results can enhance the Sn grade and recovery compared to the previous setup.
Perhitungan Volume Stockpile dan Pengoptimalan Waktu Pengolahan Stockpile 3, 5 dan 6 Terhadap Produksi Alat Gali muat dan Alat Angkut pada TB Primer Batubesi PT Timah Tbk: Calculation of Volume Stockpile and Optimization of Stockpile Processing Time 3, 5 and 6 Against the Production of Digging and Loading Equipment and Transport Equipment in Primary TB Batubesi PT Timah Tbk Sherina, Neni; Franto, Franto; Mardiah, Mardiah
MINERAL Vol 8 No 2 (2023): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v8i2.5070

Abstract

PT Timah Tbk's Batubesi Primary Large Mine has experienced a significant decline in production in recent years, causing a change in the mining process to stockpile management that is still economical with a grade of 0.2%. This study aims to determine the volume and production of stockpiles 3, 5 and 6, the type of sediment and Sn content of stockpile material and the time required to spend stockpile material 3, 5 and 6 in order to get the optimal time. The method used is a quantitative method by taking cycle time data as much as 30 data and analyzing sample levels using XRF on each stockpile. The results of this study obtained the volume of stockpile 3 material is 132,648.42 m3,, stockpile 5 is 162,570.25 m3, and stockpile 6 is 33,090.19 m3. The calculated machine productivity at stockpile 3 is 42.17 tons/hour, stockpile 5 is 48.11 tons/hour and stockpile 6 is 39.53 tons/hour. The highest Sn content is found in stockpile 6 which is 0.33% with the type of skarn sediment. While the lowest Sn content is found in stockpile 3 which is 0.2% with oxide clay sediment type. In stockpile 5, the Sn content is 0.31% with the type of oxide clay sediment. The remaining volume of stockpile material in stockpiles 3, 5 and 6 can be spent with a time of 2.78 years using 1 unit of excavation equipment and 1 unit of transportation equipment. Optimization is carried out so that the remaining stockpile reserves can be spent within 1.74 years using 1 unit of excavation equipment and 2 units of transport equipment.
Analisis Konsumsi Bahan Bakar Alat Muat dan Angkut Pada Pengupasan Overburden di PT Putra Maga Nanditama Bengkulu Utara: Analysis of Fuel Consumption of Loading and Transport Equipment in Overburden Stripping at PT Putra Maga Nanditama North Bengkulu Alamsyah, Muhammad Izhar; Franto, Franto; Andini, Delita Ega
MINERAL Vol 9 No 2 (2024): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i2.5135

Abstract

The research was conducted at PT Putra Maga Nanditama site Gunung Selan, PT Putra Maga Nanditama is a company engaged in coal mining. The background to the research is that overburden production did not reach the company's target and fuel consumption for overburden loading and transport equipment exceeded the company's fuel target. The research method used is a quantitative method. Data collection consists of primary and secondary data. Primary data includes tool cycle time and work efficiency, actual fuel consumption as well as road geometry and distance to disposal. Secondary data in the form of regional performance maps, equipment specifications, rainfall data, equipment working hours data, drone maps for August 2023 and contours. Based on the results of research in the field, factors that influence fuel consumption such as road geometry, road conditions and distance to overburden disposal are still not in accordance with established standards. The productivity of the DX800LC Excavator is 279.59 BCM/hour, the Doosan DA45 ADT is 60.47 BCM/hour and the Volvo A40G ADT is 59.37 BCM/hour. For Doosan DX800LC Excavator fuel consumption is 48.21 liters/hour, ADT Doosan DA45 is 26.62 and ADT Volvo A40G is 23.72 liters/hour. The actual fuel comparison for the two haulers is that the ADT Volvo A40G is more efficient than the ADT Doosan DA45 both in terms of fuel consumption and fuel costs.
Perencanaan Tahapan Persiapan Dan Perhitungan Reklamasi Di Lahan Bekas Tambang Air Rikai PT Timah Tbk Kabupaten Bangka: Planning for Preparatory Stages and Reclamation Calculations on the Former Air Rikai Mine Land of PT Timah Tbk, Bangka Regency Zahrah, Salsabila Oldia; Franto, Franto; Mardiah, Mardiah
MINERAL Vol 9 No 1 (2024): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i1.5140

Abstract

The research location chosen was the Air Rikai ex-mining land, which is an alluvial ex-mining land within the IUP of PT Timah Tbk. The negative impact that arises from mining is in the form of land damage. This research aims to overcome damage and also ensure that reclamation activities can be carried out well. The method used in this research is a quantitative method. The data taken is in the form of soil samples, soil pH and water pH data, topographic data (x,y,z coordinates) and bathymetric data for the depth of the pit. The results of data processing and analysis show that the condition of the land to be reclaimed has an area of 13 Ha and is divided into 2, namely voids with a total area of 1.57 Ha and land area of 11.43 Ha. Land use is carried out by stockpiling overburden with a required volume of overburden of 35,511.54 m³. Land leveling with a volume of pushed soil of 35,280 m³. Arrangement of the edge of the pit with a volume of soil moved of 230.29 m³. Construction of drainage channels with an excavation volume of 214.59 m³. Installation of concrete buis type culverts with dimensions of 50 x 50 cm and a length of 50 cm. In the revegetation, 1,517 oil palm trees were planted, then 463 sea cypress trees were planted along the underside and LCC seeds to help loosen the soil. Treating acid mine drainage with 350 water hyacinths. The costs required for reclamation are divided into 2, namely, Direct Costs and Indirect Costs. The direct costs required are IDR 679,286,160 and the indirect costs required are IDR 213,975,140. The total costs required for reclamation of land with an area of 13 Ha are IDR 893,261,300.