Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : ProBisnis : Jurnal Manajemen

Financial distress analysis uses the modified Altman z-score method at PT. Prasidha Aneka Niaga Tbk for the 2019-2021 period Seleky, Roy; Christianty, Restia; Latuconsina, Zainuddin
ProBisnis : Jurnal Manajemen Vol. 15 No. 2 (2024): April: Management Science
Publisher : Lembaga Riset, Publikasi dan Konsultasi JONHARIONO

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The purpose of this study was to determine the financial condition of Perum Perumnas Regional-1 Medan using the Altman Z-score method. The data analysis technique used in this study was descriptive analysis technique, namely collecting data, classifying data, explaining data and analyzing data. The results of the study show that with the Altman Z-score method, companies experience financial distress every year.
Cash Management Analysis in an Efforts to Maintain Liquidity Stability at PT Midi Utama Indonesia tbk 2020-2023 Period Seleky, Roy; Christianty, Restia
ProBisnis : Jurnal Manajemen Vol. 16 No. 2 (2025): April 2025: Management Science
Publisher : Lembaga Riset, Publikasi dan Konsultasi JONHARIONO

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to analyze cash management in an effort to maintain liquidity stability at PT MIDI UTAMA INDONESIA Tbk for the period 202-2023.The type of research is quantitative descriptive research, using data sourced from IDKS as a research instrument. Data analysis techniques use Cash Management analysis (Optimal Cash Balance and Liquidity Ratios such as Current ratio, Quick ratio and cash ratio.The results of the study show that the company's ability has not been able to provide good results. This is proven by the calculation of the optimal cash balance that the company should have from 2020 - 2023 has never been achieved by the company, in terms of calculating the Liquidity ratio, all the ratios calculated show that the results obtained are at a figure > 1, which means that the company's cash has not been able to meet its obligations.