Pemetaan Detil Situasi dengan Gnss Rtk untuk Penyelesaian Permasalahan Banjir Wilayah Permukiman Apriliani, Rizki Astri; Susilo, Yunus; Alina, Aldea Noor; Santosa, Rudy; Lauranda, M. Rendy
J-ABDIPAMAS (Jurnal Pengabdian Kepada Masyarakat) Vol. 8 No. 1 (2024): April 2024
Publisher : IKIP PGRI Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30734/j-abdipamas.v8i1.4252

Abstract

ABSTRACTUrban population density is increasing. Population growth has an impact on demand for land and a reduction in water catchment areas which are usually green conservation areas and are not allowed to become residential areas. RW 08, located in Wonorejo Village, Surabaya City, is developing into a rapid residential area. This condition reduces space for water absorption, causing flooding in the rainy season. The basic problem faced by RW 8, Wonorejo Village, is that it does not yet have a topographic map that describes it in detail to determine the height and low of the road surface. The next problem is the difficulty of implementing the Basic Building Coefficient (KDB) which requires at least 50% of the land to be built. Starting from the problems that exist in the RW 08 area, efforts are needed to prevent flooding from recurring. The first attempt to resolve the flooding problem was carried out by mapping the situation of the RW 08 area to produce a situation map of the land location with contour elevation information which will later be used as a reference for drainage planning in RW 08. Mapping the situation was carried out by delineating land boundaries by drawing on a work map and surveying straight to the field. After that, elevation mapping was carried out by measuring contours using GNSS using the Real Time Kinematic method. Keywords: Settlements, Flood, Topography, GNSS ABSTRAKKepadatan masyarakat perkotaan semakin meningkat. Pertambahan penduduk berdampak pada permintaan akan lahan dan berkurangnya daerah resapan air yang biasanya merupakan kawasan konservasi hijau dan tidak diperkenankan menjadi area pemukiman. RW 08 yang berada di Kelurahan Wonorejo Kota Surabaya berkembang menjadi area tempat tinggal yang pesat.  Kondisi ini mengurangi ruang untuk resapan air, menyebabkan banjir pada musim penghujan. Masalah mendasar yang dihadapi RW 8 Kelurahan Wonorejo belum mempunyai peta topografi yang menggambarkan secara detail guna mengetahui tinggi rendahnya permukaan jalan. Permasalahan selanjutnya yakni kesulitan untuk menerapkan Koefisien Dasar Bangunan (KDB) yang mengharuskan setidaknya 50% tanah di bangun. Berangkat dari permasalahan yang ada di wilayah RW 08, maka perlu adanya upaya yang mampu mencegah terjadinya pengulangan banjir. Upaya penyelesaian masalah banjir yang pertama kali dilakukandengan melakukan pemetaan situasi kawasan RW 08 untuk menghasilkan peta situasi lokasi lahan dengan keterangan elevasi kontur yang nantinya akan digunakan sebagai acuan perencanaan drainase di RW 08. Pemetaan situasi dilakukan dengan delineasi batas lahan dengan penggambaran pada peta kerja dan peninjauan langsung ke lapangan. Setelahnya pemetaan elevasi dilakukan dengan melakukan pengukuran kontur menggunakan GNSS dengan metode Real Time Kinematic (RTK).Kata Kunci: Permukiman, Banjir, Topografi, GNSS
Rencana Penyusunan Infrastruktur Desa Wisata Budaya Tlemang Kecamatan Ngimbang Kabupaten Lamongan Kuncaravita, Sekar Ayu; Asid, Nurul Jannah; Apriliani, Rizki Astri; Abiarto, Wisnu; Aryanta, Moch. edra Aurick
J-ABDIPAMAS (Jurnal Pengabdian Kepada Masyarakat) Vol. 8 No. 2 (2024): Oktober 2024
Publisher : IKIP PGRI Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30734/j-abdipamas.v8i2.4475

Abstract

ABSTRACTLocal cultural tourism village is a tourism concept that aims to promote and preserve local culture in the region. Villages that have potential have the potential to be developed into local cultural tourism villages or can be developed into educational tourism. One area that has the potential to be developed into an educational tourism village with the potential to preserve local culture is Tlemang Village, Ngimbang Sub-district, Lamongan Regency. Tlemang Village is one of the villages in Lamongan Regency that has a cultural heritage tradition commonly called Nyanggring. However, the unique history and traditions owned by Tlemang Village have not been recognized by the public, and there has been no development towards a cultural tourism village. Seeing these problems, the community service team is interested in helping in making an infrastructure development plan based on the uniqueness of traditions and tourism potential in Tlemang Village to be developed into a Local Cultural Tourism Village in Lamongan Regency. The methods used in this community service activity are Participatory Rural Appraisal (PRA) and Focus Group Discussion (FGD). The results of this community service activity are the development strategy of Tlemang Village, including the arrangement of plantations, marketing of MSME products, supporting building criteria, village branding, area landscape, and tourist packages contained in the Master Plan.Keywords: Plan, Infrastructure, Village, Tourism, Culture. ABSTRAKDesa wisata budaya lokal merupakan konsep pariwisata yang bertujuan untuk mempromosikan dan melestarikan budaya lokal di daerah. Desa yang yang memiliki potensi, berpotensi untuk dikembangkan menjadi desa wisata budaya lokal atau dapat dikembangkan menjadi edukasi wisata. Salah satu daerah yang berpotensi untuk dikembangkan menjadi desa wisata edukasi dengan potensi pelestarian budaya lokal adalah Desa Tlemang Kecamatan Ngimbang Kabupaten Lamongan. Desa Tlemang merupakan salah satu desa yang ada di Kabupaten Lamongan yang memiliki peninggalan budaya tradisi yang biasa disebut Nyanggring. Namun, sejarah dan tradisi unik yang dimiliki oleh Desa Tlemang belum dikenal oleh khalayak dan belum serta belum adanya pengembangan menuju desa wisata budaya. Melihat permasalahan tersebut, tim pengabdian kepada masyarakat tertarik untuk membantu dalam pembuatan rencana pengembangan infrastruktur yang berdasarkan keunikan tradisi dan potensi wisata  yang ada di Desa Tlemang untuk dapat dikembangkan menjadi Desa Wisata Budaya Lokal di Kabupaten Lamongan. Adapun metode yang digunakan dalam kegiatan pengabdian ini adalah Participatory Rural Appraisal (PRA) dan  Focus Grup Discussion (FGD). Adapun hasil dari kegiatan pengabdian kepada masyarakat ini adalah tersusunnya strategi pengembangan Desa Tlemang di antaranya adalah penataan perkebunan, pemasaran produk UMKM, kriteria bangunan pendukung, branding desa, landscape kawasan, dan tourist package yang tertuang dalam Master Plan.Kata Kunci: Rencana, Infrastruktur, Desa, Wisata, Budaya.
PEMODELAN HUJAN-DEBIT MENGGUNAKAN STROM WATER MANAGEMENT MODEL UNTUK EVALUASI SISTEM DRAINASE STUDI KASUS : RW 08 KELURAHAN WONOREJO SURABAYA Nurul Jannah Asid; Rizki Astri Apriliani; I Nyoman Renal Aryayoga
Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja) Vol 14 No 1 (2026): Jurnal Ilmiah MITSU
Publisher : Fakultas Teknik, Universitas Wiraraja

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24929/ft.v14i1.3623

Abstract

Kawasan pemukiman Rw 08 Kelurahan Wonorejo Kecamatan Rungkut, Surabaya terjadi banyak perubahan lahan dikarenakan meningkatnya Pembangunan permukiman. Pembangunan kawasan perumahan menyebabkan terganggunya sistem drainase dikawasan tersebut, dan sering terjadi banjir. Dari hal yang terjadi lokasi penelitian perlu dilakukan evaluasi dan pemodelan untuk mengatasi terjadinya limpasan, Analisa menggunakan aplikasi SWMM untuk melakukan permodelan saluran drainase. Sebelum simulasi saluran drainase dilakukan perhitungan hujan rencana yang akan diinput pada aplikasi SWMM. Berdasarkan pemodelan yang didapat di kawasan Rw 08 Kelurahan Wonorejo Surabaya berjumlah 117 subcatchment, 227 juction node, 4 outfalls dan 385 counduit. Setelah dilakukan running pada aplikasi SWMM muncul nilai continuity error dari hasil running adalah -0.25% dan nilai flow routing adalah 0.00%. Maka dapat disimpulkan jika nilai flow routing diatas 5%. Dari hasil running ditemukan 68 saluran drainase mengalami limpasan dari 385 Saluran dikarenakan curah hujan yang tinggi pada periode 2 jam.
Implementasi Building Information Modeling (BIM) Dalam Estimasi Quantity Take Off (Studi Kasus : Pekerjaan Galian Bendungan Utama Pada Proyek Pembangunan Bendungan Mbay): Implementation of Building Information Modeling (BIM) in Estimating Quantity Take Off (Case Study: Main Dam Excavation Work in the Mbay Dam Construction Project) Moch. Istitho Chubbillah; Rizki Astri Apriliani; Wisnu Abiarto
CONCRETE: Construction and Civil Integration Technology Vol. 2 No. 01: April 2024
Publisher : Dr. Soetomo University Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/concrete.v2i01.7880

Abstract

BIM memfasilitasi proses desain dan konstruksi terintegrasi untuk mendapatkan hasil yang lebih baik, pengeluaran serta durasi proyek yang berkurang dan terkendali. Autodesk juga merilis perangkat lunak berbasis BIM yang disebut Navisworks. Navisworks ini mengintegrasi interdisiplin ilmu modelling, scheduling, dan quantity.Penelitian ini membahas penggunaan konsep Building Information Modeling (BIM) dengan menggunakan 3D modeling pada pekerjaan galian tanah untuk memperoleh hasil quantity take off yang mengurangi waste sehingga meningkatkan value proyek, Autodesk Navisworks dapat membandingkan hasil quantity take off yang didapatkan menggunakan software Navisworks dengan dibantu software pendukung yaitu Microsoft Excel, pada analisa estimasi quantity take off material yang dibandingkan dengan perhitungan secara konvensional diharapkan dapat memberikan gambaran bahwa dalam menggunakan software komputer lebih efektif dan efisien serta dapat meminimalisasi waste dan meningkatkan value pada proyek konstruksi. Penelitian dilakukan dalam penerapan 5D BIM untuk estimasi quantity take off pada pekerjaan tanah.Hasil analisis menunjukan berapa selisih perhitungan volume eksisting (konvensional) dengan volume hasil Quantity Take Off menggunakan konsep Building Information Modeling (BIM) pada pekerjaan galian bendungan utama. Pada pekerjaan galian bendungan utama memiliki deviasi rata-rata 5.52%, dari hasil rata-rata deviasi pada masing-masing item pekerjaan tersebut dapat diterima dan digunakan untuk pekerjaan galian bendungan utama sehingga pekerjaan menjadi lebih efisien serta dapat meminimalisasi waste dan meningkatkan value pada proyek.
Analisis Perbandingan Koefisien Di HSPK Surabaya 2023 Dan AHSP PUPR 2022 Terhadap Koefisien Aktual: Comparative Analysis of Coefficients in HSPK Surabaya 2023 and AHSP PUPR 2022 Against Actual Coefficients Anas Sholikin; Maulidya Octaviani; Rizki Astri Apriliani
CONCRETE: Construction and Civil Integration Technology Vol. 2 No. 01: April 2024
Publisher : Dr. Soetomo University Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/concrete.v2i01.8134

Abstract

Beton merupakan bagian dari material struktur bangunan yang terdiri dari campuran agregat halus, agregat kasar, semen dan air sebagai pengikat. Beton memiliki daya kuat tekan yang tinggi, namun lemah dalam menahan kuat tarik dan bersifat getas (brittle). Pemberian serat termasuk dapat memperbaiki kelemahan beton yaitu dapat memberi tulangan pada beton juga diantaranya serat nilon. Nilon memiliki sifat karakteristik yang baik pada durability dan daktilitas yang besar. Penelitian ini bertujuan untuk mengetahui sifat mekanik beton normal dengan beton serat terhadap kuat tekan dan kuat tarik belah berdasarkan variasinya. Metode yang dipakai yaitu eksperimen. Mutu rencana f’c = 30 MPa, menggunakan nilon Ø0,6mm panjang ±8 cm bersimpul. Jumlah benda uji 60 buah yaitu kuat tekan 36 buah, kuat tarik belah 12 buah menggunakan silinder 15x30 cm dan porositas 12 buah menggunakan silinder 5x10 cm. Pengujian kuat tekan dilakukan saat beton berumur 7 14 dan 28 hari, kuat tarik belah dan porositas 28 hari. Hasil pengujian beton umur 28 hari menunjukkan nilai kuat tekan maksimum terdapat pada variasi 1,25% yaitu 26,22 MPa mengalami peningkatan 26,4% dibandingkan dengan beton normal 0% yaitu 20,75 MPa. Sedangkan nilai kuat tarik belah menurun secara berturut seiring dengan pertambahan variasi dimana maksimum terdapat pada variasi 0% maupun 1% menghasilkan nilai yang sama yaitu 2,74 MPa, pada variasi 1,25% dan 1,5% yaitu 2,69 MPa dan 2,59 MPa mengalami penurunan 1,9% dan 5,7% dari beton normal. Ditarik kesimpulan bahwa beton normal memiliki daya kuat tekan 20,75 MPa dan kuat tarik belah 2,74 MPa, sedangkan beton serat nilon memiliki daya kuat tekan 26,22 MPa di variasi 1,25% dan kuat tarik belah 2,74 MPa di variasi 1% dan menghasilkan beton yang sedikit lebih daktail. Hal ini menunjukkan bahwa penambahan serat nilon dapat membantu meningkatkan nilai kuat tekan namun tidak dalam mengatasi kelemahan pada kuat tarik belah beton.