Studi Daya Dukung Tanah Lempung Plastisitas Rendah Yang Distabilisasi Menggunakan TX-300 Sebagai Lapisan Subgrade Erwan Syafri; Muhammad Jafri; Lusmeilia Afriani
Jurnal Teknik Sipil Vol 3, No 2 (2012): Oktober
Publisher : Universitas Bandar Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (353.263 KB) | DOI: 10.36448/jts.v3i2.277

Abstract

Soil is a material that serves as an support for the basis of a constuction, be it construction of buildings, bridges and roads. Each region has different soil characteristics in other regions, there is good and has a bearing capacity of those that are poor. To improve the soil characteristics that can lead to por bearing capacity, the necessary repairs to soil stabilization methods. Stabilization efforts are often undertaken by stabilizing additives. In this research using a chemical additive material that is TX-300, which is expected to improve the characteristics of the soil so the soil is worthy of a construction established. Soil samples that tested in this research is the low plasticity clay are derived from Karang Anyar, South Lampung. Variation levels used ia a mixture of 0,8 ml; 1,1 ml; 1,4 ml and 1,7 ml with the same curing time for 7 days and soaking for 4 days. Based on the examination of the physical properties of original soil, AASHTO classify soil samples in group A-6 (clay soil), while the USCS soil samples classify as fine-grained soil and included into the CL group. The results of laboratory research showed that the stabilizing agent TX-300 can improve the physical and mechanical properties of low plasticity clay. On physical testing such as decreased specific gravity and atterberg limits increase after stabilized. While the mechanical testing, a mixture of TX-300 can increase the bearing capacity of the land. From the test results of CBR soaked or unsoaked, soil stabilized with a stabilizing agent TX-300 at optimum levels can be used as a subgrade for road construction due to CBR value = 6 %Tanah merupakan material yang berfungsi sebagai penyokong dasar suatu konstruksi, baik itu konstruksi gedung, jembatan maupun jalan. Setiap daerah memiliki sifat tanah yang berbeda dengan daerah lainnya, ada yang mempunyai daya dukung baik dan adapula yang buruk. Untuk memperbaiki sifat tanah yang dapat mengakibatkan daya dukung menjadi buruk, maka diperlukan perbaikan tanah dengan metode stabilisasi. Usaha stabilisasi yang banyak dilakukan adalah stabilisasi dengan bahan tambahan. Pada penelitian ini menggunakan bahan additif kimia yaitu TX-300 yang diharapkan mampu memperbaiki sifat tanah sehingga pada lapisan tanah tersebut layak didirikan suatu konstruksi. Sampel tanah yang di uji pada penelitian ini yaitu tanah lempung plastisitas rendah yang berasal dari daerah Karang Anyar, Lampung Selatan. Variasi kadar campuran yang digunakan yaitu 0,8 ml; 1,1 ml; 1,4 ml dan 1,7 ml; dengan dilakukan waktu pemeraman yang sama selama 7 hari dan perendaman selama 4 hari. Berdasarkan pemeriksaan sifat fisik tanah asli, AASHTO mengklasifikasikan sampel tanah pada kelompok A-6 (tanah berlempung),sedangkan USCS mengklasifikasikan sampel tanah sebagai tanah berbutir halus dan termasuk kedalam kelompok CL. Hasil penelitian di laboratorium menunjukkan bahwa bahan stabilisasi TX-300 dapat memperbaiki sifat fisik dan mekanik tanah lempung plastisitas rendah. Pada pengujian fisik seperti berat jenis mengalami penurunan dan batas-batas Atterberg mengalami kenaikan setelah distabilisasi. Sementara pada pengujian mekanik, campuran TX-300 dapat meningkatkan daya dukung tanah tersebut. Dari hasil pengujian CBR rendaman atau tanpa rendaman, tanah yang distabilisasi dengan bahan stabilisasi TX-300 pada kadar optimum dapat digunakan sebagai tanah dasar pada konstruksi jalan dikarenakan nilai CBRnya = 6 %.
STRUKTUR KOMUNITAS KARANG PASCA TSUNAMI DI DESA KUNJIR, KECAMATAN RAJABASA, KABUPATEN LAMPUNG SELATAN, PROVINSI LAMPUNG Anma Hari Kusuma; Amril Ma’ruf Siregar; Helvi Yanfika; Puspita Yuliandari; Muhammad Havis; Lusmeilia Afriani; Rudy Rudy
Jurnal Perikanan Unram Vol 12 No 2 (2022): JURNAL PERIKANAN
Publisher : Universitas Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29303/jp.v12i2.301

Abstract

Ekosistem terumbu karang yang merupakan salah satu ekosistem wilayah pesisir yang memiliki peranan penting baik dari aspek ekologis maupun ekonomis. Namun karang sangat rentan terhadap kerusakan. Kerusakan tersebut dapat yang disebabkan faktor bencana alam seperti tsunami. Desa Kunjir merupakan salah satu desa terkena dampak dari bencana tsunami. Penelitian ini bertujuan mengukur struktur komunitas ekosistem di Desa Kunjir. Penelitian ini dilakukan dari bulan Juni-Desember 2021 menggunakan metode Line Intercept Transect (LIT). Hasil penilitian menunjukkan tutupan habitat bentik di Desa Kunjir sebagian besar berupa abiotik, dan patahan karang serta hanya sebagian kecil berupa karang hidup. Gelombang tsunami mengakibatkan ekosistem terumbu karang di perairan Desa Kunjir berada dalam kondisi rusak dengan kategori tinggi. Kegiatan rehabilitasi dan rekontruksi terhadap surnberdaya laut dan pesisir sangat dibutuhkan untuk memperbaiki ekosistem perairan dengan melibatkan partisipasi masyarakat setempat dengan pendampingan yang intensif.
Pemberdayaan kelompok masyarakat sadar wisata (pokdarwis) bina remaja Desa Kunjir terhadap literasi ekonomi digital Lusmeilia Afriani; Amril Maruf Siregar
Jurnal Sumbangsih Vol. 3 No. 2 (2022): Jurnal Sumbangsih (In Process)
Publisher : LPPM Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jsh.v3i2.99

Abstract

The Tourism Conscious Community Group (Pokdarwis) Bina Remaja Kunjir Village is one of the community groups assisted by LPPM Universitas Lampung. This group is part of a group of communities victims of the Sunda Strait Tsunami disaster that occurred at the end of 2018. Efforts to improve infrastructure, socio-economic and have been implemented in order to accelerate the economic revival of the community. One of the main potentials of Kunjir Village is tourism and creative economy. In the previous year, the capacity building activities of the Kunjir Village community in the field of processing handicrafts and village products have been running well. This activity is a follow-up to the previous activity where the service team will continue the wishes of the community by strengthening the ability. Understand, manage, and use technology wisely to be useful in everyday life. Digital literacy not only includes the ability to find and read information from digital media, but also requires a critical thinking process to manage, evaluate and utilize information obtained from various digital sources correctly, carefully, ethically and responsibly. The form of implementation of activities that will be carried out is in the form of training and technical guidance to Pokdarwis with the scope of skill enrichment in the field of digitizing handicraft products and promoting tourist attractions. The results of the implementation of the activity will be evaluated so that the benefits of this activity can be felt by the community
Analisa Revisi Desain pada Kinerja Pelaksanaan Konstruksi: Studi Kasus Gedung Kantor Pajak Pratama Natar Arneta Pratiwi Adipaty; Ika Kustiani; Lusmeilia Afriani; Chatarina Niken Dwsbu; Kristianto Usman
Teras Jurnal : Jurnal Teknik Sipil Vol. 15 No. 2 (2025): Teras Jurnal (September)
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v15i2.1246

Abstract

Abstrak   Pada Proyek Pembangunan Gedung Kantor Pelayanan Pajak Pratama – Natar, ditemukan masalah seperti gambar yang tidak dapat dilaksanakan, perubahan rencana kerja, dan perubahan scope pekerjaan. Tujuan penelitian adalah menganalisa faktor utama yang mempengaruhi perubahan desain dalam durasi pelaksanaan. Metode yang digunakan dengan melakukan penyebaran kuesioner sebagai data utama dan wawancara sebagai data pendukung, yang kemudian dianalisis menggunakan Analytical Hierarchy Process (AHP). Hasil penelitian dari perubahan desain pada proyek konstruksi, yang disebabkan oleh ketidaksesuaian antara rencana dan kondisi lapangan, mungkin berdampak signifikan terhadap durasi proyek. Perubahan ini dipicu oleh penyesuaian kondisi lapangan dan permintaan dari pihak pemilik proyek, seperti penambahan pos jaga serta instalasi air conditioner di area yang tidak direncanakan sebelumnya. Kesenjangan ini menyebabkan keterlambatan proyek, yang seharusnya telah mencapai 97% pada minggu ke-39, namun realisasinya hanya 63%. Faktor-faktor seperti penyesuaian lapangan dan permintaan pemilik proyek, termasuk penambahan fasilitas tak terduga, berkontribusi dominan terhadap keterlambatan dan peningkatan biaya kemudian dari 13 faktor yang dianalisis, faktor dominan yang mempengaruhi perubahan desain yaitu kesalahan estimasi biaya (prioritas 0,098%), ketidaktersediaan standar material (prioritas 0,085%), dan penundaan pekerjaan (prioritas 0,084%). Kesimpulan adalah bahwa perubahan desain dalam proyek konstruksi paling dominan dipengaruhi oleh faktor Kesalahan Estimasi Biaya dan Ketidaksesuaian Desain dengan Kondisi Lapangan, berdasarkan bobot prioritas tertinggi hasil metode Analytical Hierarchy Process (AHP). Kedua faktor ini berasal dari aspek perencanaan, yang terbukti lebih berpengaruh terhadap durasi proyek dibandingkan faktor pelaksanaan.   Kata kunci: manajemen perubahan, durasi pelaksanaan, AHP, faktor perencanaan, faktor konstruksi.   Abstract   The construction of the Pratama Tax Office Building in Natar encountered several issues, including unimplementable drawings, changes in work plans, and alterations in the project scope. This study aims to analyze the dominant factors influencing design changes that affect project duration. The research employed a questionnaire as the primary data collection method and interviews as supporting data, analyzed using the Analytical Hierarchy Process (AHP). The results indicate that design changes, triggered by discrepancies between the planning documents and actual site conditions, significantly impacted the project's timeline. These changes were largely driven by field adjustments and client requests, such as additional guard posts and unexpected air conditioning installations. The gap between plan and execution caused a delay, where the project was expected to reach 97% completion by week 39 but only achieved 63%. From the 13 factors analyzed, the most influential on design changes were cost estimation errors (priority 0.098%), unavailability of standard materials (0.085%), and work delays (0.084%). The study concludes that design changes in construction projects are predominantly influenced by planning-related factors, particularly cost estimation errors and inconsistencies between design and site conditions. These planning factors have a greater impact on project duration than those arising during execution.   Keywords: change management, project duration, AHP, planning factors, Construction factors.