PENILAIAN JUMLAH PENGGUNAAN TRUK ANGKUTAN DI DUA PERUSAHAAN HUTAN DI SUMATERA BARAT Dulsalam Dulsalam
Jurnal Penelitian Hasil Hutan Vol 6, No 8 (1990): Jurnal Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20886/jphh.1990.6.8.493 - 499

Abstract

A  study   on  the productivity  of  logging trucks  at  two  forest  companies  was done  in 1984, and  the result  is reported in  this article. Four logging  trucks  used by PT Ragusa  and  five by PT Pasar Besar were selected  randomly to study transport time and load  volumes  through work  time  study. The  purpose is to find out the optimum number of  trucks  suitable to transport logs from the forests to log ponds, processing places or other  distribution  point.  The result shows  that:Isuzu  TWD 20 trucks  were used to transport  logs at the  two forest  companies.The average log volume  per  and  trip  transportation at PT  Ragusa and PT Pasar Besar were  15.20 m3 and 12.84  m3, respectively.Average productivity at PT Ragusa and PT Pasar Besar were 45.6 m3/day  and 25.68  m3/day, respectively.Logging truck productivities were possibly influenced by load volumes and transport  distance.The  number of  logging  trucks  actually urged  in  hauling  logs at PT  Ragusa and  PT Pasar Besar were  5 and 11 units, respectively. Procurement of  new or reparation  of  idle  logging trucks  is strongly recommended.
UJI COBA PENGELUARAN KAYU DI HUTAN TANAMAN PULAU LAUT DENGAN SISTEM KABEL LAYANG P3HH20 YANG DISEMPURNAKAN Dulsalam Dulsalam; Djaban Tinambunan
Jurnal Penelitian Hasil Hutan Vol 20, No 4 (2002): Buletin Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20886/jphh.2002.20.4.313-331

Abstract

log extraction in undulating forest areas needs special attention. Forest Products Research Centre has made improvement on P3HH20 skyline system designed for extracting log on undulating area. The equipment consists of three main parts such as power machine unit, wire rope and its auxillary and carriage intended to guide log movement. At the first time, the capacity of the equipment was only 0.308 m3/round trip. In 1998, the equipment was improved and then in 1999 was tried to extract logs in forest plantation of PT Inhutani II. Pulau Laut. South Kalimantan. The choice of the location was done purposively. The objective is to prove whether the impoved P3HH20 skyline system is suitable for extracting log in plantation forest area having undulating terrain. The research results showed that:1. The use of improved P3HH20 skyline cable system for log extraction in plantation forest Pulau Laut provides promising suitability with still relatively low productivity,2. log diameter extracted ranged from 17 to 43 cm with an average of 23 cm while log length extracted ranged from 8 m to 12 m with an average of 11 m.3. log volume extracted varied from 0.026 to 0.309 m3/round trip with an average of 0.160 m3/round trip.4. Effective log extraction productivities ranged from 1.404 to 2.810 m3 (hour with an average of 1.980 m3/hour while the total log extraction productivities varied from 0.485 to 1.080 m3/hour with an average of 0.885 m/hour.5. The average of log extraction cost was Rp 23.572/m3.6. To increase log extraction productivity. it is suggested that further improvement on ballast and endless cable need to be done. as well as further trial infield operations.
EFISIENSI PENGANGKUTAN DAN MUAT BONGKAR KAYU DI SUATU PENGUSAHAAN HUTAN DI KALIMANTAN TENGAH Dulsalam Dulsalam; Arifin Suzanto
Jurnal Penelitian Hasil Hutan Vol 15, No 1 (1997): Buletin Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20886/jphh.1997.15.1.7-17

Abstract

Penelitian efisiensi dan muat bongkar kayu telah dilakukan di satu HPH di Kalimantan Tengah pada tahun 1994. Tujuan penelitian adalah untuk mendapatkan informasi tentang eflsiensi kegiatan pengangkutan dan muat-bongkar kayu guna meningkatkan produktivitas kerja. Data volume kayu yang diangkut, dimuat dan dibongkar serta waktu kerja pengangkutan, muat dan bongkar dikumpulkanDari hasil pembahasan dapat disimpulkan bahwa rata-rata pengangkutan kayu oleh, kelompok truk A dan truk B adalah 784,09 m3/jam dengan efisiensi sebesar 53,22% dan 987,87 m3/jam dengan efisiensi sebesar 57,71%. Selain itu rata-rata muat bongkar adalah 12,82  m3m/menit dengan tingkat efisiensi sebesar 81,88% dan 73,73 m3m/menit dengan tingkat efisiensi sebesar 56,04%. Untuk meningkatkan produktivitas ddan efisiensi kegiatan pengangkutan, muat dan bongkar kayu dapat dilakukan melalui persiapan masing-masing kegiatan yang memugkinkan kegiatan tersebut dapat berjalan dengan baik.
STUDI KASUS PRODUKTIVITAS DAN BIAYA PENGELUARAN KAYU DENGAN SISTEM KABEL LAYANG KOLLER 300 Dulsalam Dulsalam; Djaban Tinambunan
Jurnal Penelitian Hasil Hutan Vol 15, No 8 (1998): Buletin Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20886/jphh.1998.15.8.449-462

Abstract

Studi produktivitas  dan biaya pengeluaran  kayu dengan sistem kabel  layang Koller  30C telah dilakukan di satu perusahaan  di Kalimantan Timur pada tahun 1994. Tujuannya adalah untuk mengetahui  informasi tentang produktivitas  dan biaya pengeluaran  kayu dengan sistem kabel layang Koller 300. Data spesifikasi Koller 300, dimensi kayu yang dikeluarkan,  konsumsi bahan bakar,  waktu kerja, dan  upah tenaga kerja dikumpulkan.  Hasil dari studi  ini adalah sebagai berikut    :1.Untuk persiapan,  operasi dan bongkar alat sistem kabel layang Koller 300 berturut-turut                    memerlukan waktu rata-rata 3,5 ;  3,89 dan 1,39 jam/jalur kabel.2.Diameter  kayu yang  dikeluarkan  berkisar antara 15 -  52 cm dengan rata-rata 29 cm dan                     panjang kayu berkisar antara 4,3  - 30,7 m dengan rata-rata 8,5 m.3.  Volume kayu yang  dikeluarkan  dari setiap jalur kabel  berkisar  antara  4,230 - 25,803                     M3/jalur  kabel  dengan  rata-rata  11,505 m3/jalur kabel  sedang  volume  kayu yang  dikeluarkan setiap rit berkisar  antara 0,101 - 1,521 m3/rit dengan rata-rata 0, 466 m3/rit.4. Produktivitas alat per jalur kabel berkisar antara 1,04 - 2,98 m3/jam dengan rata-rata 2,19 m3/jam sedang produktivitas  ekstraksi kayu berkisar antara  0,85  - 2, 19 m3/jam dengan rata-rata 1,70 m3/jam.5. Waktu kerja  tidak prduktif  berkisar  antara 0,24  -  3,81 jam/jalur   kabel  dengan  rata-rata 1,10 jam/jalur  kabel  (18%   terhadap  seluruh  waktu  kerja  alat).6. Biaya ekstraksi  kayu dengan Koller 300  berkisar antara Rp 22.387 - Rp 59.036/m3 dengan rata-rata Rp 33.322/m3.
KERUSAKAN TEGAKAN TINGGAL DAN PRODUKTIVITAS KERJA PADA TEBANG PENJARANGAN SECARA SELEKTIF; KASUS DI SATU PERUSAHAAN HTI DI SUMATERA SELATAN Sona Suhartana; Dulsalam Dulsalam
Jurnal Penelitian Hasil Hutan Vol 19, No 1 (2001): Buletin Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2560.556 KB) | DOI: 10.20886/jphh.2001.19.1.9-17

Abstract

The study was carried out at a timber estate company in South Sumatera in 1999. The aim of the study is to know the effect of selective thinning to residual stand damage and work productivity.Data collected were: thinned and damaged trees; residual stand; thinning time; diameter and length of thinned trees. The data was analyzed by tabulation.The results of the study showed that the average of residual stand damaged and the average of work productivity in selective thinning are respectively 6.22% and 56.167 m3/hour.Key words : Selective thinning, residual stand damaged, work productivity.
PENGARUH TEKNIK PENYADAPAN TERHADAP PRODUKSI GETAH AGATHIS DI BALI Ishak Sumantri Sumantri; Dulsalam Dulsalam; Machfudh Machfudh
Jurnal Penelitian Hasil Hutan Vol 4, No 4 (1987): Jurnal Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3680.239 KB) | DOI: 10.20886/jphh.1987.4.4.63-66

Abstract

There are many kinds  of Agathis sp.  having specific bark thickness  in Indonesia. For example, at Buleleng Forest District Bali, where the investigation  was carried out,  there are two groups of Agathis sp. The first  group is Agathis  sp. known  to have bark thickness greater than one cm, and the other group belongs to thin bark ( < 1cm). The bark thickness  of Agathis   sp. has a bearing on the resin yield. The resin itself  is always coagulated  quickly, there by requiring special treatment  to produce  optimal  resin yield. This investigation  is intended  to select the Agathis sp. producing optimum  resin yield  and to increase the resin output by applying  new tapping  technique. This study  reveals that:The resin yield of Agathis sp. in Bali was quite low. It ranges from 0.1 gram to 24.6  gram/tree/week  with approximately   3.8  gram/tree/week average.Agathis sp. with  thick bark give higher resin yield than those of thin bark.  The average resin yield of thick bark Agathis sp, was 6.3  gram/tree/week,  while it is only 1.3  gram/tree/week   for thin bark.The  V-shape tapping  method  give resin yield  approximately  80% higher than the reverse  V-shape.The application  of H2SO4 10% as stimulant did not give significant effect on the resin production. Based on the  average resin yield  data, however, the resin yield  was actually  increased approximately  26%   when the H2S04 were added compare  to  the control. 
PENGELUARAN KAYU DENGAN SISTEM KABEL LAYANG P3HH24 DI HUTAN TANAMAN KPH SUKABUMI Sukadaryati Sukadaryati; Dulsalam Dulsalam
Jurnal Penelitian Hasil Hutan Vol 24, No 2 (2006): Jurnal Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20886/jphh.2006.24.2.157-169

Abstract

Pengeluaran kayu di areal hutan tanaman yang berbukit-bukit dengan ukuran kayu  relatif lebih kecil perlu mendapat perhatian khusus. Pusat Penelitian dan Pengembangan Hasil Hutan telah membuat alat pengeluaran kayu dengan sistem kabel layang P3HH24 yang dirancang untuk mengeluarkan kayu pada areal berbukit. Tujuannya adalah untuk mendapatkan informasi teknis dan finansial penggunaan alat pengeluaran kayu tersebut. Hasil penelitian menunjukkan bahwa volume kayu yang dikeluarkan dan waktu kerja yang diperlukan berturut-turut berkisar dari 0,012 - 0,144 m3 (rata-rata 0,046 m3) dan 77,0 - 215,8 detik/rit (rata-rata 161,0 detik/rit). Produktivitas pengeluaran kayu bervariasi antara 1,665 - 8,018 m3/jam (rata-rata 3,562 m3/jam), dan biaya pengeluaran kayu adalah Rp 16.300/m3. Pengeluaran kayu dengan sistem kabel layang P3HH24 adalah layak secara ekonomi dengan Pay Back Periode = 1,39 tahun; NPV = Rp 75.175.045; IRR = 66,4%; dan B/C Ratio = 1,51.
STUDI KASUS PRODUKTIVITAS DAN BIAYA PENGELUARAN KAYU DENGAN SISTEM KABEL LAYANG KOLLER 300 Dulsalam Dulsalam; Djaban Tinambunan
Jurnal Penelitian Hasil Hutan Vol 15, No 8 (1998): Buletin Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (6584.008 KB) | DOI: 10.20886/jphh.1998.15.8.449-462

Abstract

Studi produktivitas  dan biaya pengeluaran  kayu dengan sistem kabel  layang Koller  30C telah dilakukan di satu perusahaan  di Kalimantan Timur pada tahun 1994. Tujuannya adalah untuk mengetahui  informasi tentang produktivitas  dan biaya pengeluaran  kayu dengan sistem kabel layang Koller 300. Data spesifikasi Koller 300, dimensi kayu yang dikeluarkan,  konsumsi bahan bakar,  waktu kerja, dan  upah tenaga kerja dikumpulkan.  Hasil dari studi  ini adalah sebagai berikut    :1.Untuk persiapan,  operasi dan bongkar alat sistem kabel layang Koller 300 berturut-turut                    memerlukan waktu rata-rata 3,5 ;  3,89 dan 1,39 jam/jalur kabel.2.Diameter  kayu yang  dikeluarkan  berkisar antara 15 -  52 cm dengan rata-rata 29 cm dan                     panjang kayu berkisar antara 4,3  - 30,7 m dengan rata-rata 8,5 m.3.  Volume kayu yang  dikeluarkan  dari setiap jalur kabel  berkisar  antara  4,230 - 25,803                     M3/jalur  kabel  dengan  rata-rata  11,505 m3/jalur kabel  sedang  volume  kayu yang  dikeluarkan setiap rit berkisar  antara 0,101 - 1,521 m3/rit dengan rata-rata 0, 466 m3/rit.4. Produktivitas alat per jalur kabel berkisar antara 1,04 - 2,98 m3/jam dengan rata-rata 2,19 m3/jam sedang produktivitas  ekstraksi kayu berkisar antara  0,85  - 2, 19 m3/jam dengan rata-rata 1,70 m3/jam.5. Waktu kerja  tidak prduktif  berkisar  antara 0,24  -  3,81 jam/jalur   kabel  dengan  rata-rata 1,10 jam/jalur  kabel  (18%   terhadap  seluruh  waktu  kerja  alat).6. Biaya ekstraksi  kayu dengan Koller 300  berkisar antara Rp 22.387 - Rp 59.036/m3 dengan rata-rata Rp 33.322/m3.
MANIPULASl POLA SADAP UNTUK MENINGKATKAN BASIL GETAH POHON AGATIS (AGATHIS SP.) Ishak Sumantri; Dulsalam Dulsalam
Jurnal Penelitian Hasil Hutan Vol 9, No 1 (1991): Jurnal Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1873.906 KB) | DOI: 10.20886/jphh.1991.9.1.1-4

Abstract

Thia ptJPB preaenta  the  re1ult1 •of  invatifOtion   on tapping  design1 manipulation   to increae   relin• yield  of  A,aihiaap. cawied  out  in  Wono10bo  Sub  Fore1t  Diatrict,  Purworejo  Fore1t  District,   Unit 11 Perum  Perhutani  Central  Java, in 1989. The objective   iB  to  (ind  out  the  tapping  design  that  can increaae retin  yield.  For  thit  purpo•,    the 1lanted and horizontal tappi1111 daigna  were applied. Data   obtained   were  analysed   by  uaing neated  desilnl   with  2 x 6 'x 4 (acto1'1. The retult•are as foUowa :                                                                                                                                                                                                                                                                   I.  An  awrage  reain yie1d of  .Agathia ap. in  Wonoaobo  Sub  Foreat District was 2.4 7 gram/tree/day   with  the ro111e  between O. 71 and 8.29  gram/tree/day.2.  The Average  rain   y1Bld1  of  Alatbia   1p. uting 1lanted and horizontal  tapping  design1 were 2.80 and 2.66 gram/tree/day, re1Pectively.3.  The  average rain   yield•  of  Agathia 1p. in February,  .March, April,  .May and  June  were  1.88,  2.62,  2.62,  2.66 and 2.69 1n1m/tree/day,   rapectively.                                                                                                                               .4.  The  average  rain   yields  of  Agathia  1p. at  the  fir•t,  second,  third  and  fourth   tappings  were. 2.36,  2.46,  2.63  and  2.66 gram/tree/day,   respectively.5.  The  rain  yields among  tapping  months  were different   significantly   while the resin yields either  between  tappfn6  deligna or  amorw  tapping  (requencie1   were  not  Bignificantly  different.   Compered   to  relin  yield  of  horizontal   tappin6  de.Wn. the rain  yield  of 1lanted ta~ping deBign wa• 16% higher.
PRODUKTIVITAS DAN BIAYA PENYARADAN KAYU DENGAN KERBAU DI JAMBI Dulsalam Dulsalam; Sukadaryati Sukadaryati
Jurnal Penelitian Hasil Hutan Vol 19, No 3 (2001): Buletin Penelitian Hasil Hutan
Publisher : Pusat Penelitian dan Pengembangan Hasil Hutan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20886/jphh.2001.19.3.147-164

Abstract

An investigation on productivity and log­skidding cost using buffalo (Bubalus bubalis) was carried out at the area of lnhutani V in Jambi in 1999. The objective is to get reliable information about such productivity and cost. Connected with this purpose, some related data as collected were i.e. volume of skidded log, skidding distance, skidding­working time, buffalo working time, feeding cost, operator cost, and equipment.Volumes of log which was skidded using buffalo ranged between 0.094 and 0.904 m3/tripwith an avverage of 0.484 m3/trip. Skidding distance using buffalo varied from 10 to 2­12 m with an average of 82 m. The working time varied from 11 to 83 minutes with an average of 30 minutes. The log skidding productivity ranged between 0.035 and 1.211 m3­hm/hour with an average of 0.338 m3­hmlhour. Log skidding costs using buffalo ranged between Rp 681 and Rp23.589 m3­hm with an average of Rp 4.375/m3­hm. It is suggested that volume of skidded log in each round trip and skidding distance be not more than 1 m3 and 250 m, respectively.