Sofyan M. Saleh
Dosen Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Published : 12 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 12 Documents
Search

ANALISIS KELAYAKAN EKONOMI PEMBANGUNAN JALAN KRUENG MANE - BUKETRATA DENGAN CONSUMER SURPLUS Amirullah Amirullah; Sofyan M. Saleh; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The national road in North Aceh District is very buzy, especially roads that pass through the Vital Project of Lhokseumawe and its surrounding areas are now called Special Economic Zones (SEZ) Lhokseumawe. Because it's built the way evasion from Krueng Mane to Buketrata along 32 Km, but this road  is not perfect yet, especially at the STA 14+750 to STA 21+400. The current reasearch aims to determine the value of time and the Vehicle Operating Costs (VOC); and economic feasibility in Benefit Cost Ratio (BCR), Net Present Value (NPV), and Economic Internal Rate of Return (EIRR) aspects. This study uses a productivity method to calculate the value of time, and the Pacific Consultant International method for calculating the VOC; and Bina Marga method was used to determine the economic feasibility in BCR, NPV, and EIRR aspects. The results of this research shown that   daily traffic volume of the annual average (LHRT) on alternative road obtained 9,583 vehicles /day in 2017; the difference in total time value was obtained Rp87,788.- /vehicle and the difference BOK is Rp3,289.- /vehicle; and economic feasibility of the alternative road construction in North Aceh Regency was obtained in 2026. EIRR’s value obtained was at a discount rate of 13.51%, this indicates that the alternative road construction was very feasible to develop with bank lending rates up to 13.51%.Abstract: The national road in North Aceh District is very buzy, especially roads that pass through the Vital Project of Lhokseumawe and its surrounding areas are now called Special Economic Zones (SEZ) Lhokseumawe. Because it's built the way evasion from Krueng Mane to Buketrata along 32 Km, but this road  is not perfect yet, especially at the STA 14+750 to STA 21+400. The current reasearch aims to determine the value of time and the Vehicle Operating Costs (VOC); and economic feasibility in Benefit Cost Ratio (BCR), Net Present Value (NPV), and Economic Internal Rate of Return (EIRR) aspects. This study uses a productivity method to calculate the value of time, and the Pacific Consultant International method for calculating the VOC; and Bina Marga method was used to determine the economic feasibility in BCR, NPV, and EIRR aspects. The results of this research shown that   daily traffic volume of the annual average (LHRT) on alternative road obtained 9,583 vehicles /day in 2017; the difference in total time value was obtained Rp87,788.- /vehicle and the difference BOK is Rp3,289.- /vehicle; and economic feasibility of the alternative road construction in North Aceh Regency was obtained in 2026. EIRR’s value obtained was at a discount rate of 13.51%, this indicates that the alternative road construction was very feasible to develop with bank lending rates up to 13.51%.
STUDI DAMPAK LALU LINTAS KAWASAN AKIBAT PEMBANGUNAN JALAN LAYANG (FLYOVER) SIMPANG SURABAYA DAN JALAN LINTAS BAWAH (UNDERPASS) KUTA ALAM KOTA BANDA ACEH Dedek Ariansyah; Sugiarto Sugiarto; Sofyan M. Saleh
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Increased vehicle ownership rates in Banda Aceh cause transportation problems, namely congestion. One point with a fairly high level of congestion is the area Simpang Surabaya and Simpang Kuta Alam. The capacity of roads that began to not be able to serve the flow of vehicles through it and due to limited land in the two intersections, the Government of Aceh decided to build a Flyover at Simpang Surabaya and build a Underpass at Simpang Kuta Alam. This development caused congestion and increased loading in several roads around the development area. The purpose of this research is to analyze the impact of traffic caused by the construction of Flyover and Underpass during construction period. This study uses the method of MKJI. The location of this research lies in the road segment that is imposed due to the development of Flyover and Underpass. The data collected are local road geometric, volume and speed data. Volume of peak hours and average space velocity ie On Jalan TM Hasan for 1,951 smps / hour and 30.75 km / h, Jalan T. Hasan Dek for 2,668 smps / hour and 22.50 km / h, and Jalan T. Iskandar for 1,243 smp / hour and 31,16 km / hour. Abstrak: Tingkat kepemilikan kendaraan yang terus bertambah di Kota Banda Aceh menyebabkan permasalahan transportasi yaitu kemacetan. Salah satu titik dengan tingkat kemacetan yang cukup tinggi adalah kawasan Simpang Surabaya dan Simpang Kuta Alam. Kapasitas jalan yang mulai tidak mampu melayani arus kendaraan yang melaluinya dan karena keterbatasan lahan di kedua simpang tersebut, maka Pemerintah Aceh memutuskan untuk membangun Flyover pada Simpang Surabaya dan membangun Underpass pada Simpang Kuta Alam. Pembangunan ini menimbulkan kemacetan dan meningkatnya pembebanan di beberapa ruas jalan di sekitaran kawasan pembangunan. Tujuan dari penelitian ini adalah untuk menganalisa dampak lalu lintas yang ditimbulkan akibat pembangunan Flyover dan Underpass pada masa konstruksi. Studi ini menggunakan metode dari MKJI. Lokasi penelitian ini terletak pada ruas jalan yang mengalami pembebanan akibat pembangunan Flyover dan Underpass. Data yang dikumpulkan adalah data geometrik jalan, volume dan kecepatan setempat. Volume jam puncak dan kecepatan rata-rata ruang yaitu Pada Jalan T. M. Hasan sebesar 1.951 smp/jam dan 30,75 km/jam, Jalan T. Hasan Dek sebesar 2.668 smp/jam dan 22,50 km/jam, dan Jalan T. Iskandar sebesar 1.243 smp/jam da 31,16 km/jam.
EVALUASI KECELAKAAN LALU LINTAS DITINJAU DARI ASPEK JARAK PANDANG GEOMETRIK JALAN DAN FASILITAS PERLENGKAPAN JALAN TERHADAP SIMPANG SIBREH Teuku Aswardi; Sofyan M. Saleh; Muhammad Isya
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Inadequate road infrastructure, can cause various problems, especially in the case of road safety. The road safety assessment aims to improve services and anticipate road accidents. Based on data from P2JN Kem PU-PR, there are 34,567 units of vehicles passing by on the road (Lambaro Sta. 0 + 000 - Sta. 77 + 000) every month.Accident data information from the police, there are some most frequent locations of accidents on this road.Recorded in 2016 from January to December, there were 237 deaths (MD), 52 people seriously injured (LB) 35 people and minor injuries (LR) of 453 people .For the year 2017 from January to March there are 24 incidents with deaths (MD) 4 people, seriously injured (LB) 0 people and minor injuries (LR) 57 people. This study was conducted on 1 points of observation that was categorized as accident prone location that is Observation point in front of Sibreh Community Health Centers  Sta. 15 + 050. This study was conducted to analyze the stopping sight distance and evaluate the geometric condition and condition of existing infrastructure facilities at  point of observation. The method used is by doing direct observation in the area for 3 days, Sunday (weekend), Monday and Wednesday (weekdays). The results showed that stopping sight distance (JPH) at  point of observation can be categorized as feasible. It is showed by JPH obtained at Point Observation of 56,65 m. Based on the survey results, the geometric condition at observation point can be categorized as feasible, while the condition of the streets equipment facility is categorized as unsuitable for observation point. The assessment of traffic accident evaluation is suggested to the parties involved in Aceh Province to be more concerned about the conditions and factors that can affect the occurrence of accidents to reduce the potential for accidents driving.Abstrak: Sarana prasarana jalan yang tidak memadai, dapat menyebabkan berbagai macam masalah terutama dalam hal keselamatan di jalan raya. Kajian tentang keselamatan jalan bertujuan untuk meningkatkan pelayanan dan mengantisipasi terhadap terjadinya kecelakaan di jalan. Berdasarkan data dari P2JN Kem PU-PR, ada 34.567 unit kendaraan yang berlalu lalang di ruas jalan (Lambaro Sta. 0 + 000 – Sta. 77 + 000) setiap bulannya. Informasi data kecelakaan dari kepolisian terdapat beberapa lokasi yang sering terjadi kecelakaan pada jalan ini.Tercatat dalam tahun 2016 dari bulan januari sampai dengan Desember terdapat 237 jumlah kejadian dengan jumlah meninggal dunia (MD) 52 jiwa, luka berat (LB) 35 jiwa dan luka ringan (LR) 453 jiwa. Untuk tahun 2017 dari bulan Januari sampai bulan Maret terdapat 24 kejadian dengan jumlah meninggal dunia (MD) 4 jiwa, luka berat (LB) 0 jiwa dan luka ringan (LR) 57 jiwa. Penelitian dilakukan pada Titik Pengamatan Depan Puskesmas Sibreh Sta. 15 + 050. Penelitian ini dilakukan untuk menganalisis jarak pandang henti dan jarak pandang menyiap serta mengevaluasi kondisi geometrik dan kondisi existing fasilitas infrastruktur pada titik pengamatan. Metode yang digunakan yaitu dengan melakukan pengamatan langsung di lapangan selama 3 hari, yaitu hari minggu (hari libur) serta hari senin dan rabu (hari kerja). Hasil penelitian menunjukkan, jarak pandang henti (JPH) dapat dikategorikan laik. Hal ini ditunjukkan dengan JPH yang diperoleh pada Titik Pengamatan  sebesar 56,65 m. Dari hasil penelitian ini diketahui kondisi geometrik jalan pada  titik pengamatan dapat dikategorikan laik, sedangkan kondisi fasilitas perlengkapan jalan dikategorikan tidak laik. Kajian evaluasi kecelakaan lalulintas ini disarankan kepada pihak-pihak yang terlibat di Provinsi Aceh agar dapat lebih memperhatikan lagi kondisi-kondisi dan faktor-faktor yang dapat berpengaruh terjadinya kecelakaan untuk mengurangi potensi terjadinya kecelakaan berkendaraan.
KAJIAN MANFAAT PEMBANGUNAN JALAN LINGKAR KOTA LHOKSEUMAWE (STUDI KASUS JALAN LINGKAR KOTA LHOKSEUMAWE) Rijalul Qadri; Muhammad Isya; Sofyan M. Saleh
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The city of Lhokseumawe is the administrative city of the central government and all economic, political, social and cultural activities. Along with the existence of the existing road that is the road of freedom of the west with a road length of 5 km wide road of 7 m average consisting of 2 lane 2 direction (2/2 UD) causing congestion, traffic accidents and increasing travel time. To anticipate the problem in 2012 the government of Lhokseumawe City began to budget for the construction of Lhokseumawe City Ring Road starting from Simpang Loskala - Simpang Lestari with a total length of 7.6 km road, which has been built currently 3 km to Gampong Ujong Blang is still In the measurement and land acquisition stage. The average road width of 14 m consists of 4 lane 2 lanes (4/2 D) is a new access road to Lhokseumawe City. The purpose of this study was to calculate VOC and time savings for existing and alternative road routes, to know respondent perceptions and to evaluate economic feasibility based on BCR, NPV and EIRR. The results of this study indicate that the average annual traffic volume (LHRT) on alternative roads is 4.279 vehicle/day in 2017; The difference in total time value obtained by IDR 189,877,-/ vehicle and VOC difference is IDR 3,289 / vehicle; And economic feasibility of Lhokseumawe Ring Road development is obtained in 2036. The EIRR value obtained is at the discount rate of 17.27%, it indicates that the development of Ring Road / alternative is very feasible to be implemented with bank loan interest rate up to 17.27%.Abstrak: Kota Lhokseumawe merupakan kota administratif pusat pemerintahan dan segala kegiatan ekonomi, politik, sosial dan budaya. Seiring padatnya jalan eksisting yaitu jalan merdeka barat dengan panjang jalan 5 km lebar badan jalan rata-rata 7 m yang terdiri dari 2 lajur 2 arah (2/2 UD) yang mengakibatkan kemacetan, kecelakaan lalulintas dan bertambahnya waktu tempuh. Untuk mengantisipasi permasalahan tersebut pada tahun 2012 pemerintah Kota Lhokseumawe mulai menganggarkan dana untuk Pembangunan Jalan Lingkar Kota Lhokseumawe yang dimulai dari Simpang Loskala – Simpang Lestari dengan total panjang jalan 7,6 km, yang telah dibangun saat ini 3 km sampai dengan Gampong Ujong Blang selanjutnya masih dalam tahapan pengukuran dan pembebasan lahan. Lebar badan jalan rata-rata 14 m yang terdiri dari 4 lajur 2 jalur (4/2 D) merupakan jalan akses baru menuju Kota Lhokseumawe. Tujuan Penelitian ini untuk menghitung BOK dan penghematan nilai waktu untuk rute jalan existing dan jalan alternatif, mengetahui persepsi responden serta mengevaluasi kelayakan ekonomi berdasarkan BCR, NPV dan EIRR. Hasil penelitian ini menunjukkan bahwa Volume lalu lintas harian rata-rata tahunan (LHRT) pada jalan alternatif didapat 4.279 kend/hari pada tahun 2017; Selisih nilai waktu total yang diperoleh sebesar Rp 189.877,-/kendaraan dan selisih BOK adalah Rp 3.289,- /kendaraan; dan Kelayakan ekonomi pembangunan jalan Lingkar Kota Lhokseumawe didapat pada tahun 2036. Nilai EIRR yang diperoleh yaitu pada discount rate 17,27%, ini menunjukkan bahwa pembangunan jalan lingkar/alternatif sangat layak untuk dilaksanakan dengan suku bunga pinjaman bank sampai dengan 17,27%.
ANALISIS KINERJA JALAN DAN KECEPATAN PERJALANAN KENDARAAN PADA JALAN POCUT BAREN KOTA BANDA ACEH Sofi Marlinda; Sofyan M. Saleh; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The region of Pocut Baren Street in Banda Aceh has varied land use along the street consisting of office, residential, shopping and school areas. The increase in traffic volume on Pocut Baren Street causes traffic congestion along the street and finally lead to decrease in vehicle speed which influence the increase in fuel consumption level. This study aimed to evaluate the road performance and journey speed of vehicle on Pocut Baren Street during peak hours. Data observation of traffic volume conducted to calculate the total of traffic that passed through the observational street by using the Indonesian Highway Capacity Manual (MKJI) 1997.  Data observation of traffic speeds were calculated by using floating car method that would be obtained the total of journey speed. From the result of the calculation and evaluation obtained the road performance at peak volume occurred in Monday morning from 7:00 to 08:00 am. It was obtained Q- value of 994.20 smp/ hour with a degree of saturation (DS) of 0.85 that was in category-D of service level that was unstable current, decreased speed. Average maximum journey speed was 59.7015 km/hour and average minimum speed was 25.0696 km /hour.Abstrak: Kawasan Jalan Pocut Baren kota Banda Aceh memiliki tata guna lahan yang berbeda-beda di sepanjang jalan yang terdiri dari kawasan perkantoran, pemukiman, pertokoan dan sekolah. Peningkatan volume lalu lintas di Jalan Pocut Baren menyebabkan terjadinya kemacetan di sepanjang jalan dan pada akhirnya menimbulkan penurunan kecepatan kendaraan yang berpengaruh pada tingkat konsumsi BBM yang meningkat. Penelitian ini bertujuan untuk mengevaluasi kinerja jalan dan kecepatan perjalanan kendaraan di jalan Pocut Baren pada saat jam puncak. Pengamatan data volume lalu lintas dilakukan untuk menghitung jumlah lalu lintas yang melewati jalan tinjauan dengan menggunakan metode Manual Kapasitas Jalan Indonesia (MKJI) 1997. Pengamatan data kecepatan lalu lintas dilakukan dengan menggunakan metode kendaran contoh (floating car method) yang nantinya akan diperoleh kecepatan perjalanan (journey speed) total. Hasil perhitungan dan evaluasi diperoleh kinerja jalan pada volume puncak terjadi pada hari senin pagi arah menuju kota jam 07.00-08.00 wib. diperoleh nilai Q sebesar 994,20 smp/jam dengan derajat kejenuhan (DS) sebesar 0,85 berada di tingkat pelayanan jalan kategori D yaitu arus tidak stabil, kecepatan menurun. Kecepatan perjalanan rata-rata maksimum sebesar 59,7015 km/jam dan kecepatan rata-rata minimum sebesar  25,0696 km/jam.
PENGARUH KENYAMANAN TERHADAP PENERAPAN KONSEP WALKABLE DI KAWASAN PUSAT KOTA LAMA Yenni Hafnizar; Izziah Izziah; Sofyan M. Saleh
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Banda Aceh city is a city that experienced growth so fast after the tsunami. This has implications for the greatest urbanization flows. Along with the increasing urbanization the impression of a comfortable city is less pronounced. Limited ability to move in urban areas and the fulfillment of quality for pedestrian facilities is also very minimal. But Banda Aceh has a huge obsession in building a quality city one of which is a sociable city. Walkable is one of the important concepts in urban design that is community friendly and sustainable city. Walkable is also a view that is based on the desire to create an environment that provides comfort and convenience for pedestrians. This concept can also assess how friendly an area is for pedestrians. According to Jan Ghel, walkable is a term used to describe and measure the connectivity and quality of pedestrian paths. Such measurements may also be made through assessments of the infrastructure available to pedestrians. The purpose of this study is to analyze the quality of pedestrian is more walkable so as to support the existence of the Old Town in Banda Aceh more comfortable (friendly). Another goal to be achieved is to formulate the application of the concept of walkable and analyze the influence or relationship resulting from the application walkable concept towards the comfort of the pedestrian track. The method used in this research is descriptive with mixed methods approach, and survey and interview technique. Whereas data processing is done quantitatively through the assessment analysis using likert scale measurement scale. Furthermore, T test analysis is done to find out how the level of relationship between the application of the concept of walkabel to the comfort of the pedestrian path. The results showed that the application of walkability concept will greatly affect the comfort of the pedestrian path. Some things that need to be improved on the pedestrian path to attract pedestrians, ie eliminating non pedestrian activities on the sidewalk, increasing the number and quality of supporting support and aesthetic value of the sidewalk and improvements on broken sidewalks. The role of the Government will greatly help the effort to create a pedestrian environment that convenient by adding pedestrian support equipment and adding aesthetic value.Abstrak: Kota Banda Aceh merupakan kota yang mengalami pertumbuhan yang begitu cepat pasca tsunami. Hal ini berimplikasi terhadap timbulnya arus urbanisasi paling besar. Seiring dengan meningkatnya urbanisasi kesan kota yang nyaman sudah kurang terasa. Terbatasnya kemampuan bergerak di daerah perkotaan dan pemenuhan kualitas untuk fasilitas pejalan kaki ini juga sangat minim. Namun Banda Aceh memiliki obsesi besar dalam membangun kota yang berkualitas salah satunya adalah kota yang ramah terhadap masyarakat.Walkable adalah salah satu konsep penting dalam desain perkotaan yang ramah masyarakat dan kota berkelanjutan. Walkable juga merupakan suatu pandangan yang didasari pada keinginan untuk menciptakan suatu lingkungan yang memberikan kenyaman dan kemudahan bagi pejalan kaki. Konsep ini juga dapat menilai seberapa ramah suatu daerah untuk pejalan kaki. Menurut Jan Ghel,  walkable adalah istilah yang digunakan untuk menjelaskan dan mengukur konektifitas serta kualitas jalur pejalan kaki. Pengukuran tersebut juga dapat dilakukan melalui penilaian terhadap infrastuktur yang tersedia bagi pejalan kaki. Tujuan dari penelitian ini adalah untuk menganalisa kualitas pedestrian yang lebih walkable sehingga mampu mendukung keberadaan kawasan Kota Lama di Banda Aceh yang lebih nyaman (friendly).Tujuan lain yang ingin dicapai adalah untuk merumuskan bentuk penerapan konsep walkable serta menganalisa pengaruh atau hubungan yang ditimbulkan dari penerapan konsep walkable terhadap kenyamann jalur pedestrian. Metode yang digunakan dalam penelitian ini adalah deskriptif dengan pendekatan penelitian kombinasi (mixed methods),serta teknik survei dan wawancara.Sedangkan pengolahan data dilakukan secara kuantitatif melalui analisis penilaian yang menggunakan skala pengukuran likert scale. Selanjutnya dilakukan analisis Uji T untuk mengetahui bagaimana tingkatan hubungan antara penerapan konsep walkabel  terhadap kenyamanan jalur pejalan kaki. Hasil penelitian menunjukkan bahwa penerapan konsep walkability akan sangat berpengaruh terhadap kenyamanan jalur pedestrian. Beberapa hal yang perlu ditingkatkan pada jalur pedestrian untuk menarik minat pejalan kaki, yakni menghilangkan aktivitas non pedestrian di trotoar, peningkatan jumlah dan kualitas kelengkapan pendukung dan nilai estetika trotoar dan pembenahan pada trotoar yang rusak.Peran Pemerintah akan sangat membantu upaya untuk menciptakan lingkungan pedestrian yang nyaman dengan menambahkan kelengkapan pendukung pedestrian  dan menambah nilai estetika .
PENINGKATAN JALAN BENER MERIAH – SP. KRUENG GEUKUEH DITINJAU DARI EKONOMI TRANSPORTASI Irwin Irwin; Muhammad Isya; Sofyan M. Saleh
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract : National and Province road condition in middle area generally is located in mountained which there are many bend, hills, vertically down. As well as Takengon – Bireun road condition which located in mountain area and usually there is a Landslide disaster, its because the poor system of geometric which impact to traveling time and comfortability of road user. For anticipate this problem, on 2008 Aceh Government start to budgeting for Bener Meriah – Sp. Krueng Geukueh Road improvement which is ex road of PT. KKA and its status is changed to Road Province with ministry of Home Affairs and  regional autonomy decision number : 55 Date 22nd December 2000 about list of provine road in Proince Aceh with named road are Sp. Kebayakan – Sp. Krueng Geukueh. Road sp. Kebayakan - sp. Krueng Geukueh Loated in Aceh Tengah, District Bener Meriah and District Aceh Utara with road length 90 km. Purpose of this study is to determine the Vehicle Operatioanl Cost (VOC), Saving Time Value and evaluating economic feasibility based on Benefit Cost Ratio (BCR), Net Present Value (NPV), Economic Internal Rate of Return (EIRR) and Sensitivity analysis. From this research obtained that difference of  Average Passenger Car Time Value is Rp130,437.-/vehicle,  bus Rp860,451.-/vehicle, truck Rp90,991.-/vehicle dan Difference on total average operational cost of passenger car Rp474,-/vehicle/km, bus Rp2,162.-/vehicle/km, truck Rp1,476.-/vehicle/km. feasibility economic of Bener Meriah – Sp. Krueng Geukueh road improvement on pada 2027 obtained EIRR value on discount rate  18.97%, it show that improvement of Bener Meriah – Sp. Krueng Geukueh road is very feasible to be implemented with bank lending rates up to 18.97% and also sensitive to sensitivity analysis with shift of cost and benefit on sensitivity research that cost increased 10% and benefit decreased 10%. Abstrak : Kondisi jalan nasional dan jalan provinsi di lintas tengah pada umumnya terletak pada daerah pegunungan yang banyak terdapat tikungan, tanjakan dan turunan. Demikian juga halnya dengan ruas jalan Nasional  Takengon - Bireuen yang terletak pada daerah pegunungan dan sering terjandi bencana alam longsor,  kurang baik sistem geometrik jalan berpengaruh   terhadap waktu tempuh dan kenyamanan pengguna jalan. Untuk mengantisipasi permasalahan tersebut, tahun 2008 pemerintah Aceh mulai menganggarkan dana untuk peningkatan jalan Bener Meriah – Sp. Krueng Geukueh yang merupakan jalan eks. PT. KKA (Kertas Kraft Aceh) yang berubah status untuk jalan propinsi dengan keputusan menteri dalam negeri dan otonomi daerah nomor : 55 tahun 2000 tanggal 22 Desember 2000 tentang daftar jalan propinsi di wilayah propinsi daerah istimewa Aceh dengan nama ruas jalan Sp. Kebayakan – Sp. Krueng Geukueh. Ruas jalan sp. Kebayakan – sp. Krueng Geukueh terletak di Kabupaten Aceh Tengah, kabupaten Bener Meriah dan  Kabupaten Aceh Utara dengan panjang  jalan 90 km. Tujuan penelitian ini untuk mengetahui Biaya Operasional Kendaraan (BOK), penghematan nilai waktu dan mengevaluasi kelayakan ekonomi berdasarkan Benefit Cost Ratio (BCR), Net Present Value (NPV), Economic Internal Rate of Return (EIRR) dan Analisis Sensitivitas. Hasil penelitian diperoleh selisih nilai waktu rata rata mobil penumpang Rp130.437,-,  bus Rp860.451,-, truk Rp90.991,- dan Selisih total rata rata biaya operasional kendaraan mobil penumpang 474,-/kend/km, bus Rp2.162,-/kend/km, truk Rp1.476,-/kend/km. Kelayakan ekonomi peningkatan jalan Bener Meriah – Sp. Krueng Geukueh pada tahun 2027 diperoleh  Nilai EIRR  pada discount rate  18,97%, ini menunjukkan bahwa peningkatan jalan Bener Meriah – Sp. Krueng Geukueh sangat layak untuk dilaksanakan dengan suku bunga pinjaman bank sampai dengan 18,97% dan peka terhadap analisa sensitivitas dengan perubahan  biaya dan manfaat pada sensitivitas riset dengan biaya  naik 10%,  manfaat turun 10%.
ANALISIS KEMACETAN LALU – LINTAS PADA KAWASAN PENDIDIKAN (STUDI KAUS JALAN POCUT BAREN KOTA BANDA ACEH) Sukma Meutia; Sofyan M. Saleh; Azmeri Azmeri
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Jalan Pocut Baren road section is one part of the road in the center of Banda Aceh city with mixed land use, which consists of trading areas, offices, settlements and education areas. The existence of the education area in Jalan Pocut Baren seems to be greatly affect the increasing of traffic volume. This is indicated by the density of activities that occur during and after school hours. In addition, the use of parking lots which is not provided by the owners of school buildings leads to many vehicles parked on the shoulder of the road that resulted to the traffic jam. This research aims to analyze the traffic jam that occurred in education area at Jalan Pocut Baren segment.  The study conducted for 3 days i.e. Monday July 17th, 2017, Tuesday July 18th, 2017 and Thursdays July 20th, 2017 at morning peak hour, afternoon and evening starting at hour 07:00am to 09:00am, 12:00pm to 2:00pm and 3:00pm to 4:00pm. The road capacity calculated by using Indonesia Road Manual Capacity (Manual Kapasitas Jalan Indonesia/MKJI) 1997. The result showed that the influence of education area toward the performance of Jalan Pocut Baren reach the peak volume on Monday morning where the traffic volume (Q) = 1958 smp/hour, side friction class (SFC) = H (High), capacity (C) = 2349 smp/hour for total two – way, degree of saturation (DS) = 0,83 which describes the service level of Jalan Pocut Baren belongs to category D (close to unstable currents).Abstrak: Ruas Jalan Pocut Baren merupakan salah satu jalan di pusat Kota Banda Aceh dengan tata guna - lahan campuran, yang terdiri dari kawasan perdagangan, perkantoran, permukiman dan kawasan pendidikan. Keberadaan kawasan pendidikan di ruas Jalan Pocut Baren dirasakan sangat mempengaruhi meningkatnya volume lalu – lintas.Hal ini ditunjukkan dengan padatnya aktivitas yang terjadi pada saat pergi dan pulang sekolah.Selain itu juga penggunaan lahan parkir yang tidak disediakan oleh pemilik bangunan sekolah, sehingga banyak kendaraan yang parkir di bahu jalan sehingga mengakibatkan kemacetan.Tujuan dari penelitian ini adalah untuk menganalisis kemacetan lalu lintas yang terjadi pada kawasan pendidikan disepanjang ruas Jalan Pocut Baren.Penelitian ini dilakukan selama 3 hari yaitu Senin 17 Juli 2017, Selasa 18 Juli 2017 dan Kamis 20 Juli 2017 diambil pada jam puncak pagi, siang dan sore hari dimulai dari jam 07.00 – 09.00, 12.00 – 14.00 dan 15.00 – 16.00 WIB. Perhitungan kapasitas jalan ditinjau dengan menggunakan Metode Manual Kapasitas Jalan Indonesia (MKJI) 1997.Hasil penelitian menunjukkan bahwa pengaruh kawasan pendidikan terhadap ruas Jalan Pocut Baren terjadi volume puncak pada hari Senin pagi, dimana volume lalu lintas (Q) = 1958 smp/jam, nilai kelas hambatan samping (SCF) = H (tinggi), kapasitas (C) = 2349 smp/jam, dengan nilai derajat kejenuhan (DS) = 0,83 yang menggambarkan tingkat pelayanan jalan termasuk kategori D (mendekati arus tidak stabil).
INVENTARISASI DATA KONDISI JALAN KE DALAM APLIKASI SISTEM INFORMASI GEOGRAFIS (SIG) Purnawati Purnawati; Renni Anggraini; Sofyan M. Saleh
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The economic growth of a region is determined by the condition of the road network. Improved road network in Langsa is intended to increase the accessibility of the region so as to develop according to the planned landing. Langsa has an activity center located in Langsa Kota district and four production centers, located in LangsaTimur district, Langsa Lama district,LangsaBaro district, and LangsaBarat district. This study aims to develop an application that can provide ease of road condition information by using the application program Geographic Information System (GIS). Road condition surveys carried out by observing the types and amount of damage on road surface would result in Survey Distress Index (SDI) values. The Survey of Road Surface Flatness gives Road Condition Index (RCI) valueswhich is used for calculating the International Roughness Index (IRI) values. The IRI value and the SDI value of is used to determine the condition of the road (good condition or medium condition). The results obtained Road Condition value is 95% in good condition forLangsa Timur district, 73% for LangsaBarodistrict in good condition and 89%Langsa Lamadistrict in medium condition, and Langsa Barat district is 100% in good condition. The use of GIS applications such as road condition data inventory produce a picture of road conditions were poured into a map of the road network roads were reviewed.Abstrak: Pertumbuhan ekonomi suatu wilayah sangat ditentukan oleh kondisi jaringan jalan. Peningkatan jaringan jalan di Kota Langsa dimaksudkan untuk meningkatkan aksesibilitas suatu kawasan sehingga mampu berkembang sesuai arahan yang direncanakan. Kota Langsa memiliki satu pusat kegiatan yang terletak di Kecamatan Langsa Kota dan empat pusat produksi yang terletak di Kecamatan Langsa Timur, Kecamatan Langsa Lama, Kecamatan Langsa Baro dan Kecamatan Langsa Barat. Penelitian ini bertujuan untuk membangun suatu aplikasi yang bisa memberikan kemudahan informasi kondisi jalan dengan menggunakan aplikasi program Sistem Informasi Geografis (SIG). Survei kondisi jalan dilakukan dengan mengamati jenis-jenis dan jumlah kerusakan permukaan jalan akan menghasilkan nilai Survey Distress Index (SDI). Survei Kerataan Permukaan Jalan menghasilkan Nilai Road Condition Index (RCI) yang digunakan untuk menghitung nilai International Roughness Index (IRI).  Nilai IRI dan Nilai SDI digunakan untuk menentukan kondisi jalan (kondisi baik atau kondisi sedang). Hasil penelitian diperoleh Nilai Kondisi Jalan adalah 95% dalam kondisi baik untuk Kecamatan Langsa Timur, Langsa Baro 73% dalam kondisi  baik dan Langsa Lama 89% dalam kondisi sedang, dan Kecamatan Langsa Barat 100% dalam keadaan baik.  Penggunaan Aplikasi SIG berupa inventarisasi data kondisi jalan menghasilkan gambaran kondisi jalan yang dituangkan ke dalam peta jaringan jalan pada ruas jalan yang ditinjau.
KELAYAKAN EKONOMI JALAN BATAS KOTA TAPAKTUAN – BAKONGAN DITINJAU DARI SEGI CONSUMER SURPLUS Khuzaifah Khuzaifah; Sofyan M. Saleh; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Roads border of Tapaktuan-Bakongan municipality in the province of Aceh  is the only road to North Sumatra Province on the South Western main line. This road is in the mountainous area of the existing road with a width of only 3.5-4.5 meters tall, narrow and winding up with a small radius. Road construction along the 3.5 km. on site km. s/d 460+200 km. 463+700 with the most critical segment of the road is handled by construction Cantilever on 460+900 KM up to 462+650 KM along the 1.75 km. The purpose of this research was to examine the feasibility of economic development path with the method of Consumer Surplus, and cost-saving benefits of Operational Vehicles Cost (VOC), with the Pacific Consultant International (PCI) method, and time value uses productivity method.  Analysis of economic feasibility of the Bina Marga is done by means of Benefit Cost Ratio (BCR), Net. Present Value (NPV), Economic Internal Rate of Return (EIRR) and Sensitivity Analysis. The results of research on prediction of traffic flow with the growth rate of the average vehicle is 1.49%. per year. The benefits gained in terms of consumer surplus toward the construction of the new roads are in a form of the savings of VOC, passenger cars is Rp870/veh/km, bus is Rp1.149/veh/km and trucks is Rp2,749/veh/km. Savings time value obtained on new roads, vehicle passenger car Rp11,016/kend, vehicle bus, Rp73,439/kend, vehicle truck Rp7,344/veh. An analysis of the Economic Feasibility of the 25th year since the road opened the economic feasibility of the standards for all the discount rates. At a discount rate of 10%, BCR value is 1.93, NPV value is Rp75,172,122,823.- on the discount rate of 12% the value of BCR is 1.51, the value NPV is Rp39,298,870,060.- and at a discount rate of 15% of the value, the BCR value is 1.09, the value of NPV is Rp 6,540,471,105.-. and with the value of the EIRR obtained at discount rate 15.89%, this indicates that the construction of roads of Tapaktuan – Bakongan is feasible to be implemented.Abstrak: Ruas jalan Batas Kota Tapaktuan-Bakongan yang terletak di Provinsi Aceh merupakan satu-satunya jalan menuju Provinsi Sumatera Utara pada lintas Barat Selatan. Ruas jalan ini berada pada daerah pegunungan dengan lebar badan jalan eksisting hanya 3,5-4,5 meter, sempit dan berliku dengan radius kecil. Pembangunan jalan sepanjang 3,5 km. di lokasi KM. 460+200 s/d KM. 463+700 dengan segmen yang paling kritis dari ruas jalan tersebut ditangani dengan konstruksi Cantilever pada KM 460+900 sampai dengan KM 462+650 sepanjang 1,75 km. Tujuan dari penelitian ini untuk mengkaji kelayakan ekonomi pembangunan jalan dengan metoda Consumer Surplus, manfaat penghematan Biaya Operasional Kendaraan (BOK), dengan metode Pacific Consultant International (PCI), dan Nilai Waktu menggunakan metode Produktifitas. Analisis kelayakan ekonomi dengan menggunakan metode Bina Marga berdasarkan Benefit Cost Ratio (BCR), Net Present Value (NPV), Economic Internal Rate of Return (EIRR) dan Analisis Sensitivitas. Hasil penelitian terhadap prediksi arus lalu lintas dengan tingkat pertumbuhan kendaraan rata-rata adalah 1,49%. per tahun. Manfaat yang diperoleh dari segi consumer surplus terhadap jalan baru berupa penghematan BOK, mobil penumpang sebesar  Rp 870 /kend/km, kenderaan bus sebesar Rp. 1.149 /kend/km dan truk sebesar Rp. 2.749 /kend/km. Penghematan nilai waktu yang diperoleh pada jalan baru, kendaraan mobil penumpang Rp. 11.016 /kend, kendaraan bus, Rp. 73.439 /kend, kendaraan truk Rp.7.344 /kend. Analisis terhadap Kelayakan Ekonomi tahun ke 25 sejak jalan dibuka memenuhi standar kelayakan ekonomi untuk semua discount rate. Pada discount rate 10% nilai BCR 1,93 nilai NPV Rp. 75.172.122.823,- pada discount rate 12% nilai BCR 1,51 nilai NPV Rp. 39.298.870.060,- dan pada discount rate 15% nilai BCR 1,09 nilai NPV Rp. 6.540471.105,-. dan dengan Nilai EIRR diperoleh pada discount rate 15,89%, ini menunjukkan bahwa pembangunan jalan Batas Kota Tapaktuan–Bakongan layak  untuk dilaksanakan.