Claim Missing Document
Check
Articles

PERFORMANCE OF ASPHALT CONCRETE CONTAINING CRUSHED AND UNCRUSHED GRAVEL WITH HIGH FLAT-PARTICLE CONTENT Muhammad Ahlan; Muhammad Isya; Noer Fadhly
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 8 No. 2 (2019)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (367.28 KB) | DOI: 10.22225/pd.8.2.1367.245-256

Abstract

The aggregate shapes affect corresponding asphalt concrete performance. Asphalt concrete composed of more cubical, angular, and coarse-textured aggregates has higher performance than the one composed of elongated, flat, rounded, and smooth aggregates. Nevertheless, the available materials might be not perfect, for example, the materials might be the gravel with high flat-particle content. These gravels commonly are crushed to form angular and coarse-textured particles; however, the post-crushing products might be flatter, although the shapes become angular and coarse. No research has been found that compares the performance of asphalt concrete containing such aggregates. The objective of this study is to compare the performance of asphalt concrete containing high flat-particle content crushed gravel and the one containing high flat-particle content uncrushed gravel, in term of Marshall stability and Marshall durability. The Marshall method was used, in which, a total of 27 samples of asphalt concrete were tested. The result shows that the stability of asphalt concrete composed of crushed gravel with high flat-particle content is 38.8% better than the one composed of uncrushed gravel with high flat-particle content. In addition, the durability of the asphalt concrete composed of the crushed aggregate is 5.6% better than the one composed of the uncrushed aggregate. Bentuk agregat mempengaruhi kinerja beton aspal. Beton aspal yang mengandung agregat yang menyerupai kubus, bersudut, dan bertekstur kasar memiliki kinerja lebih baik dibandingkan dengan beton aspal yang mengandung agregat yang relatif bulat, lonjong, pipih, dan bertekstur licin. Namun, agregat yang tersedia tidak selalu sempurna. Material yang tersedia terkadang dapat berupa kerikil dengan kandungan agregat pipih yang tinggi. Kerikil ini biasanya dipecah untuk menjadi agregat yang bersudut dan bertekstur kasar, namun setelah dipecah agregat dapat lebih pipih walaupun bentuknya bersudut dan teksturnya kasar. Sejauh ini, belum ditemukan penelitian yang membandingkan kinerja beton aspal yang mengandung kerikil dengan kandungan agregat pipih yang tinggi pada saat agregat belum dan sudah dipecah. Tujuan dari penelitian ini adalah membandingkan beton aspal yang mengandung kerikil yang dipecah dengan kepipihan yang tinggi dan beton aspal yang mengandung kerikil yang tidak dipecah juga dengan kandungan agregat pipih yang tinggi, dalam hal stabilitas dan durabilitas Marshall. Metode yang digunakan adalah Metode Marshall. Pada metode ini, total 27 benda uji dites. Hasil penelitian menunjukkan stabilitas beton aspal yang mengandung agregat yang dipecah adalah 38.8% lebih baik dibandingkan dengan beton aspal yang mengandung agregat yang tidak dipecah. Begitu juga, durabilitas beton aspal yang mengandung agregat yang dipecah 5.6% lebih baik daripada beton aspal yang mengandung agregat yang tidak dipecah.
ANALISIS FAKTOR–FAKTOR YANG MEMPENGARUHI TIDAK BERFUNGSINYA TERMINAL BIREUEN Alwin Rusydi; Muhammad Isya; Yusria Darma
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 6, No 1 (2023): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v6i1.27760

Abstract

Bireuen Terminal is a Type B Terminal located in Geulumpang Payong Village, Jeumpa District, Bireuen Regency. The existence of the Bireuen Terminal has not been functioned optimally, due to the lack of activity that occurs in the terminal environment. In addition, the presence of a shadow terminal is also one of the causes of the lack of activity in the terminal. This research aims to investigate factors that affect the malfunctioning of Bireun terminal. This research was carried out by making direct observations at the research site and also distributing questionnaires to research informants consisting of the Aceh Provincial Transportation Office as well as Organda and DPRK Bireuen. Selection of informants (key persons) using purposive sampling techniques. Data analysis uses the Process Hierarchy Analysis (AHP) method with criteria, namely: road service level, accessibility, terminal facilities and management, environmental comfort and environmental safety. The results of the analysis show that the Bireuen Terminal has not met the requirements as a Type B Terminal. The main factors affecting the malfunctioning of the Bireuen Terminal were obtained from the accessibility criterion with a weight value of 0.327, the facility and terminal management criteria with a weight value of 0.307, the road service level criterion with a weight value of 0.157, the environmental safety criterion with a weight value of 0.113 and the environmental comfort criterion with a weight value of 0.100. The first alternative that needs to be optimized so that Bireuen Terminal works again, is the alternative location of the terminal that is easy to reach which is contained in the accessibility criteria, which indicates that this alternative is the most important alternative compared to other alternatives. Followed by alternative facilities in the terminal are adequate which are contained in the criteria for facilities and terminal management.
ANALISIS RISIKO PENAWARAN UNDERESTIMATE COST TERHADAP KUALITAS PROYEK KONSTRUKSI JALAN DI PROVINSI ACEH Hamdani Hamdani; Muhammad Isya; Hafnidar Abd Rani
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: This study aimed to analyze the most dominant factor in the risk of deals underestimate the cost, analyzing the relationship between risk factors deals underestimate the cost of the quality of road construction projects in the province of Aceh, and analyze the risk factors deals underestimate the cost of the most likely to affect the quality of construction projects road in the province of Aceh. Road construction were observed which have been completed in the province of Aceh starting from the year 2013 to 2015. This study uses interviews aimed at Budget Authority (KPA), as well as a questionnaire aimed to contractors of roads, with the qualification of K1, K2, K3, M1, M2 and B1. Based on data from Construction Services Development Board (LPJK) 2016 Aceh province, the population number is obtained as much as 2,717 contractors. Through equation Slovin the study sample was obtained by 97 contractors. The dominant factor underestimate the risk of cost deals on a road construction project in the province of Aceh is the cost factor contingency, with a mean value of 4,374. The relationship between risk factors underestimate cost deals on the quality of road construction projects in the province of Aceh are all associated very low partially with a Pearson correlation coefficient value 0,200. The risk factors underestimate deals cost the most likely to affect the quality of road construction projects in the province of Aceh is located on factors sighting locations, with a regression coefficient of 3,327. This suggests that if an enhanced review of the location, the workforce in terms of both quality and productivity on the quality of road construction projects in the province of Aceh will increase.Abstrak: Penelitian ini bertujuan untuk menganalisis faktor yang paling dominan terjadinya risiko penawaran underestimate cost, menganalisis hubungan antara faktor-faktor risiko penawaran underestimate cost terhadap kualitas proyek konstruksi jalan di Provinsi Aceh, dan menganalisis faktor-faktor risiko penawaran underestimate cost yang paling berpeluang mempengaruhi kualitas proyek konstruksi jalan di Provinsi Aceh. Proyek konstruksi jalan yang diamati adalah yang telah selesai dilaksanakan di Provinsi Aceh mulai dari tahun 2013-2015. Penelitian ini menggunakan wawancara yang ditujukan pada Kuasa Pengguna Anggaran (KPA), serta kuesioner yang ditujukan kepada kontraktor bidang jalan, dengan kualifikasi K1, K2, K3, M1, M2 dan B1. Berdasarkan data dari Lembaga Pengembangan Jasa Konstruksi (LPJK) Provinsi Aceh Tahun 2016, jumlah populasi diperoleh sebanyak 2.717 kontraktor. Melalui persamaan Slovin maka sampel penelitian diperoleh sebanyak 97 kontraktor. Faktor dominan terjadinya risiko penawaran underestimate cost pada proyek konstruksi jalan di Provinsi Aceh adalah faktor biaya contingency, dengan nilai mean sebesar 4,374. Hubungan antara faktor-faktor risiko penawaran underestimate cost terhadap kualitas proyek konstruksi jalan di Provinsi Aceh adalah semuanya mempunyai hubungan yang sangat rendah secara parsial dengan nilai koefisien korelasi Pearson 0,200. Faktor risiko penawaran underestimate cost yang paling berpeluang mempengaruhi kualitas proyek konstruksi jalan di Provinsi Aceh berada pada faktor peninjauan lokasi, dengan nilai koefisien regresi sebesar 3,327. Hal ini menunjukkan bahwa apabila faktor peninjauan lokasi ditingkatkan, maka tenaga kerja yang baik dari segi kualitas dan produktivitas pada kualitas proyek konstruksi jalan di Provinsi Aceh akan semakin meningkat.
ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PEMILIHAN MODA MENUJU TEMPAT KERJA MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS Rahmad Saputra; Renni Anggraini; Muhammad Isya
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Transportation system serves to enhance the mobility of population and support economic growth in the region. The important role of transportation in providing the access for communities, it is necessary to study the transportation needs based on various criteria attached as well as alternative modes as the most appropriate by distance and easiness in reaching the destination. Although Jantho is the Capital of Aceh Besar District, which about 58 km from Banda Aceh, the workers of Jantho are preferred to live in Banda Aceh including employee of regional government. The objective of this study is to determine the ­perception of respondents, which is Jantho government employee, in transportation mode selection and factors influence respondent’s priorities in transportation mode selection. Questionnaire survey methods is used in this study and data will be processed and analyzed using the Analytic Hierarchy Process Methods (AHP) so it can determine the selected factors of each mode. The results showed that the factors influenced in mode selection to work are safety, comfort and travel time. For global mode selection, respondents would chose private car as a mode for work trips and followed by bus. Although the cost takes last ranks on the respondents priority, but the tendency to choose public transport as a means for work trip is high. Bus becomes superior in terms of safety and cost, also safety is essential for traveling in high-speed traffic in addition to other advantages in terms of cost.Abstrak: Sistem transportasi berfungsi untuk meningkatkan mobilitas penduduk serta mendukung pertumbuhan ekonomi pada suatu daerah. Pentingnya peranan transportasi dalam menyediakan akses bagi masyarakat, maka perlu dikaji kebutuhan transportasi jika ditinjau berdasarkan berbagai kriteria yang  menyertainya serta alternatif  moda apakah yang paling tepat berdasarkan jarak dan kemudahan untuk mencapai tujuan. Kota Jantho merupakan pusat pemerintahan Kabupaten Aceh Besar yang berjarak sekitar 58 KM dari Kota Banda Aceh. Walaupun merupakan ibu kota kabupaten, tetapi para pekerja di Kota Jantho lebih memilih untuk berdomisili di Kota Banda Aceh tanpa terkecuali para Pegawai Negeri Sipil Daerah. Tujuan dari penelitian ini adalah untuk mengetahui persepsi responden, yaitu Pegawai Negeri Sipil kota Jantho dalam pemilihan moda menuju tempat kerja dan untuk mengetahui faktor-faktor apa saja yang mempengaruhi prioritas responden dalam hal pemilihan moda. Penelitian ini menggunakan metode survei kuesioner, data akan diolah dan dianalisis dengan menggunakan metode Analytic Hierarchy Process (AHP) untuk mencari faktor terpilih dari masing-masing moda. Hasil penelitian menunjukkan bahwa faktor yang mempengaruhi pemilihan moda menuju tempat kerja adalah keamanan, kenyamanan dan waktu tempuh. Untuk pemilihan moda global, responden memilih mobil sebagai moda favorit untuk perjalanan kerja diikuti oleh bus kantor. Walaupun biaya menempati urutan terakhir dari prioritas responden, tetapi kecenderungan untuk memilih angkutan kantor sebagai sarana untuk perjalanan kerja termasuk tinggi. Bus kantor unggul dalam hal keamanan dan biaya, keamanan menjadi hal penting untuk perjalanan dengan lalu lintas berkecepatan tinggi disamping keunggulan lain dalam hal biaya.
ANALISIS KONDISI KEMANTAPAN JALAN DENGAN LALU LINTAS HARIAN RATA-RATA PADA JALAN ARTERI SEKUNDER Joly Srianty; Muhammad Isya; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Road as land transport insfrastructure is essential to provide a good traffic flow, and also to accelarate socio-economic growth within the region. Road damages faster than the design life often occur, especially in the arterial road. Rehabilitation and maintenance of  roads is an activity to maintain the stability of road condition until the end of serviaceability age as planned. This study aims to determine the stability condition of national road at arterial secondary network system in Banda Aceh and steadiness road condition relation with average daily traffic (ADT) in last 5 years period (2011-2015). The data used primary and secondary data obtained through road condition survey (RCS) and secondary data obtained from the institution national road planning and monitoring Aceh Province which are stability of roads and ADT data from 2011-2015. This study used descriptive method that comparing road stability condition data with ADT, while for road condition analyse refers to Bina Marga Methode with calculating Surface Distress Index (SDI) for Pavement road. The results of this study for road condition 2015 were in good condition with a value 100% solid, and for relation between steadiness with ADT known that the ADT increasing does not affect to steadiness road condition every year. Abstrak: Jalan merupakan prasarana angkutan darat yang sangat penting bagi kelancaran transportasi, dimana jalan dapat memperlancar pertumbuhan sosial ekonomi antar daerah. Kerusakan jalan lebih cepat dari umur rencana sering terjadi khususnya di jalan-jalan arteri. Rehabilitasi dan pemeliharaan jalan merupakan kegiatan yang dilakukan untuk mempertahankan kondisi jalan agar kondisi mantap jalan dapat terus dipertahankan hingga mencapai  umur layan sesuai yang direncanakan. Penelitian ini bertujuan untuk mengetahui kondisi kemantapan jalan nasional pada sistem jaringan arteri sekunder dalam kota Banda Aceh dan hubungan kondisi kemantapan jalan terhadap lalu lintas harian rata-rata (LHR) dalam kurun waktu 5 tahun terakhir (2011-2015). Data yang digunakan adalah data primer yang diperoleh dari Survei Kondisi Jalan dan data Sekunder diperoleh dari Instansi Perencanaan dan Pengawasan Jalan Nasional Provinsi Aceh yaitu data kemantapan jalan dan data LHR dari tahun 2011-2015. Metode yang digunakan dalam penelitian ini bersifat deskriptif yaitu membandingkan kondisi jalan dengan data LHR dan jenis penanganan sedangkan untuk analisis penilaian kondisi jalan mengacu pada metode Bina Marga dengan perhitungan Surface Distress Index (SDI) untuk jalan beraspal. Hasil penelitian ini adalah kondisi jalan pada tahun 2015 berada pada kondisi baik dengan nilai 100% mantap. Hubungan kondisi kemantapan jalan terhadap LHR diketahui bahwa LHR yang terus meningkat setiap tahunnya tidak mempengaruhi nilai kondisi mantap jalan yang tetap terjaga.
ANALISIS KARAKTERISTIK DAN KEBUTUHAN RUANG PARKIR PADA AREAL PUSAT PERBELANJAAN SUZUYA MALL BANDA ACEH Muhammad Isya; Cut Mutiawati; Handayani Handayani
JURNAL TEKNIK SIPIL Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Suzuya Mall Banda Aceh is one of the shopping center in the city of Banda Aceh. This mall is located onJln. Teuku Umar street. Daily activities of community cause the increasing of trip, including the attraction trip to this mall. However, the availabililty of parking space can not be accommodated by the mall, especially during the peak hours. The purpose of this study are to analyze the characteristics, capacity and demand parking of Suzuya mall.The results analysis of this study are showed: for motorcycles, peak hour vehicle arrival is on Saturday 20.00-21.00 pm at 285 veh/h with a volume of 1751 veh/day. The average length of the highest parking on Sundays at 0.96 h/veh. The highest accumulation on Sunday of 219 veh between 16:00-17:00 pm. The highest parking capacity on Thursday by 517 Unit Parking Space.
EVALUASI KECELAKAAN LALU LINTAS DITINJAU DARI ASPEK JARAK PANDANG GEOMETRIK JALAN DAN FASILITAS PERLENGKAPAN JALAN TERHADAP SIMPANG SIBREH Teuku Aswardi; Sofyan M. Saleh; Muhammad Isya
JURNAL TEKNIK SIPIL Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Inadequate road infrastructure, can cause various problems, especially in the case of road safety. The road safety assessment aims to improve services and anticipate road accidents. Based on data from P2JN Kem PU-PR, there are 34,567 units of vehicles passing by on the road (Lambaro Sta. 0 + 000 - Sta. 77 + 000) every month.Accident data information from the police, there are some most frequent locations of accidents on this road.Recorded in 2016 from January to December, there were 237 deaths (MD), 52 people seriously injured (LB) 35 people and minor injuries (LR) of 453 people .For the year 2017 from January to March there are 24 incidents with deaths (MD) 4 people, seriously injured (LB) 0 people and minor injuries (LR) 57 people. This study was conducted on 1 points of observation that was categorized as accident prone location that is Observation point in front of Sibreh Community Health Centers  Sta. 15 + 050. This study was conducted to analyze the stopping sight distance and evaluate the geometric condition and condition of existing infrastructure facilities at  point of observation. The method used is by doing direct observation in the area for 3 days, Sunday (weekend), Monday and Wednesday (weekdays). The results showed that stopping sight distance (JPH) at  point of observation can be categorized as feasible. It is showed by JPH obtained at Point Observation of 56,65 m. Based on the survey results, the geometric condition at observation point can be categorized as feasible, while the condition of the streets equipment facility is categorized as unsuitable for observation point. The assessment of traffic accident evaluation is suggested to the parties involved in Aceh Province to be more concerned about the conditions and factors that can affect the occurrence of accidents to reduce the potential for accidents driving.Abstrak: Sarana prasarana jalan yang tidak memadai, dapat menyebabkan berbagai macam masalah terutama dalam hal keselamatan di jalan raya. Kajian tentang keselamatan jalan bertujuan untuk meningkatkan pelayanan dan mengantisipasi terhadap terjadinya kecelakaan di jalan. Berdasarkan data dari P2JN Kem PU-PR, ada 34.567 unit kendaraan yang berlalu lalang di ruas jalan (Lambaro Sta. 0 + 000 – Sta. 77 + 000) setiap bulannya. Informasi data kecelakaan dari kepolisian terdapat beberapa lokasi yang sering terjadi kecelakaan pada jalan ini.Tercatat dalam tahun 2016 dari bulan januari sampai dengan Desember terdapat 237 jumlah kejadian dengan jumlah meninggal dunia (MD) 52 jiwa, luka berat (LB) 35 jiwa dan luka ringan (LR) 453 jiwa. Untuk tahun 2017 dari bulan Januari sampai bulan Maret terdapat 24 kejadian dengan jumlah meninggal dunia (MD) 4 jiwa, luka berat (LB) 0 jiwa dan luka ringan (LR) 57 jiwa. Penelitian dilakukan pada Titik Pengamatan Depan Puskesmas Sibreh Sta. 15 + 050. Penelitian ini dilakukan untuk menganalisis jarak pandang henti dan jarak pandang menyiap serta mengevaluasi kondisi geometrik dan kondisi existing fasilitas infrastruktur pada titik pengamatan. Metode yang digunakan yaitu dengan melakukan pengamatan langsung di lapangan selama 3 hari, yaitu hari minggu (hari libur) serta hari senin dan rabu (hari kerja). Hasil penelitian menunjukkan, jarak pandang henti (JPH) dapat dikategorikan laik. Hal ini ditunjukkan dengan JPH yang diperoleh pada Titik Pengamatan  sebesar 56,65 m. Dari hasil penelitian ini diketahui kondisi geometrik jalan pada  titik pengamatan dapat dikategorikan laik, sedangkan kondisi fasilitas perlengkapan jalan dikategorikan tidak laik. Kajian evaluasi kecelakaan lalulintas ini disarankan kepada pihak-pihak yang terlibat di Provinsi Aceh agar dapat lebih memperhatikan lagi kondisi-kondisi dan faktor-faktor yang dapat berpengaruh terjadinya kecelakaan untuk mengurangi potensi terjadinya kecelakaan berkendaraan.
KAJIAN MANFAAT PEMBANGUNAN JALAN LINGKAR KOTA LHOKSEUMAWE (STUDI KASUS JALAN LINGKAR KOTA LHOKSEUMAWE) Rijalul Qadri; Muhammad Isya; Sofyan M. Saleh
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The city of Lhokseumawe is the administrative city of the central government and all economic, political, social and cultural activities. Along with the existence of the existing road that is the road of freedom of the west with a road length of 5 km wide road of 7 m average consisting of 2 lane 2 direction (2/2 UD) causing congestion, traffic accidents and increasing travel time. To anticipate the problem in 2012 the government of Lhokseumawe City began to budget for the construction of Lhokseumawe City Ring Road starting from Simpang Loskala - Simpang Lestari with a total length of 7.6 km road, which has been built currently 3 km to Gampong Ujong Blang is still In the measurement and land acquisition stage. The average road width of 14 m consists of 4 lane 2 lanes (4/2 D) is a new access road to Lhokseumawe City. The purpose of this study was to calculate VOC and time savings for existing and alternative road routes, to know respondent perceptions and to evaluate economic feasibility based on BCR, NPV and EIRR. The results of this study indicate that the average annual traffic volume (LHRT) on alternative roads is 4.279 vehicle/day in 2017; The difference in total time value obtained by IDR 189,877,-/ vehicle and VOC difference is IDR 3,289 / vehicle; And economic feasibility of Lhokseumawe Ring Road development is obtained in 2036. The EIRR value obtained is at the discount rate of 17.27%, it indicates that the development of Ring Road / alternative is very feasible to be implemented with bank loan interest rate up to 17.27%.Abstrak: Kota Lhokseumawe merupakan kota administratif pusat pemerintahan dan segala kegiatan ekonomi, politik, sosial dan budaya. Seiring padatnya jalan eksisting yaitu jalan merdeka barat dengan panjang jalan 5 km lebar badan jalan rata-rata 7 m yang terdiri dari 2 lajur 2 arah (2/2 UD) yang mengakibatkan kemacetan, kecelakaan lalulintas dan bertambahnya waktu tempuh. Untuk mengantisipasi permasalahan tersebut pada tahun 2012 pemerintah Kota Lhokseumawe mulai menganggarkan dana untuk Pembangunan Jalan Lingkar Kota Lhokseumawe yang dimulai dari Simpang Loskala – Simpang Lestari dengan total panjang jalan 7,6 km, yang telah dibangun saat ini 3 km sampai dengan Gampong Ujong Blang selanjutnya masih dalam tahapan pengukuran dan pembebasan lahan. Lebar badan jalan rata-rata 14 m yang terdiri dari 4 lajur 2 jalur (4/2 D) merupakan jalan akses baru menuju Kota Lhokseumawe. Tujuan Penelitian ini untuk menghitung BOK dan penghematan nilai waktu untuk rute jalan existing dan jalan alternatif, mengetahui persepsi responden serta mengevaluasi kelayakan ekonomi berdasarkan BCR, NPV dan EIRR. Hasil penelitian ini menunjukkan bahwa Volume lalu lintas harian rata-rata tahunan (LHRT) pada jalan alternatif didapat 4.279 kend/hari pada tahun 2017; Selisih nilai waktu total yang diperoleh sebesar Rp 189.877,-/kendaraan dan selisih BOK adalah Rp 3.289,- /kendaraan; dan Kelayakan ekonomi pembangunan jalan Lingkar Kota Lhokseumawe didapat pada tahun 2036. Nilai EIRR yang diperoleh yaitu pada discount rate 17,27%, ini menunjukkan bahwa pembangunan jalan lingkar/alternatif sangat layak untuk dilaksanakan dengan suku bunga pinjaman bank sampai dengan 17,27%.
PENGARUH HAMBATAN SAMPING TERHADAP KINERJA JALAN DI PERSIMPANGAN TIPE Y (Studi Kasus Simpang Pelor - Meulaboh) Bambang Tripoli; Sofyan M. Saleh; Muhammad Isya
JURNAL TEKNIK SIPIL Vol 5, No 2 (2016): Volume 5, Nomor 2, Januari 2016
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract:Meulaboh city has several intersections or junction one of them is Simpang Pelor Meulaboh which have 3 arms signalized between National Road, Iskandar Muda Street, and Teuku Umar Street. The problem statements in this research are how to determine side barriers, adequacy for parking space and the shape of corner at the outer side of the road, traffic volume and the level of service road. The purpose of the study are to estimate how complex side barriers, adequacy for parking space and the shape of corner parking, traffic volume and also the level of service to road performances. The method based on MKJI 1997. Based on the results weighted frequencies of occurrence the side barriers "high", with a weight of events National Road 650/hour, Teuku Umar Street 655/hour and Iskandar Muda Street 625/hour. The capacity of the parking lot placed on the position boundary lines and building in the form of angle parking position 300, with the amount of two-wheeled vehicle 6,397 units four-wheeled and six-wheeled 674 units. Traffic volumes occurred on Wednesday with a green and missing time 16 seconds while the time cycle 119 seconds, for National Road (saturation flow 1,342 smp/hour, the volume of traffic flow 255 smp/hour, green time 26 sec, capacity 291 smp/hour and average on delay 20.685 sec/smp), Teuku Umar Street (saturation flow 1,271 smp/hour, the volume of traffic flow 434 smp/hour, green time 46 sec, capacity 496 smp/hour and average on delay 24.988 sec/smp), while for Iskandar Muda Street (saturation flow 1,342 smp/hour, the volume of traffic flow 288 smp/hour, green time 31 sec, capacity 329 smp/hour and average on delay 21.582 sec/smp), the degree of saturation of each arm numbered at 0.88. Related to the result analysis shows the level of service E, where the flow unstable due to the volume of traffic was almost at capacity with speeds sometimes stalled.Keywords : side barriers, parking, street performanceAbstrak:Kota Meulaboh mempunyai beberapa pertemuan jalan atau persimpangan salah satunya Simpang Pelor Meulaboh yang bersinyal memiliki 3 lengan jalan antara Jalan Nasional, Jalan Iskandar Muda dan Jalan Teuku Umar.Rumusan masalah dalam penelitian bagaimana menentukan hambatan samping, kebutuhan ruang parkir serta bentuk sudut parkir di sisi luar badan jalan, volume lalu lintas dan tingkat pelayanan terhadap kinerja jalan. Tujuan penelitian memperkirakan seberapa besar hambatan samping, kebutuhan ruang parkir dan bentuk sudut parkir, mengevaluasi volume lalu lintas serta tingkat pelayanan terhadap kinerja jalan. Metode yang digunakan berdasarkan MKJI 1997. Berdasarkan hasil frekwensi berbobot kejadian hambatan samping ”tinggi”, dengan bobot kejadian Jalan Nasional 650/jam, Jalan Teuku Umar 655/jam dan Jalan Iskandar Muda 625/jam. Kapasitas lahan parkir di tempatkan pada posisi garis sempadan bangunan dalam bentuk sudut 300 posisi parkir, dengan jumlah kendaraan roda dua 6.397 unit sedangkan roda 4 dan roda enam 674 unit. Volume lalu lintas terjadi hari Rabu dengan waktu antar hijau dan waktu hilang 16 detik sedangkan waktu siklus 119 detik, untuk Jalan Nasional (arus jenuh 1.342 smp/jam, volume arus lalu lintas 255 smp/jam, waktu hijau 26 det, kapasitas 291 smp/jam dan tundaan rata-rata 20,685 det/smp), Jalan Teuku Umar (arus jenuh 1.271 smp/jam, volume arus lalu lintas 434 smp/jam, waktu hijau 46 det, kapasitas 496 smp/jam dan tundaan rata-rata 24,988 det/smp), sedangkan untuk Jalan Iskandar Muda (arus jenuh 1.342 smp/jam, volume arus 288 smp/jam, waktu hijau 31 det, kapasitas 329 smp/jam dan tundaan rata-rata 21,582 det/smp), yang derajat kejenuhan setiap lengan berjumlah sama 0,88. Terkait hasil analisis menunjukkan tingkat pelayanan E, dimana arus kurang stabil karena volume lalu lintas berada hampir pada kapasitas dengan kecepatan terkadang terhenti.Kata kunci : hambatan samping, parkir, kinerja jalan
ANALISIS HUBUNGAN ANTARA VOLUME, KECEPATAN DAN KEPADATAN LALU LINTAS (STUDI KASUS : JEMBATAN LAMNYONG, JALAN TEUKU NYAK ARIEF BANDA ACEH) Ariadi Ariadi; Muhammad Isya; Irin Caisarina
JURNAL TEKNIK SIPIL Vol 5, No 3 (2016): Volume 5, Nomor 3, Mei 2016
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract:Jalan Teuku Nyak Arief is one of the road in Banda Aceh with a very dense traffic as it is directly connected with the central area of education which frequently congested especially on Lamnyong bridge. There is the difference number of lane between the approach lane and the bridge lane which causes the reducing of the vehicle speed. The aim of this study was to determine the relationship between the volume, speed and density of the traffic due to the narrowing of the road at the site. Field data collection was carried out for 3 days which is on Monday, Wednesday and Thursday (9th, 11th, and March 12, 2015) for 6 hours per day. The data was collected at peak hours in the morning from 7:00 to 9:00 a.m., daytime hours from 12:00 to 02:00 p.m., and in the afternoon hours from 04:00 to 06:00 p.m. There are 24 groups was occupied during 6 hour observation with 15-minute intervals. In this study, data analysis was conducted based on Indonesian Highway Capacity Manual (MKJI) 1997,using Microsoft Excel software. Three methods were used in determining the relationship characteristics of the traffic: Greenshield linear, Greenberg logarithmic and Underwood exponential. The results of analysis showed that the relationship model that is appropriate for Jalan Teuku Nyak Arief (on the Lamnyong Bridge) is Underwood model. It was obtained that the mathematical model equation for relationship of speed and density (S-D) is S = 30.6496 x e-0.0045(D); for the relationship of volume and speed (V-S) is V = 755.7700 x S - 220.5516 x S (Ln.S); and for the relationship of volume and density (V-D) is V = 30.6496 x D x e-0045(D), with a coefficient of determination is R2 = 0.9145.Keywords : Volume, speed, traffic density, Greenshield linear, Greenberg logarithmic, Underwood exponentialAbstrak:Jalan Teuku Nyak Arief merupakan salah satu ruas jalan di Kota Banda Aceh dengan volume lalu lintas yang sangat padat karena berhubungan langsung dengan kawasan pusat pendidikan dan sering mengalami kemacetan, terutama pada jembatan Lamnyong. Pada saat memasuki jembatan tersebut terjadi perbedaan karakteristik geometrik jalan dari 3 lajur menyempit menjadi 2 lajur, yang mengakibatkan kecepatan kendaraan menjadi berkurang. Tujuan dari penelitian ini adalah untuk mengetahui hubungan antara volume, kecepatan dan kepadatan lalu lintas akibat terjadinya penyempitan jalan pada lokasi penelitian. Pengumpulan data lapangan dilakukan selama 3 hari yaitu hari Senin, Rabu dan Kamis (tanggal 9, 11, dan 12 Maret 2015) selama 6 jam setiap harinya yaitu pada jam puncak pagi hari jam 07.00 - 09.00 WIB, siang hari jam 12.00 - 14.00 WIB, dan sore hari jam 16.00 - 18.00 WIB. Selama 6 jam pengamatan terdapat 24 kelompok interval waktu 15 menit. Analisis data didasarkan pada Manual Kapasitas Jalan Indonesia (MKJI) 1997 dengan menggunakan perangkat lunak Microsoft Excel. Dalam menentukan hubungan karakteristik lalu lintas digunakan tiga metode yaitu linier Greenshield, logaritmik Greenberg dan eksponensial Underwood. Dari hasil analisis diketahui bahwa model hubungan yang sesuai untuk ruas jalan Teuku Nyak Arief (pada jembatan Lamnyong) adalah model Underwood dengan persamaan model matematis S = 30,65 . e-0,0045(D) untuk hubungan kecepatan dan kepadatan (S-D) ; V = 755,77 . S - 220,55 . S (Ln.S) untuk hubungan volume dan kecepatan  (V-S) ; dan V = 30,65 . D . e-0045(D) untuk hubungan volume dan kepadatan (V-D), dengan nilai koefisien determinasi (R2) = 0,9145.Kata kunci : Volume, kecepatan, kepadatan lalu lintas, linier Greenshield, logaritmik Greenberg, eksponensial Underwood
Co-Authors Adia Saputra Alfiansyah Yulianur Alfiansyah Yulianur BC Alfiansyah, Reza Alwin Rusydi Andris Wandi Ariadi Ariadi Bahron Bakti Bakauddin, Bakauddin Bambang Tripoli Chaira Chaira Chaira Chaira Cut Mutiawati Etty Herawaty Fadli Fadli Fadli Idris Fadli Idris Fahrezi, Ahmad Egi Firdaus Firdaus Firdaus Firdaus Fisaini, Juliana Fitri, Suraya Fitrika Mita Suryani Hafnidar A. Rani Hamdani Hamdani Handayani Handayani Intan Wirnanda Iqbal Iqbal Iqbal Iqbal Irfan Irfan Irin Caisarina Irwin Irwin Isnanda Isnanda Isnanda Isnanda Joly Srianty Keumala, Putri Pirusa Liza Karmina Lulusi Lulusi Martina, Rita Marwan Marwan Matjakriandi Matjakriandi Matjakriandi, Matjakriandi Mirza Irwansyah Mirza Sofyan Mubarak Mubarak Mudinillah, Adam Mudji Burrahman Mufazzil Yusra Muhammad Ahlan Mulyadi Mulyadi Mulyadi Mulyadi Muntazar Muntazar Nasution, Wenny Rahmadhani Natalia Tanan, Natalia Nazariani Nazariani Noer Fadhly Nova Viyantimala Nura Usrina Ondriani Ondriani Ondriani, Ondriani Pinta Sari Raby, Shahrial Rahmad Saputra Ramli, Yuswardi Razuardi Razuardi Razuardi, Razuardi Renni Anggraini Renni Anggraini Rijalul Qadri Riski, Sita Rita Martina riza, Fakhrur Ruslan Ruslan Salmannur, Alfi Satria Mandaraira Shafira, Zadia Sofyan M. Saleh Sofyan M. Saleh Sofyan M. Saleh Sofyan M. Saleh Sofyan M. Saleh Sugiarto Sugiarto Suraya Fitri Suryani*, Fitrika Mita Tarmizi Tarmizi Tarmizi Tarmizi Taufiq, Luthfi Chaliqi Tety Sriana Teuku Aswardi Teuku Fadrial Mahfud Tri Handayani Wirnanda, Intan Yuhanis Yunus Yunus, Yuhanis Yusria Darma Yuswardi Ramli Zahroel Barady