ANALISIS STRUKTUR TIPE WARREN UNTUK RANGKA ATAS JEMBATAN (STUDI KASUS: JEMBATAN KOTO ILALANG, BASO) Ridha Sari; Sutria Desman; Hanifah Asnur
Ensiklopedia of Journal Vol 3, No 5 (2021): Vol 3 No. 5 Edisi 3 Desember 2021
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (260.233 KB) | DOI: 10.33559/eoj.v4i3.313

Abstract

The bridge structure calculation should be carried out in detail and thoroughly. Like any other civil buildings, bridges involve the livelihood of many people. So that a small mistake in planning can be fatal. The Air Koto Ilalang Bridge, which is located on the border of Payakumbuh – Baso, has an important role in connecting Bukittinggi, Limapuluh Kota and Payakumbuh as well as being part of the main connecting route between West Sumatra Province and Riau. Built in 1980, this bridge took a reconstruction in 2020. In this study, an analysis was carried out on the superstructure of the Koto Ilalang bridge with warren type of structure ; loading analysis, calculation of reinforcement for floor plates and the sidewalks, calculating the profile of the transverse girder and the main girder of the bridge. The results show that the bridge floor plate thickness is 30 cm. And the dimensions of the reinforcement on the floor slab are reinforcement 16 – 200 mm at the pedestal and the field. For stringers and transverse girders, steel structure profiles are used IWF 582.300.12.17 as stringers, IWF 900.300.16.28 as transverse girders, IWF 428.407.20.35 as main girders. Meanwhile, the deflection control obtained a value of 1.1224 cm, where this figure is still within the safe limit because the allowable deflection limit is 9 cm.Keywords: Steel, Bridge, Warren Trus, Stringer
Analisis Karakteristik Sedimen dan Debit Sedimen di Sungai Batang Agam Kota Payakumbuh M. Dito Febrian; Ridha Sari; Sutria Desman
Technologica Vol. 2 No. 1 (2023): Technologica
Publisher : Green Engineering Society

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55043/technologica.v2i1.65

Abstract

Normalisasi Batang Agam Kota Payakumbuh yang telah dimulai dari tahun 2017, dengan pengembangan kawasan sepanjang normalisasi menjadi pusat wisata bagi Kota Payakumbuh dan sekitarnya. Terlepas dari pemanfaatan tersebut, tujuan awal normalisasi Sungai Batang Agam ini adalah untuk mencegah terjadinya banjir dikawasan sepanjang sungai. Untuk tercapainya tujuan pencegahan banjir penampang sungai seharusnya bersifat tetap. Salah satu yang sangat menentukan terjadinya perubahan penampang sungai adalah sedimen. Untuk itu dilakukan penelitian untuk mengetahui karakteristik sedimen dan debit sedimen di hulu dan di hilir kawasan normalisasi sungai Batang Agam. Karakter sedimen yang diuji pada penelitian ini adalah karakter mekanik dari sedimen, dan debit sedimen dihitung dengan metode Shen dan Hungs. Dari hasil pengujian karakter sedimen didapatkan kadar air terbesar adalah 12,21%, berat jenis rata-rata terbesar adalah 1,0294 N/m3. Sedangkan untuk hasil pengujian ukuran butiran, jenis sedimen sungai Batang Agam termasuk kepada jenis agregat halus. Untuk perhitungan angkutan sedimen di hulu dan di hilir normalisasi Batang Agam 46,551 kg/hari dan 137,264 kg/hari
Pengukuran Lokasi Untuk Perencanaan Pembangunan Stadion di Tanjung Haro Sikabu-Kabu Padang Panjang Kabupaten 50 Kota Menggunakan Alat Ukur Theodolite Rini Yunita; Hanifah Asnur; Umar Khatab; Ronny Junnaidi; Ridha Sari; Arif Rizki Marsa; Arif Budiman; Lilik Suhery
Jurnal Pustaka Paket (Pusat Akses Kajian Pengabdian Komputer dan Teknik) Vol 1 No 1 (2022): Jurnal Pustaka PAKET
Publisher : Jurnal Pustaka Paket (Pusat Akses Kajian Pengabdian Komputer dan Teknik)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Tim pengabdian Sekolah Tinggi Teknologi Payakumbuh yang terdiri dari tim dosen dan mahasiswa melakukan pengabdian dengan agenda kegiatan ”Pengukuran Lokasi Untuk Perencanaan Pembangunan Stadion di Tanjung Haro Sikabu-Kabu Padang Panjang Kabupaten 50 Kota Menggunakan Alat Ukur Theodolite”. metode yang digunakan adalah metode pengukuran polygon untuk mendapatkan ukuran luas stadion yang akan di rencanakan. Kegiatan pengukuran ini menggunakan alat ukur theodolite yang dilakukan oleh mahasiswa teknik sipil dipandu oleh tim dosen STT Payakumbuh. Selanjutnya hasil pengukuran yang diperoleh diolah untuk mendapatkan desain gambar rancangan stadion. Sehingga dapat memudahkan masyarakat Tanjung Haro untuk merealisasikan pembangunan stadion yang direncanakan
Consistency and Homogeneity Test of Rainfall Data for The Payakumbuh City Area Melvi Fathia Marisca; Ridha Sari; Biota Fotrah
LEADER: Civil Engineering and Architecture Journal Vol. 4 No. 1 (2026): February
Publisher : Fakultas Teknik Sipil dan Perencanaan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37253/leader.v4i1.9974

Abstract

Rainfall plays an important role in planning water structures, be it drainage, irrigation, dams, etc. Testing rainfall data is useful for reducing the risk in planning water structures to be built. The rainfall data used was obtained from the PSDA of West Sumatra Province with 3 closest station points for the Pyakumbuh City area (Canduang Station, Tanjung Pati Station, and Suliki Station) over a period of 10 years (2013-2022). The RAPS and Double Mass Curve methods were used for consistency tests, while the T-test was used for Homogeneity tests. The results of the Double Mass Curve Consistency test at Suliki Station showed that the rainfall data was consistent, while at Tanjung Pati Station and Canduang Station it was inconsistent, so a correction factor was needed so that it was obtained at both stations consistent. While the consistency test U used RAPS method against preliminary rainfall data and that has been corrected obtained data results already consistent with mark as following : Q count < Q critical = 1.48 < 3.60. Q count < Q critical = 1.92 < 3.60. Q count < Q critical = 2.14 < 3.60. Q count < Q critical = 1.87 < 3.60. Q count < Q critical = 1.75 < 3.60. Meanwhile, the results of the RAPS method Consistency test show that the rainfall data from the three stations are consistent throughout the observation period. For the results of the Homogeneity test using t-test is as as follows : t count < t critical = 1.168 < 1.734. t count < t critical = 0.721 < 1.73. t count < t critical = 0.435 < 1.734. t count < t critical = 0.387 < 1.734. t count < t critical = 1.702 < 1.734. t count < t critical = - 0.071 < 1.734. From the calculation of the Homogeneity test of the t-test method, it shows that the rainfall data from the three rainfall stations did not experience significant changes throughout the time period, indicating that the data from the three rainfall stations were homogeneous. The results of the consistency test and homogeneity test showed that the rainfall data from the PSDA of West Sumatra Province were consistent and homogeneous.
Analysis of Radiotherapy Linac Bunker Building Construction Project Scheduling: Case Study at RSUD dr. Achmad Mochtar Bukittinggi Elvi Syamsuir; Dinda Maharany; Ridha Sari; Fatma Ira Wahyuni; Sri Tria Siska
LEADER: Civil Engineering and Architecture Journal Vol. 2 No. 6 (2024): December
Publisher : Fakultas Teknik Sipil dan Perencanaan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37253/leader.v2i6.10190

Abstract

Pelaksanaan proyek konstruksi merupakan rangkaian beberapa kegiatan atau pekerjaan yang kompleks dan saling ketergantungan. Rangkaian kegiatan pekerjaan membutuhkan penjadwalan proyek untuk mencapai kesuksesan dari proyek. Penelitian tentang analisa penjadwalan proyek pembangunan telah dilakukan di gedung Bunker Linac radioterapi RSUD dr. Achmad Mochtar Bukittinggi. Tujuan dilakukan penelitian ini adalah untuk menganalisis efisiensi penjadwalan kegiatan pada pelaksanaan proyek pembangunan gedung Bunker Linac radioterapi RSUD dr. Achmad Mochtar Bukittinggi, khususnya pada pekerjaan struktur dan arsitektur dengan menggunakan software Microsoft Project 2021. Microsoft Project. Software Microsoft Project digunakan untuk melakukan perencanaan proyek yang terperinci, penugasan sumber daya, pengaturan jadwal dan menghitung estimasi biaya, perencanaan, pengelolaan, pengawasan serta pelaporan data dari suatu proyek. Penelitian ini menggunakan data sekunder sebagai data yang dianalisis, dimana data sekunder yang diteliti dan dianalisis adalah berupa data gambar, data RAB, dan data time schedule. Hasil dari penelitian penjadwalan proyek pembangunan gedung Bunker Linac radioterapi RSUD dr. Ahmad Mochtar Bukittingggi setelah menggunakan Microsoft Project yaitu didapatkan percepatan waktu dari 90 hari kalender menjadi 77 hari kalender pada pekerjaan struktur dan pekerjaan arsitektur.