Claim Missing Document
Check
Articles

Found 4 Documents
Search

Pengembangan Potensi Pertanian Dan Perkebunan Kabupaten Selayar Risma Niswati Tarman; Ahfandi Ahmad; Muhammad Arsil Datau; Herdy Pratama Putra; Achmad Setiawan; Nasrullah Tahir; Aam Azatil Isma; Sri Aisyah Yope; Evi Harviani; Fitrawansyah; Jeffits Khusnu Alif
Tarjih : Agribusiness Development Journal Vol. 1 No. 02 (2021): VOLUME 1, NOMOR 02, DESEMBER 2021
Publisher : Program Studi Agribisnis Universitas Muhammadiyah Sinjai

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (809.115 KB) | DOI: 10.47030/tadj.v1i2.352

Abstract

Kajian yang akan dilakukan untuk mengetahui (1) bagaimana kondisi aktual sektor pertanian dan perkebunan menurut kecamatan di Kabupaten Kepulauan Selayar, (2) upaya-upaya bagaimana yang dapat dilakukan untuk meningkatkan kinerja sub sektor tanaman pangan, hortikultura dan perkebunan di setiap kecamatan dan di Kabupaten kepulauan Selayar. Analisis data dalam penelitian ini adalah kondisi aktual sub sektor tanaman pangan, hortikultura dan perkebunan tingkat kecamatan dan tingkat Kabupaten Kepulauan Selayar akan dianalisis secara deskriptif dan hasilnya akan ditampilkan dalam bentuk tabel, grafik dan gambar, Identifikasi upaya akan dianalisis menggunakan metoda SWOT (Strength, Weakness, Opportunity dan Threat. Berdasarkan hasil analisis dan pembahasan diperoleh bahwa berdasarkan hasil analisis SWOT bahwa jumlah skor yang diperoleh dari hasil penjumlahan antara skor penilaian faktor eksternal peluang dan ancaman yaitu 0.80 (1,343 – 0,54). Hasil ini menunjukkan bahwa pengembangan potensi pertanian dan perkebunan mempunyai peluang dalam pengembangan kabupaten mengingat skor berada pada rentang nilai dengan kategori berpeluang pada kuadran 1 yakni strategi pertumbuhan. Strategi pengembangan potensi pertanian dan perkebunan dilakukan dengan meningkatkan hasil produksi tanaman hortikultura khususnya komoditi jeruk, peningkatan strategi pemasaran, pengolahan hasil bahan baku agar memiliki nilai tambah, peningkatan sarana dan prasarana penunjang. Selain itu juga pengembangan kawasan harus disesuaikan dengan fungsi dan potensi wilayah.
PENGARUH INFRASTRUKTUR TERHADAP PERTUMBUHAN EKONOMI KABUPATEN FAKFAK PROVINSI PAPUA BARAT Risma Niswati Tarman; Herdy Pratama Putra; Ahfandi Ahmad
Ensiklopedia of Journal Vol 5, No 3 (2023): Volume 5 No. 3 Edisi 1 April 2023
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (408.748 KB) | DOI: 10.33559/eoj.v5i3.1646

Abstract

Infrastructure is basically a government asset that is built in the context of serving the community. Road and electricity infrastructure have a large, positive and significant influence on economic growth without exception in Fakfak Regency, West Papua. So that it can determine the direction of government policy in infrastructure development that is in accordance with the conditions in Fakfak Regency. This study aims (1) to determine the effect of roads on economic growth in Fakfak District (2) to determine the effect of electricity on economic growth in Fakfak District. This research is a quantitative descriptive study using panel data regression analysis from 2017 to 2021 in Fakfak district. The objects studied include (1) GRDP (economic growth) (2) Infrastructure consisting of: road infrastructure and electricity infrastructure.Keywords: Infrastructure, Panel Data, Growth, Fakfak.
Analisis Penanganan Limbah Konstruksi pada Proyek Pasar Tumburuni di Kabupaten Fakfak: Analysis of Construction Waste Handling at the Tamburuni Market Project in Fakfak Regency Jusmawandi, Jusmawandi; Putra, Herdy Pratama
Media Ilmiah Teknik Lingkungan (MITL) Vol. 9 No. 1 (2024): Media Ilmiah Teknik Lingkungan (MITL)
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33084/mitl.v9i1.6432

Abstract

Construction waste is a threat to the community environment and living creatures around construction projects. It is necessary to handle construction waste appropriately considering that not all materials can be used 100% during the construction process. Construction waste causes hazardous chemical contamination which is the result of a number of hazardous chemicals being applied to building materials, or the discharge of chemicals in the construction and demolition waste stream. This research aims to apply the 3R principle (Reduse, Reuse and Recycle) contained in the Responsible Waste Management Hierarchy structure. Case study of the Tuumburuni Market development project in Fakfak Regency. Tumburuni Market is the first modern market built in Fakfak Regency and has become a role model for other construction projects. Good waste management in the construction process will reduce the impact on the environment. The research method uses survey and interview methods. The data obtained is explained in data tabulation and described based on the Waste Management Hierarchy theory. Research results show that as many as 80% of consumable materials go through a reuse process before finally being thrown away. Meanwhile, 20% of wood waste is not used because it is broken and unfit for use.
Analisis Determinasi Wilayah Kerja dan Pengoperasian Pelabuhan Perikanan Untia Makassar Achmad Setiawan; Syamsul Hadi; Ghaffar, Mukhlisa A; Erna; Burhani, shidik; Andi Ana Humaerah; Herdy Pratama Putra
Jurnal Informasi, Sains dan Teknologi Vol. 8 No. 1 (2025): Juni: Jurnal Informasi Sains dan Teknologi
Publisher : Politeknik Negeri FakFak

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/isaintek.v8i1.329

Abstract

Determining the working and operational areas of a fishing port is very important because it strengthens the existence of a fishing port while supporting port operations. The purpose of this study is to determine the working and operational areas of the Untia fishing port based on the ratio of space utilization in land and water areas. The research method used is quantitative descriptive. Secondary data was obtained through literature surveys and institutional surveys to obtain port design plans and spatial planning plans, while primary data was obtained using satellite imagery and verified directly in the field to obtain geographical coordinates. Analysis was conducted on the position of the Untia port in relation to the provincial spatial planning plan, the physical condition, and the operational aspects of the port. The results obtained include the determination of geographical coordinates for the operational areas on land and water used for the construction and operation of main facilities, functional facilities, and supporting facilities for Untia fishing port. Based on the analysis results, the total operational area of the Untia Fisheries Port is determined to be 232.33 hectares, consisting of a land operational area of 9.8 hectares, a water operational area of 92.84 hectares, a land operational area of 23.56 hectares, and a water operational area of 106.13 hectares.