Analisis Kinerja Jalan Tengkuruk Permai dengan Mikrosimulasi Pemindahan Terminal dan Parkir Badan Jalan Taharudin Subagyo; Melawaty Agustien; Joni Arliansyah
Cantilever: Jurnal Penelitian dan Kajian Bidang Teknik Sipil Vol 10 No 1 (2021): Cantilever
Publisher : Department of Civil Engineering and Planning, Faculty of Engineering, Sriwijaya University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1267.366 KB) | DOI: 10.35139/cantilever.v10i1.96

Abstract

Tengkuruk Permai street is currently used for city transportation terminals, on street parking, access and exit to 16 Ilir market parking lot (off street parking), entrance to Ampera Bridge, passenger access to LRT stations and Skate Park. The various functions of this street caused the reduction in street service levels at certain hours and become a congestion point in Palembang city. This study aims to obtain the results of the analysis of Tengkuruk Permai’s street performance in the scenario conditions of terminal relocation and on street parking. The data were collected directly by measuring and enumeration then micro-simulated with the Vissim software. Vissim microsimulation modeling is carried out in existing conditions and scenarios by combining the 3 (three) floors parking building construction plans, city transport routes, Tengkuruk Permai street which has been cleared of on street parking and terminals, street networks around the research location and intersection arrangements concurrently. The street performance analysis uses the calculation of the V/C ratio, where the calculation of the street capacity uses the Vissim microsimulation output such as speed, density and volume obtained in the link of segment evaluation menu. Capacity determination is using the calculation of relation of flow (q), velocity (v) and density (k). The scenario of relocating the city transport terminal and street parking to the 3 (three) floors parking building plan at 16 Ilir market parking lot can increase the capacity of Tengkuruk Permai Street from 1087,88 pcu/hour/direction to 2295.15 pcu/hour/direction and improve the service level from level E to level A.
Analisis Tingkat Layanan Ruas Jalan dan Persimpangan di Kecamatan Gandus Akibat Pembangunan Jalan Tol Kayu Agung – Palembang - Betung Melawaty Agustien; Debby Yulinar
Cantilever: Jurnal Penelitian dan Kajian Bidang Teknik Sipil Vol 11 No 1 (2022): Cantilever
Publisher : Department of Civil Engineering and Planning, Faculty of Engineering, Sriwijaya University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35139/cantilever.v11i1.56

Abstract

The construction of Musi V Bridge is part of the series of Kapal Betung Toll Road, with the toll road in and out of Social Street which is connected to Lettu Karim Kadir Street. This study aims to obtain the performance of roads and intersections in Gandus District, obtain transportation modeling of traffic movements due to KayuAgung-Palembang-Betung Toll Road interchange, obtain predictions of the performance of roads and intersections resulting from traffic simulation models and provide policy suggestions in the form of strategies and traffic engineering management techniques. Data processing used the 2014 PKJI method and simulation with Vissim program. Results of data processing show that the performance of roads and intersections in existing conditions is still able to accommodate traffic flow, indicated by the degree of saturation that meets 2014 PKJI requirements, namely (DJ ≤ 0.85) with service level C and Vissim simulation results show the largest delay and queue length located in segment 3 (M Amin Fauzi Street -Tph Sofyian Kenawas Street) which is 138.18 meters and 21.02 seconds and on Lettu Karim Kadir Street (Direction of Musi II) of 14.04 seconds and 58.96 meters. After the operation of the Musi V Bridge, there was an increase in traffic volume which resulted in decreased performance of roads and intersections. Therefore, to improve its performance, road widening is carried out. The results of 2014 PKJI analysis showed a decrease in the degree of saturation from 0.43 to 0.35, a delay from 9.02 seconds / cur to 8.22 seconds / cur and the chances of queuing from 8.50 - 20.39% to 6.04 - 15.91% on Lettu Karim Kadir Street (Musi II Direction).