STRATEGI OPTIMASI WAKTU DAN BIAYA MENGGUNAKAN TIME COST TRADE OFF (TCTO) PADA PEMBANGUNAN GEDUNG RUANG KELAS SMPN 1 BESUKI Lutfan Anas Zahir
JURNAL DAKTILITAS Vol. 1 No. 2 (2021): DESEMBER 2021
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (410.885 KB) | DOI: 10.36563/daktilitas.v1i2.442

Abstract

Abstract Time and cost are very influential on success and failure a project. The benchmark for project success is usually seen from the time taken optimally with optimum cost without leaving the quality of the work. Therefore efforts to optimize time and costs are very important in planning a project. One way that can be used to optimize time and cost by calculating the total cost direct declining projects with long durations and insignificant costs direct cost increases with a long duration of direct costs and indirectly get the optimum total cost and optimal time. The Project for Construction of Classroom Building for Juior High School one Besuki will carried out on the land. Structural work on projects started in June 1 2021 is targeted for completion in 6 months, namely in November 2021. This period of time is long enough so that it is possible to accelerated. The method used to accelerate is the Time Cost Trade Off analysis. Acceleration in this study was carried out by additional working hours. By performing critical path compression steps from the Bar Chart in the Ms Project application then the reduction in duration is the optimum can be found. From the results of the calculation analysis study, it can be seen the optimal duration of the project of 122 days with a total cost of Rp. 849.550.435,-because there are delay in implementation for 6 days and when the acceleration of indirect costs a little value can not affect the direct cost. Keywords: Acceleration, Optimazation Cost, Duration, Optimazation, Time Cost Trade Off Abstrak Waktu dan biaya sangat berpengaruh terhadap keberhasilan dan kegagalan suatu proyek. Tolok ukur keberhasilan proyek biasanya dilihat dari waktu yang diambil secara optimal dengan biaya yang optimal tanpa meninggalkan kualitas pekerjaan. Oleh karena itu upaya untuk mengoptimalkan waktu dan biaya sangat penting dalam perencanaan suatu proyek. Salah satu cara yang dapat digunakan untuk mengoptimalkan waktu dan biaya adalah dengan menghitung total biaya proyek penurunan langsung dengan durasi yang lama dan biaya yang tidak signifikan biaya langsung meningkat dengan durasi biaya langsung yang lama dan secara tidak langsung mendapatkan total biaya dan waktu yang optimal. Proyek Pembangunan Gedung Kelas Sekolah Menengah Pertama Negeri 1 Besuki akan dilaksanakan di atas lahan tersebut. Pekerjaan struktural pada proyek yang dimulai pada 1 Juni 2021 ditargetkan selesai dalam 6 bulan, yakni pada November 2021. Jangka waktu tersebut cukup lama sehingga memungkinkan untuk dipercepat. Metode yang digunakan untuk mempercepat adalah analisis Time Cost Trade Off. Percepatan dalam penelitian ini dilakukan dengan penambahan jam kerja. Dengan melakukan langkah-langkah kompresi jalur kritis dari Bar Chart di aplikasi Ms Project maka pengurangan durasi yang optimal dapat ditemukan. Dari hasil studi analisis perhitungan dapat diketahui durasi optimal proyek 122 hari dengan total biaya Rp. 849.550.435,-karena ada keterlambatan pelaksanaan selama 6 hari dan bila percepatan biaya tidak langsung sedikit nilainya tidak dapat mempengaruhi biaya langsung. Kata kunci: Akselerasi, Biaya Optimasi, Durasi, Optimasi, Time Cost Trade Off
ALGORITMA HARMONY SEARCH UNTUK MENYELESAIKAN MASALAH PENJADWALAN KONSTRUKSI REHABILITASI PUSKESMAS BESUKI Lutfan Anas Zahir
JURNAL DAKTILITAS Vol. 1 No. 1 (2021): JUNI 2021
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (406.561 KB) | DOI: 10.36563/daktilitas.v1i1.398

Abstract

Abstract Construction schedule is an entire blueprint of how a project will be executed and by when. Aconstruction schedule outlines project timeframes/ milestones and tracks project progress tokeep everything on-time and on-budget. It's the backbone of any thriving project managementfor construction. Solving the scheduling problem can be accommodated using mathematicaloptimization modeling methods. Based on this, the writer aims to solve the schedulingoptimization problem by using the harmony algorithm. The Harmony Search Algorithm is analgorithm inspired by the process of searching for a combination of tones to obtain beautifulmusical harmonies. This is the same as the optimization process which seeks the optimalsolution based on the objective function, namely minimizing the project duration which greatlyaffects project management. The results obtained show that the smaller the number ofharmony memory and the greater the mutation and maxitization, the closer the solution is tothe optimal solution. Based on the results of these calculations, the most optimal solution orthe minimum project completion duration is five weeks. This also affects the number ofiterations and the number of assignments, so the more iterations the results will be closer tothe optimal value. AbstrakPenjadwalan konstruksi adalah keseluruhan cetak biru tenatang bagaimana dan sampaikapan proyek akan dilaksankan. Penjadwalan menguraikan kerangka waktu/ pencapaianproyek dan melacak kemajuan proyek untuk menjaga ketepatan waktu dan sesuai anggaran,hal ini merupakan landasan setiap manajemen proyek dalam menyelesaikan konstruksinya.Penyelesaian permasalahan penjadwalan tersebbut dapat diakomodir menggunakan metodepemodelan optimasi matematika. Berdasarkan hal tersebut penulis bertujuan untukmenyelesaikan masalah optimasi penjadwalan dengan menggunakan algoritma harmony.Algoritma Harmony Search adalah algoritma yang terinspirasi dari proses pencarianperpaduan nada agar memperoleh harmoni musik yang indah. Ini sama halnya dengan prosesoptimasi yang mencari solusi yang optimal berdasarkan fungsi tujuannya yaitu peminimilandurasi proyek yang sangat berengaruh terhadap manajemen proyek.. hasil yang diperolehmenunjukan bahwa semakin kecil jumlah harmony memory dan semakin besar mutation sertamaxiterasi maka solusi yang didapatkan semaking mendekati solusi yangoptimal.Berdasasrkan hasil perhitungan tersebut didapatkan solusi yang paling optimal ataudurasi penyelesaian proyek paling minimum adalah 5 minggu. Hal ini juga beremngaruhterhadap banyak iterasi dan jumlah penugasan, maka semakin banyak iterasi maka hasil akansemakin mendekati nilai optimal.
ANALISISA AKTIVITAS MANAJEMEN KONSTRUKSI PADA PROYEK LABORATORIUM BAHASA DAN KOMPUTER SMP NEGERI 1 BESUKI Lutfan Anas Zahir; Danang Hadi Nugroho
JURNAL DAKTILITAS Vol. 2 No. 1 (2022): JUNI 2022
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36563/daktilitas.v2i1.532

Abstract

Abstract Managementㅤinㅤaㅤworkㅤjobㅤisㅤveryㅤimportantㅤtoㅤconsiderㅤinㅤtheㅤfieldㅤofㅤworkㅤcurrently growingㅤ rapidly.ㅤ Constructionㅤ managementㅤ isㅤ anㅤ organizationㅤ orㅤ individualㅤ thatㅤ isㅤ multi-disciplinary.ㅤConstructionㅤManagementㅤcanㅤconsistㅤofㅤbusinessㅤentitiesㅤthatㅤrequireㅤhumanㅤresourcesㅤwhoㅤareㅤexpertsㅤinㅤtheirㅤrespectiveㅤfieldsㅤwhoㅤneedㅤaㅤPOACㅤ(Planning,ㅤOrganizing,ㅤㅤ Actuating,ㅤandㅤ Controlling)ㅤ byㅤ beingㅤ systematicㅤ andㅤ measurable. Atㅤpresentㅤ theㅤJuniorㅤ Highㅤ Schoolㅤ1 BesukiㅤinㅤCentralㅤJavaㅤisㅤunderwayㅤinㅤtheㅤLanguageㅤ Laboratoryㅤ Projectㅤ locatedㅤ inㅤ theㅤ southernㅤ partㅤ ofㅤ School.ㅤ Theㅤ researchㅤ methodㅤ usedㅤ inㅤ thisㅤ researchㅤ isㅤ literatureㅤ reviewㅤ fromㅤ variousㅤ sourcesㅤ thatㅤ discuss.ㅤ Dataㅤ obtainedㅤ fromㅤ fillingㅤ outㅤ questionnairesㅤ ㅤ byㅤ ㅤ respondentsㅤ ㅤ involvedㅤ ㅤ inㅤ ㅤ theㅤ ㅤ Schoolㅤ Languageㅤ Laboratoryㅤ Project.ㅤ Theㅤ questionnaireㅤ usedㅤ wasㅤ 15ㅤ respondentsㅤ whoㅤ answeredㅤ theㅤ questionnaire. Theㅤresultsㅤofㅤtheㅤanalysisㅤofㅤtheㅤworkㅤmanagementㅤsystemㅤconstructionㅤfactorsㅤinㅤ ㅤ theㅤ Juniorㅤ Highㅤ Schoolㅤ Languageㅤ Laboratoryㅤ Projectㅤ ㅤ constructionㅤ ㅤ projectㅤ ㅤ areㅤ theㅤ mostㅤ ㅤ dominantㅤ ㅤ atㅤ theㅤ stageㅤ ofㅤ actuating,ㅤ ㅤ whileㅤ theㅤ analysisㅤ ㅤ ofㅤ theㅤ actionsㅤ takenㅤ byㅤ constructionㅤ ㅤ managementㅤ ㅤ toㅤ controlㅤ time,ㅤ cost,ㅤ andㅤ qualityㅤ isㅤ theㅤ mostㅤ dominantㅤ stageㅤ controlling. Keywords: Analysis, Construction Management, POAC, Development, Efficiency Abstrak Manajemenㅤ dalamㅤmengelolaㅤsuatuㅤkegiatanㅤpekerjaanㅤkonstruksiㅤsangatㅤ ㅤ ㅤ diperlukanㅤ mengingatㅤ ㅤ usahaㅤ ㅤ diㅤ bidangㅤ ㅤ konstruksiㅤ ㅤ saatㅤ ㅤ iniㅤ semakinㅤ ㅤ berkembangㅤ ㅤ pesat.ㅤ ㅤ Manajemenㅤ ㅤ konstruksiㅤ merupakanㅤ ㅤ suatuㅤ ㅤ organisasiㅤ ㅤ atauㅤ peroranganㅤ ㅤ yangㅤ ㅤ bersifatㅤ ㅤ multiㅤ ㅤ disiplin.ㅤ ㅤ Manajemenㅤ ㅤ Konstruksiㅤ dapatㅤ berupa badanㅤ usahaㅤ yangㅤ didalamnyaㅤ diperlukanㅤ sumberㅤ dayaㅤ manusiaㅤ yangㅤ ahliㅤ dibidangnyaㅤ masing-masingㅤ yangㅤ mencakupㅤ POACㅤ (Planning,ㅤ Organizing,ㅤ Actuating,ㅤ danㅤ Controling)ㅤ secaraㅤ sistimatisㅤ danㅤ terukur. Saatㅤ iniㅤ SMPㅤ Negeriㅤ 1ㅤ Bandungㅤ ㅤ sedangㅤ dilakukanㅤ proyekㅤ laboratoriumㅤ Komputerㅤ danㅤ Bahasaㅤ letaknyaㅤ ㅤ diㅤ centerㅤ bangunanㅤ sekolah.ㅤMetodeㅤpenelitianㅤ ㅤ yang digunakanㅤ ㅤ dalamㅤ dalamㅤ penelitianㅤ ㅤ iniㅤ adalahㅤ denganㅤ kajianㅤ pustakaㅤ dariㅤ berbagaiㅤsumberㅤ yangㅤ berkaitan.ㅤDataㅤ yangㅤ didapatkanㅤ ㅤ berasalㅤ ㅤ dariㅤ ㅤ pengisian ㅤ kuisionerㅤolehㅤ respondenㅤ yangㅤterlibatㅤdalamㅤproyekㅤLaboratoriumㅤ Bahasaㅤ danㅤ Komputer.ㅤ Kuisionerㅤyangㅤ digunakanㅤ sebanyakㅤ 15ㅤ respondenㅤ yangㅤ berpartisipasiㅤ dalamㅤ pengisianㅤ kuesioner. Hasilㅤ analisisㅤ mengenaiㅤ faktorㅤ faktorㅤ sistemㅤ kerjaㅤ manajemenㅤ konstruksiㅤ padaㅤ proyekㅤ pembangunanㅤGedungㅤlaboratoriumㅤ KomputerㅤdanㅤBahasaㅤyangㅤpalingㅤdominanㅤadalahㅤpadaㅤ tahapanㅤpelaksanaan,ㅤsedangkanㅤanalisisㅤmengenaiㅤtindakan-tindakanㅤyangㅤdilakukanㅤmanajemenㅤkonstruksiㅤuntukㅤpengendalianㅤwaktu,ㅤbiaya,ㅤdanㅤmutuㅤyangㅤpalingㅤ ㅤ dominanㅤadalahㅤtahapanㅤpengendalian Kata kunci: Analisis, Manajemen Konstruksi, POAC, Development, Efisiensi
IMPLEMENTASI PEMODELAN MATEMATIKA MENGGUNAKAN ALGORITMA GENETIKA DALAM MENYELESAIKAN PERMASALAHAN PENJADWALAN PROYEK KONSTRUKSI BANGUNAN LUTFAN ANAS ZAHIR; KRISNA ACHMAD SUHUDI
JURNAL DAKTILITAS Vol. 3 No. 2 (2023): DESEMBER 2023
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36563/daktilitas.v3i2.962

Abstract

ABSTRACT The development of digitalization has accelerated since the covid-19 pandemic that hit the world in 2019.The role of digitalization in the economy is increasingly important, and is one of the enabling factors to increaseeconomic competitiveness in a country. Indonesia realizes the importance of digitalization for a country so that ithas initiated the mainstreaming of digital transformation and the implementation of the Strategic Priority Project(Major Project) "Information and Communication Technology Infrastructure to Drive Digital Transformation".The rapid development of technology provides many options for a construction service company to determine themethods and tools of Metaheruistic search algorithms that can be modeled or adapted to various problemsincluding scheduling. This scheduling system aims to minimize the average value of cost deviations. Critical pathmethod (CPM) is used to minimize cost deviation. Critical path analysis produces a length of time intended forcompletion of the project work duration. Determination of the critical path in this study using Genetic Algorithm.The results of the research on the data of 20 jobs with 3 constraint functions of duration, predecessor, and costobtained optimal critical path results with the critical path sequence ['D', 'A', 'B', 'G', 'C', 'E', 'H', 'F', 'K', 'I', 'L','J', 'M', 'N', 'O', 'P', 'Q', 'R', 'T', 'S']. Optimal Project Duration: 78 and Optimal Project Cost: 64000.Keywords: Critical Path Method (CPM), Genetic Algorithm, , Optimization, Scheduling,VScode. ABSTRAK Digitalisasi telah berkembang lebih cepat sejak pandemi COVID-19 melanda dunia pada 2019.Digitalisasi menjadi semakin penting dalam ekonomi dan merupakan salah satu komponen yang dapatmeningkatkan daya saing ekonomi suatu negara. Indonesia telah memulai pengarusutamaan transformasi digitaldan memulai Proyek Prioritas Strategis "Infrastruktur Teknologi Informasi dan Komunikasi untuk MendorongTransformasi Digital" sebagai bukti kesadaran negara akan pentingnya digitalisasi. Perkembangan teknologiyang semakin cepat memberikan banyak opsi bagi sebuah perusahaan jasa konstruksi untuk menentukan metodedan alat/ tools algoritma Metaheruistic pencarian yang dapat dimodelkan atau di adaptasikan pada berbagaipersamalahan termasuk pada penjadwalan. Sistem penjadawalan ini bertujuan untuk meminimalkan nilai rata –rata penyimpangan biaya. Metode jalur kritis atau Critical Path Method (CPM) digunakan untuk meminimalisirpenyimpangan biaya. Analisis lintasan kritis menentukan berapa lama waktu yang diperlukan untukmenyelesaikan proyek. Algoritma Genetika digunakan untuk menentukan garis besar penelitian ini. Hasilpenelitian pada data 20 pekerjaan dengan 3 fungsi kendala durasi, predesesor, dan cost memperoleh hasil criticalpath yang optimal dengan hasil urutan critical path ['D', 'A', 'B', 'G', 'C', 'E', 'H', 'F', 'K', 'I', 'L', 'J', 'M', 'N', 'O', 'P','Q', 'R', 'T', 'S']. Durasi optimal Project Duration: 78 dan Optimal Project Cost: 64000.Kata kunci: Algoritma Genetika, Critical Path Method (CPM), Optimasi, Penjadwalan, VScode.
OPTIMASI KUAT TEKAN BETON DENGAN JARINGAN SYARAF TIRUAN METODE MULTI LAYER PERCEPTRON LUTFAN ANAS ZAHIR; SULIANA MAFIROH
JURNAL DAKTILITAS Vol. 4 No. 1 (2024): JUNI 2024
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36563/daktilitas.v4i01.1161

Abstract

Abstract The optimization of concrete compressive strength is crucial for the development of durable and high-performance concrete structures. Thisㅤstudyㅤinvestigatesㅤthe applicationㅤof Artificial NeuralㅤNetworksㅤ(ANN) using Multi-Layer Perceptron (MLP) regression techniques to optimize the mix design of concrete. By leveraging MLP, a type of ANN known for its ability to model complex non-linear relationships, we aim to predict and enhance the compressiveㅤstrength of concrete based on various mix proportions. The study utilizes a dataset comprising different mix designs, including cement, water, aggregates, and admixtures. The MLP model is trained and validated using this dataset, demonstrating its capability to accurately predict concrete compressive strength. Results indicate that the MLP-based ANN model outperforms traditional mix design methods, providing more precise and reliable predictions. This approach not only enhancesㅤtheㅤunderstandingㅤofㅤtheㅤrelationships between mix components and compressive strength but also offers a robust tool for engineers to optimize concrete mixes effectively. The findings highlight the potential of integrating advanced computational techniques in civil engineering to achieve superior material performance.. Keywords: Optimization, Artificial Neural Networks, Multi-Layer Perceptron, Concrete Mix Design, Construction Materials Abstrak Optimasi kuat tekan beton sangat penting untuk pengembangan struktur beton yang tahan lama dan berkinerja tinggi. Studi ini meneliti penerapan Jaringan Syaraf Tiruan (JST) menggunakan teknik regresi Multi-Layer Perceptron (MLP) untuk mengoptimalkan desain campuran beton. Dengan memanfaatkan MLP, jenis JST yang dikenal karena kemampuannya untuk memodelkan hubungan non-linear yang kompleks, kami bertujuan untuk memprediksi dan meningkatkan kuat tekan beton berdasarkan berbagai proporsi campuran. Studi ini menggunakan dataset yang terdiri dari berbagai desain campuran, termasuk semen, air, agregat, dan bahan tambahan. Model MLP dilatih dan divalidasi menggunakan dataset ini, menunjukkan kemampuannya untuk memprediksi kuat tekan beton dengan akurat. Hasil penelitian menunjukkan bahwa model JST berbasis MLP mengungguli metode desain campuran tradisional, memberikan prediksi yang lebih tepat dan andal. Pendekatan ini tidak hanya meningkatkan pemahaman tentang hubungan antara komponen campuran dan kuat tekan, tetapi juga menawarkan alat yang kuat bagi para insinyur untuk mengoptimalkan campuran beton secara efektif. Temuan ini menyoroti potensi integrasi teknik komputasi canggih dalam teknik sipil untuk mencapai kinerja material yang unggul Kata kunci: Optimasi, Jaringan Syaraf Tiruan, Multi-Layer Perceptron, Desain Campuran Beton, Material Konstruksi
Socialization and Implementation Restructuring Pseudo Thinking Process for Solving Geometry Problem in Tutoring Institutions Lutfan Anas Zahir; Marlena
JANITA : JURNAL PENGABDIAN KEPADA MASYARAKAT Vol. 2 No. 1 (2022)
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat Universitas Tulungagung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36563/pengabdian.v2i1.499

Abstract

Abstrak Perkembangan media pembelajaran saat ini sangatㅤvariatif, namunㅤdari segi pemahaman siswa memiliki banyak variasidaya tangkap yang berbeda-bedaㅤdan mengakibatkan miss concept hinggaㅤpseudo-thinking. Tujuan dari sosialisasi danㅤimplementasi ini adalah untuk memberikanㅤpelatihan bagi pendidik dalam melihatㅤproses berpikir siswa sekaligus menyusun prosesㅤberpikirㅤsiswa yang mengalami pseudoㅤthink. PendekatanㅤSosialisasi dan Implementasi ini merupakan pendekatanㅤkualitatif denganㅤtipe deskriptif dari sampel siswa. Mahasiswa yang menjadi subjekㅤpelatihan adalah mahasiswa kelas IX dari Lembaga Bina Mandiri Tulungagung yangㅤberjumlah tiga orang mahasiswa. Mengambil mata pelajaran berdasarkan hasil tes yang telah dilakukan. Metode Pengumpulan data dalam penelitianㅤiniㅤmeliputi: lembar soal tes dan lembar Wawancara. Kemudian data tersebut dianalisis dan dideskripsikan sesuai dengan langkah-langkah untuk mendiagnosis seseorang denganㅤpseudo-thinking atau yang dilakukanㅤoleh semua guruㅤmatematika. Hasil implementasi menunjukkan (1) Berpikir semu dalam menyelesaikan masalah garis singgung lingkaran adalah ketika memahamiㅤmasalah siswa mampuㅤmengungkapkan informasi yangㅤdiketahui dan ditanyakan. Padaㅤperencanaan pemecahan masalah siswa tidak dapatㅤmenyebutkan rencana yang akan digunakan untuk memecahkan masalah, hanyaㅤmengungkapkan konsepnya. Pada tahap pelaksanaanㅤrencana pemecahan masalah, siswa hanya mampu menyelesaikanㅤmasalah dengan menggunakan konsep yang menurut mereka benarㅤdengan contoh yangㅤdiberikan guru. Padaㅤtahap pengecekan ulang siswa belum dapatㅤmembenarkan jawaban yang benar. Namun setelah mendapatkan restrukturisasiㅤsiswa dapat memperbaiki kesalahanㅤsetelah memahami konsep dengan benar. (2) Penerapanㅤrestrukturisasi pada siswa yangㅤmengalami berpikir semu dapat memberikanㅤsusunan struktur berpikir yang semula kurang dan menyempit menjadi strukturㅤberpikir yang utuh, sehinggaㅤsiswa dapat menyelesaikan masalah matematika secaraㅤterstruktur danㅤbenar. Abstract The development of learning media are currently very varied, but in terms of students' understanding, they have many variety of different grasping powers and result in miss conception until pseudo-thinking.The purpose of this socialization and implementation is to provide training for educators in seeing students' thinking processes while at the same time structuring the thinking processes of students who experience pseudo think.This Sicoalization and Implementation approach is aqualitative approach with a descriptive type from sample students.The student subjects for the training are 9 the grade of student from the Tutoring Institution of Tulungagung amounted of three students. Taking the subject based on the results of the test that have been carried out.Method Data collection in this study includes:tes question sheets for meet indicator and sheets Interview.Then the data are analyzed and described according to the steps to diagnose someone with pseudo-thinking or what all mathematics teachers do.The implementation results show(1)Pseudo-thinking in solving The problem of tangent circle is when understanding the problem students are able to disclose known and inquired information on planning problem solving students are not able to mention the plan which will be used to solve the problem, only to reveal the concept. At the stage of implementing the problem solving plan,students are only able to solve problems using concepts that they think are correct with the example of the teacher. At the stage of rechecking the students have not able to justify the correct answer. But after getting restructuring students can correct mistake after understanding the concept correctly. (2)The application of restructuring to students who experience pseudo thinking can provide an arrangement of thinking structures that are initially lacking and narrow into a complete thinking structure so that students can solve mathematical problems in a structured and correct manner.
JARINGAN SARAF TIRUAN (NEURAL NETWORK) UNTUK ESTIMASI PRODUKTIVITAS PEKERJA KONSTRUKSI LUTFAN ANAS ZAHIR; MOHAMMAD MUHLIS
JURNAL DAKTILITAS Vol. 2 No. 2 (2022): DESEMBER 2022
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract The development of the construction sector in Indonesia requires more effective approaches to improve productivity and efficiency. Estimating construction worker productivity, influenced by factors such as experience, education, and motivation, is often inaccurate with traditional methods. Neural Networks (Artificial Neural Networks) have emerged as a more advanced solution to enhance these estimations. This research analyzes Neural Network models and implements technology-based solutions to predict construction worker productivity. By utilizing the MLPRegressor model from scikit-learn and Neural Network models based on TensorFlow/Keras, this study aims to generate more accurate predictions. Initial results indicate that Neural Networks outperform traditional methods, achieving a Mean Squared Error (MSE) of 0.5 and an R² score of 0.85. The research also employs scipy.optimize methods to find the optimal combination of input variables, such as experience, motivation, and education, to meet specific productivity targets. This study provides a significant contribution to the application of machine learning techniques to improve the accuracy and efficiency of productivity estimation in the construction industry, while also paving the way for further development in optimizing worker performance. Keywords: Machine Learning, MLPRegressor Model, Neural Network, Productivity Estimation, TensorFlow Keras Abstrak Pembangunan sektor konstruksi di Indonesia membutuhkan pendekatan yang lebih efektif untuk meningkatkan produktivitas dan efisiensi. Estimasi produktivitas pekerja konstruksi, yang dipengaruhi oleh faktor-faktor seperti pengalaman, pendidikan, dan motivasi, sering kali tidak akurat dengan metode tradisional. Neural Network (Jaringan Saraf Tiruan) muncul sebagai solusi yang lebih canggih untuk memperbaiki estimasi ini. Penelitian ini menganalisis model Neural Network dan mengimplementasikan solusi berbasis teknologi tersebut untuk memperkirakan produktivitas pekerja konstruksi. Dengan memanfaatkan model MLPRegressor dari scikit-learn serta model Neural Network berbasis TensorFlow/Keras, penelitian ini bertujuan menghasilkan prediksi yang lebih akurat. Hasil awal menunjukkan bahwa Neural Network memberikan performa lebih baik, dengan Mean Squared Error (MSE) sebesar 0.5 dan R² score 0.85, dibandingkan dengan metode tradisional. Penelitian juga menggunakan metode scipy.optimize untuk menemukan kombinasi optimal dari variabel input seperti pengalaman, motivasi, dan pendidikan guna mencapai target produktivitas tertentu. Penelitian ini memberikan kontribusi penting dalam penerapan teknik machine learning untuk meningkatkan akurasi dan efisiensi estimasi produktivitas di industri konstruksi, serta membuka peluang pengembangan lebih lanjut untuk optimisasi kinerja pekerja. Kata kunci: Estimasi Produktivitas, Machine Learning, Model MLPRegressor, Neural Network, TensorFlow Keras
EVALUASI DAMPAK LINGKUNGAN DARI PROYEK PEMBANGUNAN JALUR LINTAS SELATAN DI TULUNGAGUNG ALDA WIDYA SAPUTRA; PRASETYA ARIE HENDRAYANSYAH; LUTFAN ANAS ZAHIR
JURNAL DAKTILITAS Vol. 4 No. 2 (2024): DESEMBER 2024
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36563/daktilitas.v4i2.1372

Abstract

Abstract One of the objectives of road infrastructure development, particularly the Jalur Lintas Selatan (JLS) in Tulungagung, East Java, is to improve connectivity and economic growth in the southern coastal region of Java.However, major attention has been paid to the environmental impacts that the project will have. Using primarydata from field surveys and interviews, as well as secondary data from relevant literature, this study aims toevaluate the environmental impacts of the JLS construction. The results showed that construction waste degradedthe water quality around the project and increased air pollutants such as CO, NOx, and PM10. In addition, noisehas exceeded the safe limit for health. The conclusion is that although this infrastructure has a positive impact onthe local economy, better environmental management is needed to mitigate its adverse effects. With the use ofenvironmentally friendly technologies and good waste management, the advancement of infrastructure is expectedto be balanced with the welfare of the environment. Keywords: Southern Expressway; environmental impact; air quality; water quality; sustainable development. Abstrak Salah satu tujuan pembangunan infrastruktur jalan, terutama Jalur Lintas Selatan (JLS) di Tulungagung, Jawa Timur, adalah untuk meningkatkan konektivitas dan pertumbuhan ekonomi di wilayah pesisir selatan Jawa.Namun, perhatian utama telah diberikan pada dampak lingkungan yang akan ditimbulkan oleh proyek tersebut.Dengan menggunakan data primer dari survei lapangan dan wawancara, serta data sekunder dari literatur yangrelevan, penelitian ini bertujuan untuk mengevaluasi dampak lingkungan dari pembangunan JLS. Hasil penelitianmenunjukkan bahwa limbah konstruksi menurunkan kualitas air di sekitar proyek dan meningkatkan polutanudara seperti CO, NOx, dan PM10. Selain itu, kebisingan telah melampaui batas aman bagi kesehatan.Kesimpulannya adalah bahwa meskipun infrastruktur ini berdampak positif pada ekonomi lokal, diperlukanpengelolaan lingkungan yang lebih baik untuk mengurangi efek buruknya. Dengan penggunaan teknologi ramahlingkungan dan pengelolaan limbah yang baik, kemajuan infrastruktur diharapkan dapat diseimbangkan dengankesejahteraan lingkungan. Kata Kunci : Jalur Lintas Selatan;dampak lingkungan;kualitas udara;kualitas air;pembangunan berkelanjutan.
PERBANDINGAN KINERJA PADA PONDASI DANGKAL DAN PONDASI DALAM PADA BANGUNAN DI DAERAH RAWAN GEMPA Alvinda Heilminavaza Elwava; Desti Refika Putri; Lutfan Anas Zahir
JURNAL DAKTILITAS Vol. 5 No. 1 (2025): JUNI 2025
Publisher : PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS TULUNGAGUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36563/daktilitas.v5i1.1647

Abstract

Abstract The foundation is an important element in building construction which functions to distribute the load to the ground below. In earthquake-prone areas, choosing the type of foundation is crucial to ensure building stability. This research compares the performance of shallow foundations and deep foundations based on literature studies. The results show that deep foundations are superior in dealing with dynamic loads due to earthquakes because of their ability to distribute loads to deeper and more stable soil layers. However, shallow foundations can still be used in stable soil conditions with light structural loads. The main recommendation is the use of deep foundations or a combination of methods such as pile-raft foundations to increase the stability of the building. Keywords: backfill sand; continuous foundation; construction; stability; burden Abstrak Pondasi merupakan elemen penting dalam konstruksi bangunan yang berfungsi menyalurkan beban ke tanah di bawahnya. Di daerah rawan gempa, pemilihan jenis pondasi menjadi krusial untuk menjamin stabilitas bangunan. Penelitian ini membandingkan kinerja pondasi dangkal dan pondasi dalam berdasarkan studi pustaka. Hasil menunjukkan bahwa pondasi dalam lebih unggul dalam menghadapi beban dinamis akibat gempa karena kemampuannya menyalurkan beban ke lapisan tanah yang lebih dalam dan stabil. Namun, pondasi dangkal tetap dapat digunakan pada kondisi tanah yang stabil dengan beban struktur yang ringan. Rekomendasi utama adalah penggunaan pondasi dalam atau kombinasi metode seperti pondasi tiang-rakit untuk meningkatkan stabilitas bangunan. Kata kunci: pasir urug; pondasi menerus; konstruksi; stabilitas; beban