Optimalisasi Produktivitas Crawler Crane pada Pekerjaan Pengangkatan Precast Beton Tiang Pancang 35 x 35 cm PT. Wijaya Karya Beton Tbk. Nayla Hanna Ariza; Wulandari Wulandari; Sandi Prayoga; Abdillah Mursyid; Deny Ernawan
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 3 No. 3 (2025): Juli: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipi
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v3i3.985

Abstract

This study aims to optimize the productivity of Crawler Crane heavy equipment in lifting precast concrete structural elements at PT Wijaya Karya Beton Tbk. The method used is a descriptive qualitative approach with data collection through direct observation in the field. The data is based on the equipment's operating cycle time and work efficiency. The results of the study show that the Crawler Crane heavy equipment used by PT Wijaya Karya Beton Tbk. produces a productivity of 20 tons/hour or 160 tons/day for 8 hours with the need for 2 units of crawler crane heavy equipment, resulting in a work efficiency of 80%. So the productivity results from the calculation have been optimal, so it is hoped that the results of this study can be a reference in the management of heavy equipment, especially Crawler Cranes in construction work at the Company PT. Wijaya Karya Beton Tbk.
Pelaksanaan Pengecoran Saluran Peluncur Bangunan Pelimpah Bendungan Cijurey Kabupaten Bogor Provinsi Jawa Barat Sugeng Sutikno; Teguh Imanto; Deny Ernawan
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 3 No. 2 (2025): April: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sip
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v3i2.1099

Abstract

The major work of the Cijurey Dam Project Package III is located in Bogor Regency, West Java Province, which is a spillway structure consisting of iron structures and concrete structures. To achieve the right quality, on time, on cost, and zero accidents, concrete casting calculations and appropriate work implementation methods are required. This research method uses descriptive with quantitative and qualitative approaches. The stages of concrete casting work for the Cijurey Dam spillway structure's launch channel consist of preparation, measuring the launch channel block boundaries, lean concrete work, reinforcement work, formwork panel preparation, formwork panel installation, waterstop and dowel bar work, concrete sampling and slump test, concrete casting, concrete curing/maintenance, formwork dismantling, and finishing of tierod holes. The results of the study showed that the calculations for casting the concrete channel were a large volume of concrete channel casting of 135,000 m3, concrete material requirements (in the form of: 1,115,100 sacks of cement, 58,050 m3 of sand, 1,020,600 m3 of gravel, and 29,025,000 liters of water), channel formwork (surface area) of 27,675 m2, productivity of casting the concrete channel launcher of 24 m3/hour or 193 m3/day, and the efficiency of casting the concrete channel launcher time of around 125% (25% faster than planned). Meanwhile, the stages of work implementation for channel concrete casting include preparation work, measurement work for the boundaries of the launcher channel blocks, lean concrete work, reinforcement work, formwork panel preparation work, formwork lubrication work, formwork panel installation work, waterstop and dowel bar work, concrete sampling and slump test work, channel concrete casting work, concrete curing/maintenance work, formwork dismantling work, and finishing work for tierod holes. In addition, an inter-segment locking system with a shear key is used to overcome problems with the concrete pump, joint inspections are carried out during mobilization, routine inspections, repairs and replacement of the concrete pump.