p-Index From 2020 - 2025
8.069
P-Index
This Author published in this journals
All Journal Jurnal Teknik Industri KERN Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja) Sinergi Jurnal Teknik Sipil Jurnal Sistem dan Manajemen Industri Potensi : Jurnal Sipil Politeknik RACIC : Rab Construction Research CogITo Smart Journal Al Qalam: Jurnal Ilmiah Keagamaan dan Kemasyarakatan Reka Buana : Jurnal Ilmiah Teknik Sipil dan Teknik Kimia Jurnal Rekayasa Konstruksi Mekanika Sipil Jurnal Pensil : Pendidikan Teknik Sipil RADIAL: JuRnal PerADaban SaIns RekAyasan dan TeknoLogi Jurnal Teknik Sipil dan Teknologi Konstruksi Nusantara Science and Technology Proceedings Journal of Civil Engineering and Planning (JCEP) Jurnal Teknik Sipil Cendekia (JTSC) Jurnal VORTEKS Multidiciplinary Output Research for Actual and International Issue (Morfai Journal) Jurnal Al Ulum: LPPM Universitas Al Washliyah Medan Formosa Journal of Multidisciplinary Research (FJMR) Jurnal Talenta Sipil Jurnal Sains dan Teknologi Jurnal Teknik Sipil Jurnal Civil Engineering Study Ranah Research : Journal of Multidisciplinary Research and Development Gema Lingkungan Kesehatan Scientica: Jurnal Ilmiah Sains dan Teknologi Composite: Journal of Civil Engineering Indonesian Journal of Science, Technology, and Humanities Nusantara Journal of Multidisciplinary Science Physical Sciences, Life Science and Engineering Sustainable Civil Building Management and Engineering Journal Journal of Civil Engineering and Vocational Education International Journal of Industrial Innovation and Mechanical Engineering International Journal of Mechanical, Electrical and Civil Engineering International Journal of Mechanical, Industrial and Control Systems Engineering Advance Sustainable Science, Engineering and Technology (ASSET) RADIAL: Jurnal Peradaban Sains, Rekayasa dan Teknologi
Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Teknik Sipil Cendekia (JTSC)

A Comparative Study of Quantity and Scheduling Using 4D BIM and Conventional Methods in Column, Beam, and Slab Construction Muzaffar, Risal; Putra, I Nyoman Dita Pahang; Junianda Velantika, Griselda
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 6 No 2 (2025): July
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51988/jtsc.v6i2.290

Abstract

Inadequacies in the conceptualization and assessment of construction scheduling frameworks can disrupt the epistemic continuity of project execution, thereby undermining procedural coherence and operational efficiency. Accurate and detailed material quantity planning is essential to ensure precise resource forecasting and the development of efficient and reliable construction schedules. This research investigates the role of methodological selection in the accuracy and efficiency of construction planning, with a particular emphasis on material quantification and scheduling outcomes through this comparative framework. The methodological approach undertaken in this study involves quantity surveying practices through the application of two modelling-based techniques, namely CAD-Revit and CAD-Conventional. For construction-shop drawing documentation as the primary data source, material quantities derived from each method serve as the basis for schedule development. This process culminates in the integration of 4D Building Information Modelling to facilitate the temporal visualisation of construction sequences, which supports a more comprehensive evaluation of the implications associated with each quantity derivation method on the accuracy of project planning. The comparative analysis of material quantities derived from the two methods revealed significant fluctuations, with the CAD-Revit approach demonstrating greater efficiency in material usage. This variation was further reflected in the scheduling outcomes, where the 4D BIM methodology indicated divergent timelines for the completion of structural component progress across different floors.
IMPLEMENTASI BIM (BUILDING INFORMATION MODELING) TERHADAP PENINGKATAN EFISIENSI DAN AKURASI PADA PERHITUNGAN ESTIMASI BIAYA PROYEK PEMBANGUNAN JALAN JALUR LINTAS SELATAN (JLS) LOT 3 PANTAI SERANG – SUMBERSIH Maura Muzdhalifa, Rencany; Pahang Putra, I Nyoman Dita; Widowati, Elok Dewi
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 6 No 2 (2025): July
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51988/jtsc.v6i2.323

Abstract

The development of technology has significantly influenced the construction industry, introducing innovations that enhance project execution efficiency and accuracy. One of the notable advancements is Building Information Modeling (BIM) is a digital representation of a building that fully illustrates its form, size, and functional aspectsThis study aims to implement Building Information Modeling (BIM) for Quantity Take Off (QTO) using Autodesk Revit 2025 and compare its results with conventional methods in terms of volume and cost estimation accuracy. The research object is the South Cross Road Construction Project (JLS) Lot 3 from Pantai Serang to Sumbersih. This comparative quantitative study utilizes Detail Engineering Design (DED) documents and 3D modeling with Autodesk Revit 2025. The findings show that BIM-based QTO produces more accurate and efficient cost estimations, especially in complex calculations such as cut and fill operations. The BIM method resulted in a total project cost that was 13.73% higher than the conventional method, primarily due to more precise terrain modeling. This research is expected to be a reference for improving the accuracy of infrastructure project cost estimation.
Co-Authors Adibah Nurul Yunisya Afif, Syahril Nur Khusna Ahmed, Suliman Badawi Alam, Muhammad Miftakhul Alfonsus Fung Abimanyu Wicaksono Amala, Aprilia Suci Amelia Indah Faradilla Anggraeny, Anggi Dwi Anna Rumintang Anwar, Nadjadji Aprilia Regita Tri Cahyani Asyari, Saidatul Alfena Putri Awati, Mawinda Oktrify Bagas Andrian Permana Bambang Trigunarsyah Bambang Trigunarsyah, Bambang Bangun Muljo Sukojo, Bangun Muljo Bawana, Massayu Sekar Budi, Fakhruddin Prasetya Chakim, Ahmad Ibnul Christabella, Cynthia Cielly Christiono Utomo Dewanty, Maharani Putri Dewi, Risda Yasinta Diyasa, I Gede Susrama Mas Dwi Lutfil Khakim Eka Aprillia Erma Suryani Fadillah, Naufal Luthfi Fandini, Reina Maulidya Fatimah, Alifah Siti Hadianto, Usman Haholongan M, Aris Pistar Halim, Ismail Hidayatul Ulumiya I Made Merdana Ilham Arista Harahap Jagad, Sulthanul Auliya Junianda Velantika, Griselda Mahajana, Adam Niestera Mahardini, Hirdayanti Andina Raissha Mahrusah, Safira Manurung, Liza Olivia Maura Muzdhalifa, Rencany Mei Lutfi Yudhitasari Meylinda Sabrinawati Mitasari, Agusvivia Mudjahidin Muttaqin, Muh. Darul Muzaffar, Risal Muzdhalifa, Rencany Maura Natasya, Dininda Nia Dwi Puspitasari Ningtyas, Diah Kurniawati nur hanifah eka putri Panjaitan, Nita Jesika Pebria, Shinta Amyrul Pinky Febrilla Carienta Putri Prasasto, Adi Radityo Prasetyo, Aditya Rachmad Puspita, Milinda Nur Indah Putra, Moch. Maulana Kurnianda Saputra Putri, Ardelia Dewani Putri, Azhahra Divia Rahayu, Jatiningrum Rifky, Fariz Robby Soetanto Romadhoni, Firda Amalia Putri Salim, Abdurrosid Salsabila Aulia Ayu Lestari Putri Ghozali Sampurno, Ilham Ade Widya Santi Dwi Rahmawati Servanty, Izmanaya Avril Setiawan, Nanang Sianturi, Niel Tamsoju Siska Ayu Aprilia Yusuf Stephanie Almeyda Supriyono, Auliyah Shabirah Utami, Imanda Prasetya Velantika, Griselda Junianda Wardana, Zahra Ramadhani Widowati, Elok Dewi Yehezkiel Rivaldo Zetta Rasullia Kamandang