All Journal Jurnal Teknik Industri KERN Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja) Sinergi Jurnal Teknik Sipil Jurnal Sistem dan Manajemen Industri Potensi : Jurnal Sipil Politeknik RACIC : Rab Construction Research CogITo Smart Journal Al Qalam: Jurnal Ilmiah Keagamaan dan Kemasyarakatan Reka Buana : Jurnal Ilmiah Teknik Sipil dan Teknik Kimia Jurnal Rekayasa Konstruksi Mekanika Sipil Jurnal Pensil : Pendidikan Teknik Sipil RADIAL: JuRnal PerADaban SaIns RekAyasan dan TeknoLogi Jurnal Teknik Sipil dan Teknologi Konstruksi Nusantara Science and Technology Proceedings Journal of Civil Engineering and Planning (JCEP) Jurnal Teknik Sipil Cendekia (JTSC) Jurnal VORTEKS Multidiciplinary Output Research for Actual and International Issue (Morfai Journal) Jurnal Al Ulum: LPPM Universitas Al Washliyah Medan Formosa Journal of Multidisciplinary Research (FJMR) Jurnal Talenta Sipil Jurnal Sains dan Teknologi Jurnal Teknik Sipil Jurnal Civil Engineering Study Ranah Research : Journal of Multidisciplinary Research and Development Gema Lingkungan Kesehatan Scientica: Jurnal Ilmiah Sains dan Teknologi Composite: Journal of Civil Engineering Indonesian Journal of Science, Technology, and Humanities Nusantara Journal of Multidisciplinary Science Physical Sciences, Life Science and Engineering Sustainable Civil Building Management and Engineering Journal Journal of Civil Engineering and Vocational Education International Journal of Industrial Innovation and Mechanical Engineering International Journal of Mechanical, Electrical and Civil Engineering International Journal of Mechanical, Industrial and Control Systems Engineering Advance Sustainable Science, Engineering and Technology (ASSET) RADIAL: Jurnal Peradaban Sains, Rekayasa dan Teknologi
Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja)

OPTIMASI PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN METODE LEAST COST SCHEDULING Santi Dwi Rahmawati; I Nyoman Dita Pahang Putra; Anna Rumintang Nauli
Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja) Vol 10 No 1 (2022): Jurnal Ilmiah MITSU
Publisher : Fakultas Teknik, Universitas Wiraraja

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24929/ft.v10i1.1177

Abstract

Along with the development era, more and more construction projects are built to meet all human needs, ranging from residential homes to business premises or the place of service of the general public. In a project generally have a plan and implementation schedule for the implementation of the project can be run in accordance with the desired plan. Therefore, project management is a strategy that needs to be done in achieving the efficiency and effectiveness of a company. Some of the kinds of methods that can be used to accelerate a construction project can be used to optimize cost and schedule. One of the methods that can be used is the method of Least Cost Analysis. The results of the analysis using the method of least cost scheduling, namely for the duration of the acceleration to be 54 days, 10 days faster than the normal duration. As for the cost of acceleration, i.e. Rp. 3,407,624,263.72 is greater than the normal cost of Rp. 2,856,611,621.08. The difference in the cost of the project acceleration with the normal cost is Rp. 551,012,642.64. Based on efficiency then the project is not worth it to do the acceleration.
ANALISA PRODUKTIVITAS DAN BIAYA PENGGUNAAN STRUKTUR KOMPOSIT DAN KONVENSIONAL PELAT LANTAI PADA PROYEK PEMBANGUNAN TAHAP II RSUD DR. M. SOEWANDHIE SURABAYA Pinky Febrilla Carienta Putri; I Nyoman Dita Pahang Putra; Anna Rumintang Nauli; Zetta Rasullia Kamandang
Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja) Vol 11 No 1 (2023): Jurnal Ilmiah MITSU
Publisher : Fakultas Teknik, Universitas Wiraraja

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24929/ft.v11i1.2075

Abstract

Construction development projects have the opportunity to experience delays with various kinds of obstacles and productivity is one of the main factors determining the course of a development. The research in this final project is processing unit price analysis. Method Statement Approval (MSA). Material Approval Submission (MAS). Time Schedule. and Shop Drawing to analyze time. productivity. and cost in the implementation of floor slab composite structure work. The results of the analysis of this study show that the design productivity between composite and conventional plates is the same. For the productivity of bondek work realization 42.17 m²/Day. wiremesh work 3070.68 Kg/Day and concrete work 126.63 m³/Day. The productivity of conventional slab formwork work is 414.34 m²/Day. iron work 2896.77 Kg/Day and concrete work 81.02 m³/Day. The cost required for the design of the composite slab is Rp. 3,192,534,719 and the realization of Rp. 3,048,592,476. While the cost for the work of the conventional plate plan is Rp. 950,640,926 and the realization of Rp. 1,057,220,736.
Co-Authors Adibah Nurul Yunisya Afif, Syahril Nur Khusna Ahmed, Suliman Badawi Alam, Muhammad Miftakhul Alfonsus Fung Abimanyu Wicaksono Amala, Aprilia Suci Amelia Indah Faradilla Anggraeny, Anggi Dwi Anna Rumintang Anwar, Nadjadji Aprilia Regita Tri Cahyani Asyari, Saidatul Alfena Putri Awati, Mawinda Oktrify Bagas Andrian Permana Bambang Trigunarsyah Bambang Trigunarsyah, Bambang Bangun Muljo Sukojo, Bangun Muljo Bawana, Massayu Sekar Budi, Fakhruddin Prasetya Chakim, Ahmad Ibnul Christabella, Cynthia Cielly Christiono Utomo Dewanty, Maharani Putri Dewi, Risda Yasinta Diyasa, I Gede Susrama Mas Dwi Lutfil Khakim Eka Aprillia Erma Suryani Fadillah, Naufal Luthfi Fandini, Reina Maulidya Fatimah, Alifah Siti Hadianto, Usman Haholongan M, Aris Pistar Halim, Ismail Hidayatul Ulumiya I Made Merdana Ilham Arista Harahap Jagad, Sulthanul Auliya Junianda Velantika, Griselda Mahajana, Adam Niestera Mahardini, Hirdayanti Andina Raissha Mahrusah, Safira Manurung, Liza Olivia Maura Muzdhalifa, Rencany Mei Lutfi Yudhitasari Meylinda Sabrinawati Mitasari, Agusvivia Mudjahidin Muttaqin, Muh. Darul Muzaffar, Risal Muzdhalifa, Rencany Maura Natasya, Dininda Nia Dwi Puspitasari Ningtyas, Diah Kurniawati nur hanifah eka putri Panjaitan, Nita Jesika Pebria, Shinta Amyrul Pinky Febrilla Carienta Putri Prasasto, Adi Radityo Prasetyo, Aditya Rachmad Puspita, Milinda Nur Indah Putra, Moch. Maulana Kurnianda Saputra Putri, Ardelia Dewani Putri, Azhahra Divia Rahayu, Jatiningrum Rifky, Fariz Robby Soetanto Romadhoni, Firda Amalia Putri Salim, Abdurrosid Salsabila Aulia Ayu Lestari Putri Ghozali Sampurno, Ilham Ade Widya Santi Dwi Rahmawati Servanty, Izmanaya Avril Setiawan, Nanang Sianturi, Niel Tamsoju Siska Ayu Aprilia Yusuf Stephanie Almeyda Supriyono, Auliyah Shabirah Utami, Imanda Prasetya Velantika, Griselda Junianda Wardana, Zahra Ramadhani Widowati, Elok Dewi Yehezkiel Rivaldo Zetta Rasullia Kamandang