PERENCANAAN STRUKTUR ATAS GEDUNG MEDIC CENTER RUMAH SAKIT MATA UNDAAN KOTA SURABAYA Susanto, Chris Salim; Ray, Norman; Wibowo, Leonardus Setia Budi
Seminar Nasional Ilmu Terapan Vol 2 No 1 (2018): Seminar Nasional Ilmu Terapan (SNITER) 2018
Publisher : Universitas Widya Kartika Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (290.25 KB)

Abstract

Studi Perencanaan Struktur Atas Gedung Medic Center Rumah Sakit Mata Undaan Surabaya dalam penelitian ini menggunakan system rangka pemikul momen menengah (SRPMM) beton bertulang. Perhitungan – perhitungan yang dilakukan dalam penelitian ini disesuaikan dengan peraturan yang ada pada SNI 2847 - 2013, SNI 1726 - 2012 dan PPIUG 1983. Perencanaan yang dilakukan pada penelitian ini meliputi perhitungan komponen struktur yang ada pada bangunan tersebut yaitu antara lain pelat, balok dan kolom. Beban gempa pada struktur dihitung dengan metode respon spektra dan analisa beban static ekivalen sedangkan untuk analisa perhitungan gaya – gaya dalam pada komponen bangunan baik struktur primer maupun sekunder menggunakan bantuan program komputer SAP 2000 sebagai acuan perhitungan dan perencanaan. Material yang digunakan yaitu mutu beton sebesar 25 MPa, sedangkan untuk besi tulangan utama menggunakan mutu baja dengan tegangan leleh 320 Mpa dan 240 Mpa untuk besi tulangan geser.
STUDI PENGARUH VARIASI TIPE PENGAKU DIAGONAL PADA STRUKTUR BANGUNAN BAJA BERTINGKAT TERHADAP PERPINDAHAN LATERAL Halim, Clement Kristianto; Wibowo, Leonardus Setia Budi; Cahyono, Muhammad Shofwan Donny; Ray, Norman
Seminar Nasional Ilmu Terapan Vol 4 No 1 (2020): Seminar Nasional Ilmu Terapan (SNITER) 2020
Publisher : Universitas Widya Kartika Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1088.251 KB)

Abstract

Pada studi ini dilakukan analisis terhadap kinerja struktur bangunan baja bertingkat (5 dan 10 lantai) dengan 3 variasi tipe pengaku diagonal (Inverted V, Single Diagonal dan X-Bracing) dan gedung terbuka. Analisis dilakukang dengan bantuan software SAP 2000 v14. Hasil dari analisis ini akan dibandingkan dari 4 tipe gedung dan 2 jenis ketinggian. Melalui studi analisis ini dilakukan perbandingan perpindahan dan simpangan masing-masing gedung. Gedung dengan tambahan pengaku diagonal memiliki nilai perpindahan yang lebih kecil dibanding struktur gedung terbuka. Gedung dengan tipe pengaku diagonal X-Bracing mampu mereduksi perpindahan paling besar dengan presentase 30,78% untuk gedung 5 lantai dan 25,16% untuk gedung 10 lantai. Taraf kinerja struktur bangunan 5 lantai termasuk dalam Immediate Occupancy untuk semua variasi pengaku diagonal. Hal ini menunjukkan bahwa penggunaan tipe pengaku diagonal X-Bracing paling efektif dapat meningkatkan kekakuan, kekuatan dan stabilitas struktur.
ANALYSIS PUSHOVER PADA BANGUNAN BERTINGKAT BETON BERTULANG 7 LANTAI MENGGUNAKAN METODE FEMA-356 Zebua, Dermawan; Wibowo, Leonardus Setia Budi; Cahyono, M. Shofwan Donny; Ray, Norman
Seminar Nasional Ilmu Terapan Vol 4 No 1 (2020): Seminar Nasional Ilmu Terapan (SNITER) 2020
Publisher : Universitas Widya Kartika Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1133.638 KB)

Abstract

Negara Indonesia merupakan wilayah yang rawan terjadi gempa. Gempa bumi yang diakibatkan oleh pergerakan lempeng bumi merupakan penyebab terbesar dari gempa yang akan menimbulkan kerusakan pada struktur gedung. Gempa bumi yang terjadi di Indonesia sering kali memakan korban jiwa. Namun, dapat dipastikan bahwa penyebab adanya korban jiwa bukan diakibatkan secara langsung oleh gempa, tetapi diakibatkan oleh rusaknya bangunan yang menyebabkan keruntuhan pada bangunan tersebut.Tujuan penulisan penelitian adalah menentukan kriteria kinerja seismik struktur gedung universitas dari hasil nilai performance point menggunakan metode FEMA-356, memperlihatkan skema kelelehan (distribusi sendi plastis) yang terjadi dari hasil perhitungan program software, mengetahui pola keruntuhan bangunan sehingga dapat diketahui joint-joint yang mengalami kerusakan dan mengalami kehancuran dari analisis pushover.Dari hasil penelitian, Struktur bangunan mampu memberikan perilaku nonlinear yang ditunjukkan fase awal dan mayoritas terjadinya sendi-sendi plastis terjadi pada elemen balok baru kemudian elemen kolom. Level kinerja struktur masuk kriteria operasional yang berarti terjadi kerusakan kecil pada struktural dan bangunan dapat segera digunakan kembali.
ANALISIS ESTIMASI BIAYA DAN WAKTU PROYEK PADA GEDUNG 5 LANTAI UNIVERSITAS X DI SURABAYA Ricardo Salim; Cahyono, M. Shofwan Donny; Norman Ray
Seminar Nasional Ilmu Terapan Vol 8 No 1 (2024): Vol 8 No 1 (2024): Seminar Nasional Ilmu Terapan (SNITER) 2024
Publisher : Universitas Widya Kartika Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

construction industry is known for its complex and dynamic nature, making project management a very important aspect to ensure time and cost effectiveness. Although project management is very important, many construction projects in Indonesia still experience delays, which can result in significant financial losses and damage to the company's good name. This research aims to examine the application of descriptive analysis in analyzing construction project management practices inIndonesia, with a focus on identifying schedule and cost analysis estimates at University X in Surabaya. This research uses a qualitative research approach, involving interviews with construction parties directly involved in the field. The data collected was then analyzed using descriptive analysis, which involved scheduling estimates using Microsoft Project tools. The research results show that poor planning, insufficient resources, and ineffective communication are among the factors that contributeto construction project delays. The research also found that the effective schedule and cost by eliminating delay factors on this project was 32 weeks and IDR 33,566,78,158, then methods and alternatives that can be applied according to actual conditions in the field are accelerating work that is on the critical path. The research results show that the implementation of these strategies and methods can produce a project schedule that is 2 weeks faster. The contributions of this research includeproviding an in-depth look at the factors that contribute to construction project delays and proposing practical strategies to speed up schedules. The results of this research can provide information to project managers and construction practitioners on how to improve their project management practices and achieve better results.
IDENTIFIKASI MATRIKS ASAL DAN TUJUAN PENUMPANG BUS BRT RUTE MOJOKERTO- SURABAYA Salim, Ricardo; Cahyono, M. Shofwan Donny; Intan, Reynaldo Pratama; Norman Ray
Jurnal Anggapa Vol 4 No 1 (2025): ANGGAPA Volume 3 No 1 April 2025
Publisher : Faculty of Engineering, Widya Kartika University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61293/anggapa.v4i1.826

Abstract

Dengan bertingkatnya jumlah penduduk kota Surabaya,Sidoarjo, Mojokerto dan Gresik tingkat mobilisasi juga meningkat seiring berjalannya waktu. Angkutan umum sebagai bagian dari sistem transportasi umum merupakan bagian yang sudah tak terelakkan dari dunia masyarakat. Masyarakat memerlukan sarana untuk berpindah dari satu tempat ke tempat yang lainnya yang nyaman dan teratur agar tidak menghambat pergerakan. Transjatim merupakan salah satu sistem layanan transportasi berupa bus transit pada jaringan antar kota di Jawa Timur. Tujuan dari studi ini untuk mengetahui tendensi pergerakan penumpang transjatim koridor I Sidoarjo-Surabaya-Gresik, koridor II Surabaya - Mojokerto dengan kapasitas 20 tempat duduk dengan load factor 80-100%, mengetahui matriks asal tujuan subjek penelitian, serta mengetahui apakah ada perbedaan diantara populasi bus trans jatim. Metode penelitian dilakukan dengan cara terlibat langsung di lapangan, survei langsung dalam setiap halte pada semua koridor tersebut untuk mendapat data yang diperlukan seperti asal naik penumpang dan tujuan yaitu dimana setiap penumpang turun dari trans jatim.
Analisis Metode Perbaikan Pondasi Bendungan Di Tinjau Dari Segi Biaya Dan Waktu (Studi Kasus Bendungan Jragung Kabupaten Semarang) Siswadi, Siswadi; Donny Cahyono, Muhammad Shofwan; Ray, Norman; Hidayawan, Ahmad
Jurnal Civil Engineering Study Vol. 5 No. 02 (2025): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/ces.v5i02.1518

Abstract

Pondasi merupakan elemen krusial dalam struktur bendungan karena berperan langsung terhadap stabilitas dan keamanan jangka panjang bendungan. Penelitian ini bertujuan untuk menganalisis metode perbaikan pondasi bendungan dari segi efisiensi biaya dan waktu pelaksanaan, dengan studi kasus pada proyek Bendungan Jragung di Kabupaten Semarang. Berdasarkan hasil investigasi geologi, ditemukan bahwa pondasi terdiri dari lapisan kolluvial dengan daya dukung yang rendah dan potensi deformasi tinggi. Dua metode perbaikan dianalisis, yaitu penggantian tanah dengan material batuan berkualitas dan perbaikan permukaan pondasi menggunakan dental beton serta metode Roller Compacted Concrete (RCC). Analisis dilakukan dengan menggunakan perangkat lunak GeoStudio (Sigma/W, Slope/W, Seep/W) untuk mengevaluasi deformasi vertikal (settlement), daya dukung tanah, dan stabilitas lereng. Hasil simulasi menunjukkan bahwa tanpa perbaikan, faktor keamanan pondasi tidak memenuhi syarat (FS = 1,32 < 1,5) dan terjadi penurunan diferensial hingga 20 cm, yang berisiko menyebabkan kebocoran pada zona inti bendungan. Setelah dilakukan perbaikan, kondisi pondasi menunjukkan peningkatan signifikan pada daya dukung dan kestabilan. Analisis biaya dan waktu menunjukkan bahwa metode RCC memberikan efisiensi pelaksanaan lebih tinggi dibandingkan metode dental beton.