PENENTUAN DISTRIBUSI SIFAT PADA FURNACE BOILER PEMBANGKIT LISTRIK TENAGA UAP LATI PT. INDO PUSAKA BERAU Fardin Hasibuan; Tri Jaya Widagdo
SIGMA TEKNIKA Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v6i1.5103

Abstract

Listrik sebagai salah satu kebutuhan rakyat yang harus tersedia oleh negara. Salah satu subsistem dalam memproduksi listrik adalah proses pembangkitan listrik. Listrik dapat dihasilkan dengan menggunakan Rencana Tenaga Uap, Hidro, Gas, Panas Bumi, dan lain-lain.  Pembangkit Listrik Tenaga Uap Lati adalah salah satu PLTU berbahan bakar batubara. PLTU Lati harus beroperasi secara konsisten dan efisien sehingga layanan listrik ke konsumen dapat disuplai setiap saat. Salah satu peralatan utama dalam pembangkit listrik adalah boiler dan salah satu komponen boiler adalah evaporator. Tujuan dari penelitian ini adalah untuk mengetahui distribusi properti pada boiler PLTU Lati. Penelitian ini juga dalam rangka membantu pola operasional yang paling efisien. Penentuan distribusi simulasi ini divalidasi oleh hasil pengukuran di lapangan sehingga diketahui tingkat akurasi model ini.  Penentuan distribusi ini menunjukkan penyimpangan antara hasil simulasi dengan pengukuran 3%. Pengoperasian dengan beban 75% lebih efisien daripada beban 50%.
ANALISIS PENGARUH SUDUT KAMPUH DAN KUAT ARUS PENGELASAN TERHADAP KEKUATAN TARIK HASIL PENGELASAN SHIELDED ARC WELDING (SAW) Rahman Hakim, Arif; Hasibuan, Fardin
SIGMA TEKNIKA VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v7i1.6161

Abstract

This research aims to study the effect of seam angle and welding current on the tensile strength, toughness, and hardness of the welding results. The material studied was low alloy steel containing levels of C = 0.098 %, Si = 0.228 %, Mn = 1.489 %, S = 0.007 %, P = 0.014 %, Ni = 0.151 %, Nb = 0.06, Cr = 0.085%, V=0.05%, W=0.05 %, Ti=0.01%. Welding is carried out with varying currents of 600A to 630A, using reverse polarity DC SAW welding, and alternating current AC with ESAB OK 12.32 electrodes with a diameter of 4.0 mm. DC current with reverse polarity, namely the electrode holder is connected to the positive pole and the parent metal is connected to the negative pole. The type of seam used is a single V seam with angles of 55o and 60o. Next, the specimens will be tested for tensile strength, toughness, hardness, and microphotography. The test results showed that the highest tensile strength of the welded joint occurred in the group of specimens welded with a current strength of 600A and a seam with an angle of 55o. The microstructure looks tighter compared to the microstructure of specimens welded with other variations of welding current. According to the results of this research, it can be concluded that with variations in the welding current, structural changes occur due to cooling, which affects the strength of the material, namely an increase in the raw materials
PERANCANGAN MESIN ES BALOK BERSUMBER LISTRIK TENAGA MATAHARI DI DESA MUNTAI KABUPATEN BENGKALIS Hasibuan, Fardin; Wajhi Akramunnas, Bastul; Widagdo, Trijaya
SIGMA TEKNIKA Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v6i2.5591

Abstract

fish is a food necessity as a source of protein for human life. Muntai Village in the Bantan District of Bengkalis Regency, Riau Province, is an area located on the Malacca Strait coast. Most of the village's population work as fishermen, both in saltwater and freshwater fishing. The primary production of fishermen is fish caught from the sea. The production of sea fish catches in the Bantan District in 2021 was 101 tons. Ice blocks are one of the components needed by the fishermen in Muntai Village. The distance from the village to the town, which takes around 1 to 1.5 hours, is a constraint in providing ice blocks for the fishermen in the village. The lack of electricity installation reaching the coastal area where the fishermen dock their boats is also one of the obstacles in providing ice blocks. The plan to create a solar-powered ice block machine is one of the alternative solutions to address the ice block supply issue for the fishermen in Muntai Village. The design of the ice block machine has a capacity of 3 tons per 24 hours with a power requirement of 13 kW and is sourced from solar panels with a specific number of solar cell modules. The investment cost required is Rp 833,051,670.00
RANCANGAN PEMASANGAN POMPA AIR YANG MENGGUNAKAN TENAGA LISTRIK MATAHARI DI LAHAN PERTANIAN DESA HUTARIMBARU PANYABUNGAN TIMUR Hasibuan, Fardin; Rahman Hakim, Arif; Sena, Boni; Akramunnas, Bastul Wajhi; Widagdo, Trijaya
SIGMA TEKNIKA Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v7i2.6339

Abstract

Padi merupakan kebutuhan pangan dasar di Indonesia. Desa Hutarimbaru yang berada di Kecamatan Panyabungan Timur Kabupaten Mandailing Natal Provinsi Sumatera Utara, merupakan daerah yang dimana sebagian besar masyarakatnya adalah petani padi. Keberhasilan penanaman padi sangat bergantung dengan suplai air pada areal persawahan tersebut, kontur daerah yang berbukit menjadi kendala dalam suplai air untuk persawahan tersbut. Jaringan listrik yang belum tersedia pada areal persawahan tersebut, mengakibatkan irigasi artificial sulit dilakukan, untuk itu diperlukan pembangkit listrik khusus pada areal persawahan tersebut, pembangkit listrik yang digunakan adalah Pembangkit Listrik Tenaga Surya (PLTS), dengan adanya PLTS ini maka pompa dapat dipasang untuk memompakan air dari sungai ke irigasi pada areal persawahan tersebut, dengan jarak sekitar 300 meter dan ketinggian areal persawahan 3 meter dari bibir air sungai normal. Head loss dengan diameter pipa 4 inchi sebesar 4.8 m. Luas cakupan daerah persawahan yang akan dialiri air seluas 3 ha dengan debit pompa 600 liter/detik, head 9 meter, power 3000 watt, AC satu phase. PLTS tersebut terpasang atas 16 modul solar cell dan biaya investasi yang dibutuhkan sebesar Rp 131.996.483,00.
RANCANGAN PEMASANGAN POMPA AIR DI LAHAN PERTANIAN DESA TANJUNG PASIR KECAMATAN PANGKALAN SUSU KABUPATEN LANGKAT SUMATERA UTARA Akramunnas, Bastul Wajhi; Hasibuan, Fardin; Hakim, Arif Rahman; Sena, Boni
SIGMA TEKNIKA Vol 8, No 1 (2025): SIGMATEKNIKA, VOL. 8, N0. 1, JUNI 2025
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v8i1.7593

Abstract

Padi merupakan komoditas pangan utama di Indonesia, termasuk di Desa Tanjung Pasir, Kecamatan Pangkalan Susu, Kabupaten Langkat, Provinsi Sumatera Utara, di mana mayoritas penduduknya bekerja sebagai petani padi. Keberhasilan pertanian di wilayah ini sangat bergantung pada ketersediaan air untuk irigasi sawah. Namun, kondisi topografi yang berbukit menjadi kendala dalam penyediaan air, terutama karena tidak adanya jaringan listrik di area persawahan, sehingga sistem irigasi buatan sulit diterapkan. Sebagai solusi, Pembangkit Listrik Tenaga Surya (PLTS) dipilih sebagai sumber energi untuk mendukung sistem irigasi. Dengan adanya PLTS, pompa air dapat digunakan untuk mengalirkan air dari sungai menuju lahan sawah yang berjarak sekitar 330 meter dengan elevasi 1,5 meter dari permukaan air sungai. Berdasarkan analisis teknis, kehilangan tekanan (head loss) dengan pipa berdiameter 6 inci mencapai 4,8 meter. Sistem irigasi ini dirancang untuk mengaliri lahan seluas 3 hektar dengan pompa yang memiliki debit 700 liter per menit, total head 9 meter, dan daya 3000 watt menggunakan sistem AC satu fase. PLTS yang digunakan terdiri dari 16 modul panel surya, dengan estimasi biaya investasi sebesar Rp 133.106.483.