Claim Missing Document
Check
Articles

Found 3 Documents
Search

Hubungan antara Motivasi Kerja dan Psychological Well- Pembentukan Superelevasi Jalan pada Pekerjaan Timbunan Ringan Mortar Busa Berdasarkan Setting Time Halim Pelu; Budi Hartanto Susilo; Darmawan Pontan
Jurnal Syntax Admiration Vol. 5 No. 8 (2024): Jurnal Syntax Admiration
Publisher : Syntax Corporation Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46799/jsa.v5i8.1552

Abstract

This study examines the relationship between work motivation and psychological well-being (PWB) in internship students in Jabodetabek. The Kampus Merdeka program policy provides opportunities for students to develop their skills and work experience. This study aims to identify how work motivation, both intrinsic and extrinsic, affects the psychological well-being of student interns. Using a predictive correlational approach, data were collected through questionnaires measuring the dimensions of work motivation and PWB. The results showed that intrinsic motivation has a significant positive impact on psychological well-being, while excessive extrinsic motivation can have a negative impact. The research emphasizes the importance of creating a supportive work environment to motivate student interns, improve their performance, and prepare them for the transition from academia to the world of work. The researcher obtained 103 respondents from various students in Jabodetabek. universities with 25.2% male and 74.8% female gender. This research data was processed using convenience sampling techniques, using the Multidimensional Work Motivation Scale (MWMS) questionnaire and Psychological Well Being (PWB) distribution this questionnaire through social media by using google form. The analysis of the data is known through the Kolmogorov Smirnov test obtained a figure of 0.200> 0.05 for both variables, it is concluded that the residual data is normally distributed.
Risk Analysis Of Construction Planning Affecting Quality, Time, and OHS Control on Management Performance in Warehouse and Logistics Industry Muhammad Fauzi; Darmawan Pontan; Muhammad Zaki; Tulus Widiarso
Dinasti International Journal of Education Management And Social Science Vol. 6 No. 3 (2025): Dinasti International Journal of Education Management and Social Science (Febru
Publisher : Dinasti Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38035/dijemss.v6i3.4036

Abstract

The logistics industry in Indonesia is growing in line with the increase in online transactions. Warehouse facilities play a crucial role in the logistics industry as they are essential for ensuring smooth business operations. Warehouses used for logistics purposes generally employ steel construction. The development of steel-structured warehouses carries considerable risks that can affect project completion time, project quality, occupational health and safety (OHS), and management performance. Therefore, management must be able to identify and analyze all potential risks during warehouse construction to ensure the project is completed with planned quality, OHS control, and timing. This study aims to identify the relationships among risk factors during the planning and construction phases with quality control, time, and OHS, which can influence management performance. Additionally, it seeks to measure the impact of project control, particularly in terms of quality, time, and OHS, on management performance in warehouse and logistics industry development. The research employs a quantitative descriptive method. Data analysis was conducted using Structural Equation Modeling (SEM) with the Smart PLS application. The study found that risks have a direct positive impact on quality control, time, and OHS but an insignificant negative impact on management performance. Furthermore, the findings indicate that quality control, time, and OHS significantly and positively influence management performance.
Analysis of Mark UP value decisions with a bidding strategy model to win projects in government auctions Nyoman Rowin Sinaya; Parwadi Moengin; Bambang Endro Yuwono; Darmawan Pontan
Jurnal Indonesia Sosial Teknologi Vol. 5 No. 6 (2024): Jurnal Indonesia Sosial Teknologi
Publisher : Publikasi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59141/jist.v5i6.1120

Abstract

The purpose of this study is to create a bidding strategy to determine the optimum markup value and maximum expected profit to win a project auction. From the data selection results, 24 project tenders and 12 large qualification companies participated in the tender on the LPSE page of the Ministry of PUPR, which will be used as samples in this study. The bid strategy model used to calculate the optimum markup value and maximum expected profit are with 3 (three) bid strategy models, namely the Friedman Model, Gates Model and Ackoff & Sasieni Model, and to calculate the probability of winning using the statistical approach method of multi discrete distribution, normal multi-distribution and single normal distribution. From the results of testing models with optimal mark-ups for the 24 project tenders used in this study, the percentage for each bidding strategy model that has the potential to win the tender sequentially is the Friedman model by 80.56%, the Gates model by 61.11% and the Ackoff &; Sasieni model by 43.06%. So, it can be concluded that the Friedman model provides a fairly high chance of winning tenders in government projects within the Ministry of PUPR.