Jauhar latifah
Unknown Affiliation

Published : 4 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 4 Documents
Search

Analisis Penjadwalan Proyek Terhadap Waktu Penyelesaian Proyek Pada Wisma Koperasi Sugri di Rangkasbitung Bambang Pujo Purwoko; Siti Aminah; Jauhar latifah; Andri Susilo
E-Journal Studia Manajemen Vol 1 No 3 (2012)
Publisher : E-Journal Studia Manajemen

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The aim of the study to determine how the process of project scheduling and project completion time. Analysis of projects using PERT (Program Evaluation Review Technique). To determine the time of completion using the two calculations, forward and backward calculation. From all calculations start from ground, first, second and the third floor, note that all activities of critical experience caused delayed completion of the project. Thus there is effect on project schedule project on completion time of project.
Peranan Bahan Baku terhadap Optimalisasi Hasil Produksi pada Usaha Mikro di Kabupaten Lebak Jauhar Latifah; Suheri .; Ratu Neneng Rozbiati; Lita Mulyati
E-Journal Studia Manajemen Vol 1 No 3 (2012)
Publisher : E-Journal Studia Manajemen

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to examine and analyze the effect role of raw material on optimization production at micro business in Kampung Desa Cibuluh Mugijaya Cigemblong Lebak. This study uses a combination of research methods (mixed methods) between quantitative and qualitative research methods. Desing study based on reports production of raw materials and optimization of production at micro business. The population used in this study is 25 palm sugar artisans. Purposive sampling method was used conducted research. The results showed that Three is effect of raw material on optimization of production.
Analisis Biaya Pembelian Bahan Baku Terhadap Jumlah Produksi Pada CV. Shaniqua Marigold Bamboo Di Rangkasbitung Bambang Pujo Purwoko; Ratna Handayani; Yumhi .; Jauhar Latifah
E-Journal Studia Manajemen Vol 2 No 1 (2013)
Publisher : E-Journal Studia Manajemen

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Purchasing is one of the important functions in the success of the company's production, because this function has the responsibility to obtain raw materials at the quantity and quality is good and according to need. The study population was all over raw material purchasing data since the founding of the company and the sample is a raw material purchasing data and the amount of production for 10 months ie from January to October 2010 using the research instrument Likert scale (1-5). Data analysis techniques used are (1) the correlation coefficient, (2) the coefficient of determination, and (3) testing the hypothesis by using t test. The results showed that there is a strong relationship between the cost of purchase of raw materials and production quantities.
Analisis Sistem Antrian Dalam Upaya Optimalisasi Pelayanan Pada PT. Bank Rakyat Indonesia (Persero) Tbk. Kantor Unit Pasar Kota Rangkasbitung Jauhar Latifah; Eri Nuryanah; Indra Laksana Noerwan; Andri Susilo
E-Journal Studia Manajemen Vol 3 No 2 (2014)
Publisher : E-Journal Studia Manajemen

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Queuing problem is a part that cannot be avoided in the banking system. In banking, serving customers speed can improve customer satisfaction. The aim of this study was to determine the queuing system is applied to PT. Bank Rakyat Indonesia (Persero) Tbk. Rangkasbitung. In this study, the authors use the case study method. Data used to conduct research is secondary data and primary data. Data collection techniques used to obtain the necessary data is by observation and interview. Based on the research results, Discipline imposed queue is First Come First Serve (FCFS) or FIFO, from teller utilization BRI Rangkasbitung reaches 0.90 or 90% and the average customer in the queue the longest occurred in the 10:00 to 11:00 time period where the average customer waiting in line at the period of time as much as 7.62454 (8 customer), the average customer waiting in the system as much as 9.47454 (9 customer). The average time spent by a person of customers to wait in the queue is 0.21179 hours, the longest time spent in the system is a long .20869 hours. In order for teller service can run optimally so that it can overcome the problem of the queue should the bank provide additional teller opened number one for transaction deposits, withdrawals, and other services.