Analisis Keterlambatan Penyelesaian Port Disbursement dalam Kinerja Operasional pada Perusahaan Jasa Keagenan Kapal Rosalia Indah Sari; Bugi Nugraha; Prima Yudha Yudianto; Intan Sianturi
Jurnal Bintang Pendidikan Indonesia Vol 2 No 4 (2024): November : Jurnal Bintang Pendidikan Indonesia
Publisher : Pusat Riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jubpi.v2i4.3293

Abstract

Delays in the completion of Port Disbursements in ship agency companies can interfere with operational performance in ship agency companies where this delay factor arises from internal and external parties. This article explains that there are still obstacles/factors that cause the process of completing a ship's Port Disbursement has not run on time due to obstacles between shipping agents, related agencies, and Port Business Entities, This research uses qualitative research with data collection and interviews, while the data collection in this study is by data reduction, and the existence of primary and secondary data sources. Based on the results of the research obtained by the researcher, the cause of the delay in completing Port Disbursement uses 4 (four) elements in the Fishbone Diagram, namely Man, Material, Method, and Machine. These factors cause operational performance in completing Port Disbursement on time which ultimately causes queues/piles of settlement files, so that this will have an impact on the company's cash flow to be unsmooth. The solution provided by the company is to continue to evaluate and improve what makes the obstacle factors experienced by the operational and financial divisions in completing the settlement.
Rancang Bangun Sistem Monitoring Kinerja Main Engine Kapal Berbasis IOT Aditya Putra Mahendra; Sri Mulyanto Herlambang; Prima Yudha Yudianto
Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan Vol. 2 No. 4 (2024): Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/globe.v2i4.575

Abstract

Main engine is the main driving engine. This research develops a ship's main engine temperature monitoring system using the Blynk application. Thermocouple sensors measure engine temperature and IR Sensor measure RPM, the data is processed by ESP32, and sent to the Blynk cloud server, this research aims to determine the design of a prototype intelligent monitoring system to detect the temperature of a ship's main engine using a Thermocouple sensor, NodeMCU ESP32 which operates at 3.3V power is used as the processing core data. The system design in this research integrates Internet of Things (IoT) technology. Test factors for thermocouple temperature measuring devices and RPM sensors (IR Sensors). The test procedure uses a dynamo as a simulation of the main engine, tested for 5-10 minutes under normal conditions and 5 minutes when the dynamo feels warm to hot.
Pengaruh Idle Time Terhadap Produktivitas Kegiatan Bongkar Muat Curah Kering di Pelabuhan Java Integrated Industrial and Port Estate (JIIPE) (Studi Kasus PT Berlian Manyar Sejahtera Tahun 2024) Wahyu Aria Prayoga; Bugi Nugraha; Prima Yudha Yudianto; Intan Sianturi
JURNAL RISET RUMPUN ILMU TEKNIK Vol. 4 No. 1 (2025): April : Jurnal Riset Rumpun Ilmu Teknik
Publisher : Pusat riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jurritek.v4i1.4912

Abstract

This study aims to examine the effect of idle time on the productivity of dry bulk loading and unloading activities at the Java Integrated Industrial and Port Estate (JIIPE). The research employed a quantitative correlational approach, with data collection techniques including observation, documentation, and company records. The research sample consisted of 12 vessels engaged in loading and unloading at Java Integrated Industrial and Port Estate (JIIPE) port during the period from January to July 2024. The analysis revealed a correlation coefficient of -0.16, indicating a very weak negative relationship between idle time and productivity. The coefficient of determination, at 2.56%, suggests that idle time contributes only marginally to productivity, while the remainder is influenced by other factors. The factors affecting idle time include weather conditions, equipment failures, and truck delays. The conclusion indicates that while idle time does impact productivity, the effect is not statistically significant..
Analisis Peranan Handling Cargo Terhadap Proses Bongkar Muat di PT. Terminal Teluk Lamong Faradita Ayu Anggraini; Intan Sianturi; Prima Yudha Yudianto; Rizqi Aini Rakhman
JURNAL RISET RUMPUN ILMU TEKNIK Vol. 4 No. 1 (2025): April : Jurnal Riset Rumpun Ilmu Teknik
Publisher : Pusat riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jurritek.v4i1.5019

Abstract

The role of Cargo Handling on the Loading and Unloading Process at PT Terminal Teluk Lamong is very important for the loading and unloading process at the port. This research aims to identify various technical and non technical obstacles in the operation of cargo handling equipment such as ASC, forklift, and reach stacker. The interview results showed that there are four main factors that become obstacles in the loading and unloading process, namely machines, methods, facilities, and manpower. Further analysis using fishbone diagrams reinforced these findings by outlining the causes of each factor, ranging from machine interference, wrong container placement methods, limited technological facilities such as Container Scanner Reader (CSR), to the driver’s lack of understanding of the automation system. Quantitatively, the efficiency of cargo handling was evaluated through the 2023 container throughput, which showed a positive trend with a significant increase in load activity, especially in October which recorded the highest number of 39.106 Boxes. The analysis concluded that although there are various obstacles in cargo handling practices, the system implemented by PT Terminal Teluk Lamong has generally been able to improve the efficiency of the loading and unloading process, as evidenced by the volume of container handling.
Analisis Keterlambatan Penyelesaian Port Disbursement dalam Kinerja Operasional pada Perusahaan Jasa Keagenan Kapal Rosalia Indah Sari; Bugi Nugraha; Prima Yudha Yudianto; Intan Sianturi
Jurnal Bintang Pendidikan Indonesia Vol. 2 No. 4 (2024): November : Jurnal Bintang Pendidikan Indonesia
Publisher : Pusat Riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jubpi.v2i4.3293

Abstract

Delays in the completion of Port Disbursements in ship agency companies can interfere with operational performance in ship agency companies where this delay factor arises from internal and external parties. This article explains that there are still obstacles/factors that cause the process of completing a ship's Port Disbursement has not run on time due to obstacles between shipping agents, related agencies, and Port Business Entities, This research uses qualitative research with data collection and interviews, while the data collection in this study is by data reduction, and the existence of primary and secondary data sources. Based on the results of the research obtained by the researcher, the cause of the delay in completing Port Disbursement uses 4 (four) elements in the Fishbone Diagram, namely Man, Material, Method, and Machine. These factors cause operational performance in completing Port Disbursement on time which ultimately causes queues/piles of settlement files, so that this will have an impact on the company's cash flow to be unsmooth. The solution provided by the company is to continue to evaluate and improve what makes the obstacle factors experienced by the operational and financial divisions in completing the settlement.