PKM PEMBUATAN PERENCANAAN WAKTU PEKERJAAN DENGAN BAR-CHART DAN KURVA-S DI SMKN 26 JAKARTA Pontan , Darmawan; Sumeru , Indrawati; Sutjipto, Suradjin; Susetyarto, Bambang; Sapto Nugroho , Muhammad
Kocenin Jurnal Pengabdian Kepada Masyarakat Vol. 4 No. 1 (2024): Juni 2024
Publisher : Konsorsium Cendekiawan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dalam manajemen konstruksi, perencanaan yang efektif memainkan peran penting dalam memastikan pelaksanaan proyek berjalan lancar. Kegiatan Pengabdian Kepada Masyarakat (PKM) ini berfokus pada meningkatkan pemahaman dan keterampilan siswa SMK 26 Jakarta dalam bidang penjadwalan pekerjaan menggunakan Bar-Chart dan Kurva-S. Mengakui pentingnya perencanaan dalam manajemen konstruksi, inisiatif ini bertujuan untuk membekali peserta dengan pengetahuan praktis dan alat untuk mengoptimalkan waktu proyek dan pemanfaatan sumber daya. Melalui serangkaian kegiatan terstruktur, peserta diajak untuk memahami konsep dasar perencanaan waktu dan penggunaan alat bantu visual seperti Bar-Chart dan Kurva-S. Poin pentingnya adalah memberikan teknik praktis yang dapat langsung diterapkan dalam industri konstruksi. Evaluasi hasil PKM melalui kuesioner kepada peserta mengungkap bahwa kegiatan ini berhasil meningkatkan pemahaman dan keterampilan peserta dalam penjadwalan pekerjaan. Meskipun peserta telah memiliki pengetahuan dasar, PKM ini memberikan wawasan dan keterampilan tambahan yang sangat berharga untuk menghadapi kompleksitas industri konstruksi. Oleh karena itu, PKM ini menjadi langkah penting dalam meningkatkan kualitas pendidikan dan mempersiapkan siswa SMK 26 Jakarta untuk menghadapi tantangan yang ada dalam sektor konstruksi.
PAPARAN DETAIL PENULANGAN BETON TAHAN GEMPA DI SMKN 26 JAKARTA Sumeru, Indrawati; Pontan, Darmawan; Sari, Feby Kartika; Nugroho, Muhammad Sapto
Indonesian Collaboration Journal of Community Services (ICJCS) Vol. 5 No. 1 (2025): Indonesian Collaboration Journal of Community Services
Publisher : Yayasan Education and Social Center

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53067/icjcs.v5i1.200

Abstract

Indonesia is a geologically active region prone to frequent seismic activity, where numerous significant earthquakes have led to extensive structural damage. Insights gained from both major and minor seismic events have contributed to the continuous refinement of seismic hazard maps and construction regulations in Indonesia (SNI). However, structural failures remain prevalent due to improper implementation of reinforced concrete detailing that does not adhere to established standards. This Community Engagement Program (PKM) aims to enhance students' understanding of earthquake-resistant reinforced concrete detailing at SMKN 26 Jakarta in accordance with SNI 2847:2019. This activity involves the dissemination of regulations related to earthquake-resistant concrete buildings, as well as case studies on building failures due to earthquakes. Evaluation through questionnaires revealed that the initiative effectively strengthened participants' knowledge of the essential role of precise concrete reinforcement detailing in ensuring structural resilience and safety. Through this initiative, students acquire essential knowledge and practical skills to address challenges in the construction industry, particularly in designing and constructing earthquake-resistant structures. This program plays a vital role in strengthening vocational education and equipping future professionals with the expertise needed to meet industry standards and safety regulations
PKM PENGENALAN DAN PENYUSUNAN RKS PEKERJAAN PENGECATAN PADA SISWA SMKN 26 JAKARTA Pontan , Darmawan; Sumeru , Indrawati; Bambang Susetyarto, Martinus; Sapto Nugroho , Muhammad; Kartika Sari , Feby
Kocenin Jurnal Pengabdian Kepada Masyarakat Vol. 5 No. 1 (2025): Juni 2025
Publisher : Konsorsium Cendekiawan Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Rencana Kerja dan Syarat-Syarat (RKS) merupakan dokumen penting dalam proyek konstruksi yang berfungsi sebagai pedoman teknis dan administratif, termasuk dalam pekerjaan pengecatan. Kurangnya pemahaman dalam penyusunan RKS dapat menyebabkan ketidaksesuaian standar mutu, pemborosan material, dan keterlambatan proyek. Kegiatan Pengabdian kepada Masyarakat (PkM) ini bertujuan untuk meningkatkan pemahaman siswa SMKN 26 Jakarta mengenai penyusunan RKS pekerjaan pengecatan. Metode yang digunakan meliputi pemaparan materi, diskusi interaktif, serta latihan penyusunan RKS berbasis studi kasus. Hasil evaluasi menunjukkan bahwa sebelum kegiatan ini, 63,1% peserta belum memahami dokumen RKS. Setelah kegiatan, terjadi peningkatan signifikan dalam pemahaman konsep RKS, standar teknis, dan prosedur administrasi proyek konstruksi. Dengan demikian, kegiatan ini memberikan kontribusi dalam meningkatkan kesiapan siswa dalam menghadapi dunia kerja di industri konstruksi.
UNSOLICITED PPP IMPLEMENTATION IN INDONESIA: A CASE STUDY OF THE DHOHO AIRPORT PROJECT Nugroho, Muhammad Sapto; Sari, Feby Kartika; Wismar, Luwandiko; Saputra, Olgavian Ade
INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD) Vol 8 No 1 (2025): INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)
Publisher : Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/cesd.v8i1.22715

Abstract

Infrastructure development is a critical driver of economic growth in Indonesia. However, limited funding from the State Budget (APBN) has prompted the Indonesian government to adopt the Public-Private Partnership (PPP) scheme. The Kediri Dhoho Airport project, designated as one of the National Strategic Projects (PSN), is the first unsolicited PPP airport project in Indonesia, initiated by PT Gudang Garam Tbk through its subsidiary, PT Surya Dhoho Investama (PT SDHI), using the Design-Build-Finance-Operate-Maintain-Transfer (DBFOMT) scheme. This single-case study analyzes the project’s success factors and identifies strong financial commitment, effective risk management, and rigorous monitoring and evaluation as key contributors to the successful implementation of the unsolicited PPP model. The findings show that the project overcame significant challenges—such as land acquisition, technical risks, and financial constraints—without any government fiscal contributions. The success of the Dhoho Project is expected to serve as a strategic model for future PPP initiatives, demonstrating that this scheme can be an effective solution for public infrastructure development in Indonesia.
RISK MANAGEMENT IN THE ANDIR RETENTION BASIN PROJECT: A QUALITATIVE CASE STUDY Feby Kartika Sari; Muhammad Sapto Nugroho; Darmawan Pontan
HUMANITIS: Jurnal Homaniora, Sosial dan Bisnis Vol. 3 No. 2 (2025): AGUSTUS
Publisher : ADISAM PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Mega infrastructure projects in Indonesia face a complex landscape of uncertainty, often hindered by significant non-technical risks such as land acquisition and financing issues. Systematic risk management is crucial to ensure project success. This research aims to comprehensively dissect and map the risk landscape in a case study of the Andir Retention Basin Project, which reflects these challenges. Using a qualitative case study approach, this study gathered primary data through in-depth interviews with key stakeholders. Through participatory discussions, each risk was identified and assessed based on its probability and impact levels. The assessment results were then mapped onto a risk matrix to determine priority levels and formulate appropriate response strategies. The research identified 12 main risks, with five categorized as Very High: Land Acquisition, Project Financing, Regulatory Changes, Bad Weather, and Work Accidents. The main conclusion of this study is that the project's risk profile is dominated by non-technical and external factors. This finding confirms that the success of modern infrastructure projects depends not only on technical excellence but also on the management's ability to proactively navigate social, financial, and regulatory complexities.
The Influence Of Risk Management Culture On Project Time Control In Construction Projects: A Random Forest Approach Kartika Sari, Feby; Nugroho , M. Sapto; Prasetyo, Ryan Faza; Faisal, Ulfa Fatmasari; Wijaya, M. G. Wisnu; Bonastria, Citra Mira Dewi
Rekayasa Sipil Vol. 20 No. 1 (2026): Rekayasa Sipil Vol. 20 No. 1
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2026.020.01.5

Abstract

Managing time is crucial in construction projects, as schedule deviations caused by complexity and external risks often lead to costly delays. This study aims to analyze how risk management culture influences time control in high-rise building construction projects. A mixed-methods approach was employed: first, risk management culture variables were qualitatively identified through in-depth interviews; then, a quantitative analysis was conducted using questionnaires distributed to project managers, construction managers, and financial managers. The data were analyzed with the Random Forest algorithm, chosen for its predictive accuracy. Risk management culture variables (X1–X23) were adapted from ISO 31000:2018, while project time control was measured using the Schedule Performance Index (SPI). The results indicate that a risk management culture has a significant and positive impact on project time control. The most influential factors were the documentation of the risk register (X23), the integration of risk evaluation into decision-making (X16), and continuous monitoring and review (X20). Conversely, formal aspects, such as risk management policies (X2) and training programs (X11), showed a relatively lower influence. These findings suggest that active implementation of risk management culture in daily operations contributes more directly to improving schedule performance. The study highlights the importance of accurate risk documentation, risk-informed decision-making, and adaptive monitoring as priorities for achieving effective time control in construction projects.
Pendataan Dan Pemetaan Spasial Rumah Tidak Layak Huni Sebagai Dasar Perencanaan Pembangunan Di Kelurahan Kapuk, Jakarta Barat Kartika Sari, Feby; Nugroho, M. Sapto; Faisal, Ulfa Fatmawati
PRAXIS: Jurnal Pengabdian kepada Masyarakat Vol. 4 No. 2 (2025): PRAXIS Desember
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47776/2dja7y18

Abstract

Tingginya angka backlog perumahan dan jumlah Rumah Tidak Layak Huni (RTLH) di DKI Jakarta menjadi tantangan serius yang diperumit oleh ketiadaan data terintegrasi by-name-by-address sebagai dasar kebijakan. Menjawab temuan BPK dan amanat Rapergub RP3KP, kegiatan pengabdian kepada masyarakat ini bertujuan untuk melakukan pendataan dan pemetaan RTLH serta mengidentifikasi kebutuhan infrastruktur di Kelurahan Kapuk, Jakarta Barat. Kegiatan ini menggunakan metode survei deskriptif dengan pendekatan kuantitatif dan kualitatif di 16 RW se-Kelurahan Kapuk. Prosesnya melibatkan kolaborasi multi-pihak antara Universitas Trisakti, Dinas Perumahan Rakyat dan Kawasan Permukiman (DPRKP) DKI Jakarta, serta kader Dasawisma, yang mencakup tahap persiapan, pelaksanaan survei lapangan menggunakan Aplikasi Jakarta Satu, dan diakhiri dengan workshop validasi. Hasil kegiatan berhasil memetakan 12.355 bangunan yang dihuni oleh 24.316 Kepala Keluarga (82.257 jiwa). Selain itu, teridentifikasi dua masalah infrastruktur krusial: (1) sistem drainase yang tidak memadai akibat penyumbatan dan kapasitas yang kecil sehingga menyebabkan banjir lokal, dan (2) tidak adanya Ruang Bermain Ramah Anak (RBRA) yang aman. Data hasil kegiatan ini menyediakan basis data terpadu bagi Pemerintah Provinsi DKI Jakarta sebagai landasan empiris untuk merumuskan kebijakan penanganan RTLH dan program perbaikan lingkungan yang tepat sasaran di Kelurahan Kapuk.
IMPACT OF LEAN CONSTRUCTION IMPLEMENTATION ON CONSTRUCTION BUILDING PROJECTS Abdhy Gazali; Aldy Riza Dhiandra; Muhammad Sapto Nugroho; Alfandi Ziqri; Lintang Tirta Sari
Jurnal Pensil : Pendidikan Teknik Sipil Vol. 14 No. 2 (2025): Jurnal Pensil : Pendidikan Teknik Sipil
Publisher : LPPM Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/jpensil.v14i2.54389

Abstract

Enhancing efficiency, minimizing waste, and improving project productivity are key objectives in Lean Construction. This study explores the impact of Lean Construction implementation at PT PP by examining the correlation between Planned Percentage Complete (PPC) in the Last Planner System (LPS) and project performance, including productivity and cost efficiency. The research employs a descriptive statistical analysis method, with data collected through a self-assessment survey and an evaluation of the correlation between PPC and key project management factors. The results indicate that LPS implementation significantly enhances productivity, with a positive correlation between PPC values and project efficiency. Furthermore, waste analysis reveals that Waiting, Defect, and Overproduction are construction projects' most dominant waste categories. This study also identifies that Lookahead Planning within LPS is crucial in reducing constraints, positively impacting project timeliness and cost control. Consequently, the findings provide deeper insights into Lean Construction  implementation and offer strategic recommendations for companies to sustainably enhance efficiency and project performance.