Pendampingan Pembangunan Musholla Al-Mujabin dengan Metode Hybrid Putri, Tika Novis; Syahriyah, Dewi Rachmaniatus; Septian, Ridho; Aulia, Zumrati
Jurnal Pengabdian Tri Bhakti Vol 4 No 2 (2022): Jurnal Pengabdian Tri Bhakti
Publisher : Lembaga Pengabdian kepada Masyarakat Universitas Langlangbuana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36555/jptb.v4i2.2193

Abstract

Community Service Activities conduct to assist in the reconstruction of the Al Mujabin mosque which has been badly damaged. Abdimas plays the role of an expert who assists in coordination between the local contractor and representatives of crowdfunding foundations. The purpose of this assistance is to realize the construction of the Al Mujabin Mosque by following the Work Implementation Technical Plan both in terms of design and duration of construction time. To increase funding and time efficiency, the assistance for the construction of the Al Mujabin Mosque was carried out using a hybrid method with one site visit in the middle of the duration of the construction and assistance through Whatsapp, Zoom, and Android-based applications, namely Raken Construction Management. The use of the website and mobile-based technology is effective in assisting coordination between Abdimas, foundations, and field implementers so that the problems and quick solutions needed can be properly accommodated. The output of this community service is the completion of the construction of the Al-Mujabin Mosque in Kertajadi Village, Cidaun District, Cianjur Regency by Architects and Construction Experts following a predetermined design, both in terms of coordination, supervision, problem-solving, and timeliness construction.
Analisis Kelayakan Finansial Pada Proyek Renovasi Bangunan Gedung Dengan Fungsi Usaha Hunian Septian, Ridho; Astuti , Santi Widi; Mariam, Evi Siti; Rizki, Meliana; Prawira, Yuda; Airlangga, Dito Adam
Jurnal Rekayasa Infrastruktur Vol. 11 No. 1 (2025): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v11i1.297

Abstract

The Population and Civil Registration Service DKI Jakarta, noted that the number of immigrants increases almost every year. Therefore, the need for temporary housing also increases. On this basis, investment in residential business buildings is a promising business. South Jakarta in particular is currently one of the most popular destinations for immigrants. This strategic location is what makes investors interested in investing their money in the form of property businesses such as residential business buildings. This paper aims to analyze the financial feasibility of the residential business building project. The financial feasibility analysis of residential business buildings is carried out using the Net Present Value (NPV) and Internal Rate of Return (IRR) methods. Sensitivity analysis is carried out to determine a variable that affects this residential business building business. From the NPV calculation, a value of Rp. 655,115,548 is obtained, financially feasible (NPV> 0). The IRR percentage value obtained is 8.42% with a MARR of 7.90% (IRR> MARR), so this renovation project is financially feasible. Sensitivity analysis shows that the project is not feasible at bank repayment interest rates greater than 8.49%, occupancy less than 26 rooms and construction cost increases greater than 11.87%.
Evaluasi, Strategi, Serta Sosialisasi Perawatan Dan Perbaikan Gedung di SMAN 1 Padalarang untuk Mewujudkan Sekolah Tanggap Bencana Yulianto, Yulianto; Septian, Ridho; Widyaningsih, Yulia; Indah, Risma Nur; Maulana, Muhammad Yunus; Putri, Tika Novis; Syahriyah, Dewi Rachmaniatus; Maulida, Muhammad Musyofa
JP3M: Jurnal Pendidikan, Pembelajaran dan Pemberdayaan Masyarakat Vol 5 No 2 (2023): JURNAL PENDIDIKAN PEMBELAJARAN DAN PEMBERDAYAAN MASYARAKAT
Publisher : Universitas Insan Cendekia Mandiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37577/jp3m.v5i2.662

Abstract

Gempa akibat pergerakan sesar Lembang dan Cimandiri menjadi ancaman serius bagi wilayah Kabupaten Bandung Barat (KBB), BPBD KBB mengidentifikasi 13 sekolah menengah atas yang berada dalam zona bahaya, termasuk SMAN 1 Padalarang. Sebagai sekolah unggulan di KBB, SMAN 1 Padalarang memiliki tanggung jawab besar untuk menjaga keamanan siswa dan sivitas akademika saat menghadapi bencana gempa. Program pengabdian kepada masyarakat ini dilakukan melalui metode pelaksanaan dengan tahapan survey dan observasi sebagai bentuk evaluasi tim terhadap keamanan struktur bangunan gedung menggunakan UPV dan Hammer Test. Penyusunan strategi pengelolaan gedung serta penataan jalur evakuasi. Kemudian dilakukan sosialisasi hasil evaluasi dan strategi yang telah disusun kepada pihak mitra beserta setiap elemennya. Hasil survey dan observasi lapangan menunjukkan permasalahan dalam mitigasi terkait desain bangunan, jalur evakuasi, dan pemahaman standar bangunan tanggap gempa yang menyulitkan strategi mitigasi. Untuk mengatasi hal tersebut, diusulkan kegiatan PKM untuk evaluasi, strategi, dan sosialisasi perawatan dan perbaikan gedung agar SMAN 1 Padalarang menjadi sekolah tanggap bencana.
Analisis Perhitungan Final Account pada Proyek Pembangunan Interior Fit-out Astuti, Santi Widi; Septian, Ridho; Marenshaputri, Pureza
SAINSTEK Vol. 13 No. 2 (2025)
Publisher : Sekolah Tinggi Teknologi Pekanbaru

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35583/js.v13i2.392

Abstract

Final account dalam suatu proyek konstruksi dibuat untuk menunjukkan biaya akhir proyek yang telah diselesaikan oleh kontraktor. Proses penyusunan final account diawali dengan mengetahui nilai kontrak proyek konstruksi, melakukan identifikasi nilai penyesuaian provisional sum, perhitungan kembali provisional quantity, perhitungan pekerjaan tambah dan kurang, serta nilai-nilai lain yang timbul atas kesepakatan pemberi kerja dengan kontraktor. Nilai-nilai lain yang timbul antara lain perpanjangan waktu yang diberikan, denda keterlambatan, maupun fluktuasi akibat kenaikan harga material. Setelah dilakukan perhitungan, terjadi penambahan nilai akhir dari nilai awal kontrak awal yaitu Rp.228.398.351.211,- menjadi Rp.266.973.736.472,-. Penambahan tersebut sebesar Rp.38.575.385.261,-. Hasil dari nilai final account ini harus disetujui oleh kedua belah pihak yaitu pemberi kerja dan kontraktor, sehingga tidak ada perselisihan dikemudian hari.