EVALUASI PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PROYEK PEMBANGUNAN RUMAH SAKIT KASIH IBU SURAKARTA Andreas danny meidika; Joko Setiono; Fadjar Purnomo
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 6 No. 1 (2025): MARET 2025
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v6i1.5806

Abstract

Penelitian tentang “EVALUASI PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PROYEK PEMBANGUNAN RUMAH SAKIT KASIH IBU SURAKARTA” bertujuan untuk Mengetahui penerapan K3, pengelolaan limbah, SOP penerapan K3 dan rencana anggaran biaya penerapan K3. Metode penyebaran kuesioner dan pengolahan data menggunakan SPSS merupakan cara penelitian pada penerapan K3. Penelitian pengelolaan limbah menggunakan kuesioner dan Peraturan Pemerintah. Perencanaan SOP konsultan pengawas menggunakan standar Work Breakdown Structure. Penyusunan rencana anggaran biaya menggunakan Harga Satuan Dasar Provinsi Jawa Tengah Tahun 2024. Hasil penelitian sistem manajemen keselamatan dan kesehatan kerja menunjukkan hasil yang sangat baik yaitu 92,24% dan pada pengelolaan limbah mendapatkan penilaian baik yaitu 84%. SOP penerapan K3 berdasarkan WBS dengan hasil HIRADC. Nilai RAB SMK3 pada Proyek Pembangunan Rumah Sakit Kasih Ibu Surakarta sebesar Rp.4.810.410.000,-
PROJECT PLANNING DIVERSION TUNNEL BAGONG DAM PROJECT TRENGGALEK REGENCY Vidi Az Zahra; Fadjar Purnomo; Indah Ria Riskiyah
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 6 No. 1 (2025): MARET 2025
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v6i1.6027

Abstract

On the progress of construction development, especially in the construction of water buildings, one of which is a dam. In Trenggalek Regency a dam was built which was named Bagong Dam. This dam was built to control floods that commonly occur in the area. In the dam construction project there is a diversion tunnel building that is used to divert water flow during the main dam construction period. There were delays in the construction of this evasive building. The tunnel is a limited space, the difficulty of access roads, and equipment damage in some activities cause delays in the project so that it requires proper and efficient project planning. To complete this project, good cost, time, and quality considerations are needed so that it can be realized properly. This project planning aims to plan the organizational structure, strategies and methods, site layout preparation assisted using autocad application and Microsoft excel, quality plan, K3 plan, implementation budget plan, and scheduling using Microsoft Project 2021 application. Pure organizational structure planning is more efficient. By using a comparison of the use of existing and precast, it is found that the use of precast has a faster implementation duration of 180 days while if using the existing for 259 days. In the calculation of the implementation budget plan in precast amounting to Rp170,021,748,985 and in the existing obtained at Rp188,495,961,368. With these results, it is found that the use of precast is cheaper and more effective in the process. Quality planning is carried out according to the quality targets that have been made so that the building is according to plan. OHS planning is carried out to achieve Zero Accident. Effective site layout preparation is carried out for work efficiency.
ANALISIS IMPLEMENTASI LEAN CONSTRUCTION UNTUK MENGURANGI WASTE PADA PROYEK PEMBANGUNAN GEDUNG ITB SCIENCE TECHNO PARK BANDUNG Rhaka Pandhega; Fadjar Purnomo; Deni Putra Arystianto
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 6 No. 2 (2025): JUNI 2025
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v6i2.6263

Abstract

Pada pelaksanaan pembangunan gedung, masih ditemukan masalah ketidakefisienan yang bisa menghalangi proses pekerjaan konstruksi. Oleh karena itu, dalam proyek ini diperlukan perencanaan yang cermat di semua bidang untuk mencegah gangguan yang dapat menghambat pembangunan. Aktivitas yang menggunakan sumber daya tetapi tidak menghasilkan nilai yang diharapkan, menyebabkan pemborosan (waste). Penelitian ini bertujuan untuk mengurangi pemborosan (waste) pada proyek konstruksi agar tidak mengganggu proses pembangunan dengan menggunakan metode lean construction dengan melakukan wawancara terhadap kontraktor dan mandor untuk menganalisa adanya waste dan faktor faktor penyebabnya, kemudian dilanjutkan dengan menyebarkan kuesioner pertanyaan 8 waste of lean. Data tersebut kemudian diuji validitas dan reliabilitas, serta dianalisa menggunakan metode last planner system. Berdasarkan dari pengolahan data dan analisis data pada Proyek ITB Science Techno Park Bandung didapatkan faktor - faktor penyebab waste of lean. Ada 26 sub variabel penyebab waste of lean. Faktor penyebab waste yang paling besar pada variabel X3.1 adalah menunggu pendatangan keterlambatan material dengan nilai (r hitung) sebesar 0,928. Dari analisa data penelitian dapat disimpulkan strategi untuk mengurangi waste pada proyek ITB Science Techno Park Bandung adalah keberlanjutan penerapan lean construction tools. Lean construction tools pada proyek ini yang digunakan adalah The Last Planner System dengan cara membuat milestone dengan acuan master schedule. Kemudian dilanjutkan dengan membuat 3 Month Look Ahead, menyusun Weekly Work Plan dan Daily Work Plan. Langkah yang terakhir yaitu menganalisa waste level dengan Constraint log. Sehingga waste dapat diidentifikasi dan dapat segera diselesaikan.
RISK ANALYSIS OF CONSTRUCTION WASTE FACTOR IN THE CONSTRUCTION PROJECT OF APARTMENT WESTOWN VIEW SURABAYA Aushaf Helmi Anwar Ismail; Fadjar Purnomo; Devi Zettyara
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 6 No. 2 (2025): JUNI 2025
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v6i2.6496

Abstract

Construction waste refers to the depletion of resources resulting from activities that incur direct or indirect costs without add value to the final product or construction progress. This research aims to identify and analyze construction waste factors that influence the construction project of Apartment Westown View Surabaya. A quantitative approach through a questionnaire survey was applied, with respondents consisting of workers involved in the project. Data analysis was conducted using linear regression to determine the most influential factors, and the COSO ERM framework was used for risk management. The results revealed that the most influential factors on construction waste are: (1) Owner: X7.1; (2) Consultant: X2.3; (3) Contractor: X4.4; (4) All parties: X2.3. The overall project performance assessment shows: (1) approved cost increments, (2) approved time increments, (3) good quality of project performance, (4) sufficient level of satisfaction with project performance. The estimated risk mitigation costs are: (1) Owner: 2.76%, (2) Consultant: 2.07%, (3) Contractor: 1.96%, (4) All parties: 3.67% compared to contract value. This research offers important insights for construction project stakeholders to identify and mitigate factors that cause waste, with the aim of improving overall project efficiency and performance.
STUDI KELAYAKAN PROYEK PEMBANGUNAN PERUMAHAN GRIYA SUMBERGAMBI KECAMATAN GROGOL KABUPATEN KEDIRI Muhammad Bagas Recogab Yuwan; Fadjar Purnomo; Radhia Jatu Noviarsita Sakti
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 6 No. 4 (2025): DESEMBER 2025
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v6i4.7163

Abstract

Kecamatan Grogol yang merupakan wilayah di Kabupaten Kediri yang memiliki potensi berkembang yang tinggi. Perkembangan tersebut juga harus diiringi tersedianya hunian, oleh karena itu Perumahan Griya Sumbergambi adalah investasi yang tepat. Studi ini bertujuan untuk menganalisis kelayakan investasi proyek pembangunan Perumahan Griya Sumbergambi ditinjau dari aspek teknis, aspek pasar, dan aspek finansial. Analisis teknis diukur dengan parameter KDB, KLB, dan KDH. Analisis pasar dinilai dengan mengetahui minat konsumen melalui kuisioner. Analisis finansial diukur dengan parameter NPV, BCR, IRR, dan PP. Hasil analisis menunjukan semua tipe rumah memenuhi kelayakan teknis. Hasil analisis pasar menunjukan rumah tipe 36/60 diminati oleh 52,8% responden, sedangkan kedua tipe rumah 45/75 dan 63/105 diminati oleh 23,6% responden. Hasil analisis finansial menunjukan investasi memenuhi semua parameter kelayakan finansial.
STUDI KELAYAKAN PEMBANGUNAN ASRAMA MAHASISWA POLITEKNIK NEGERI MALANG Aura Muhayya Naadhirah; Fadjar Purnomo
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 6 No. 3 (2025): SEPTEMBER 2025
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v6i3.8170

Abstract

Sebagai salah satu kota pendidikan terbesar di Jawa Timur, Kota Malang mengalami peningkatan signifikan jumlah mahasiswa setiap tahunnya, termasuk di Politeknik Negeri Malang (Polinema). Kondisi ini menciptakan kebutuhan tinggi akan hunian sementara yang nyaman dan strategis, sehingga mendorong perlunya kajian terhadap rencana pembangunan asrama mahasiswa. Penelitian ini bertujuan untuk menilai kelayakan pembangunan asrama Polinema yang ditinjau dari 3 lokasi dan dipilih yang paling layak dari berbagai aspek, yaitu aspek pasar, aspek teknis, jumlah optimal kamar di tiap Gedung, aspek finansial yang mencakup proyeksi tarif  serta jumlah penghuni asrama di 10 tahun yang akan mendatang,  serta sensitivitas terhadap perubahan biaya dan pendapatan. Metode penelitian yang digunakan yaitu penyebaran kuesioner kepada mahasiswa, analisis teknis menggunakan parameter GSB, KDB, KLB, dan KDH, serta analisis finansial melalui pendekatan NPV, IRR, BCR, dan PP. Hasil studi menunjukkan bahwa pembangunan asrama mahasiswa ini dinilai layak berdasarkan minat mahasiswa yang tinggi, lokasi strategis yang memenuhi ketentuan teknis, dan hasil perhitungan finansial yang menunjukkan indikator positif. Selain itu, analisis sensitivitas membuktikan proyek tetap layak meskipun terjadi fluktuasi biaya atau penurunan pendapatan. Dengan demikian, proyek ini tidak hanya layak secara ekonomi, tetapi juga strategis untuk memenuhi  kebutuhan hunian mahasiswa. Studi ini diharapkan menjadi dasar pengambilan keputusan bagi pihak kampus maupun investor dalam pengembangan hunian vertikal di sekitar kawasan pendidikan.
PROJECT PLANNING GEDUNG GOR 1 PROYEK PEMBANGUNAN PARALYMPIC TRAINING CENTER KARANGANYAR Devi Meilinda; Fadjar Purnomo
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 6 No. 4 (2025): DESEMBER 2025
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v6i4.8675

Abstract

Gedung GOR 1 Proyek Pembangunan Paralympic Training Center Karanganyar merupakan proyek milik Kementerian PUPR yang terletak di Delingan, Kecamatan Karanganyar, Kabupaten Karanganyar, Jawa Tengah. Project Planning yang tepat diperlukan untuk merealisasikan proyek agar tepat waktu, biaya, dan mutu. Untuk itu penulis menyusun Project Planning yang mencakup (1) struktur organisasi; (2) site layout dan traffic management; (3) strategi metode pelaksanaan; (4) rencana mutu; (5) rencana K3; (6) penjadwalan proyek; (7) anggaran biaya. Data yang dibutuhkan adalah Detail Engineering Desain, Rencana Kerja dan Syarat-syarat (RKS), Analisa Harga Satuan Pekerjaan (AHSP) PUPR 2022, daftar harga satuan upah, alat, dan bahan Kabupaten Karanganyar 2023. Microsoft Project 2019 digunakan untuk penjadwalan, dan Microsoft Excel 2019 digunakan untuk rencana anggaran pelaksanaan (RAP) dan pembuatan Kurva-S. Hasil penyusunan diperoleh alternatif : (1) struktur organisasi yang paling efektif ;(2) site layout berdasarkan perhitungan safety index dan travelling distance dan traffic management memiliki akses yang efektif dan efisien; (3) stategi dan metode menggunakan zoning dengan menyesuaikan kondisi lapangan; (4) mutu berdasarkan quality plan dan setiap item pekerjaan mengacu spesifikasi teknis dan quality target; (5) rencana kesehatan dan keselamatan kerja disusun terdiri dari tujuan dan kebijakan keselamatan kontruksi, perlengkapan penunjang K3, rambu-rambu K3, tabel Hazard Identification, Risk Assessment, and Risk Control (HIRARC), prosedur tanggap darurat; (6) waktu pelaksanaan selama 295 hari kerja; (7) total rencana anggaran pelaksanaan (RAP) sebesar Rp 101.824.683.064,48.