KELAYAKAN TEKNIS DAN KEUANGAN PEMBANGUNAN PERUMAHAN DENGAN PARAMETER GREENSHIP RATING TOOL Joko Setiono; Taufiq Rochman
Prokons: Jurnal Teknik Sipil Vol 16, No 2 (2022): Agustus 2022
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v16i2.375

Abstract

AbstractThe idea of green building is adopted in residential dwellings to reduce environmental concerns by enhancing the environmental quality that impacts the health of building occupants and the surrounding environment. The application idea of green buildings is to address ecologically friendly features, which may be accomplished utilizing the Greenship Rating Tools evaluation requirements for residential construction. Prior to the building of housing, the most significant feature of this thesis is to conduct a technical and financial feasibility analysis. The Malang Residential Home data utilized in this study will be constructed on a 2-hectare plot with three house types: 48/66, 70/84, and 80/112. The necessary information consisted of a site plan, home design drawings, house technical specifications, and Malang's basic unit pricing for the 2018-2019 fiscal year. The evaluation of technical feasibility will be based on three parameters: BBC, BFC, and GBC. The financial viability will be evaluated using four parameters: NPV, BCR, IRR, and PBP. Additionally, the sensitivity would be examined based on variations in the proportion of capital, as well as an increase or decrease in the project's income and outcome. The research determined the technical feasibility of BBC to be between 60 and 75 percent, BFC to be between 0.60 and 1.0%, and GBC to be greater than 10%. The satisfaction of Parameter Greenship Rating Tools was awarded scores ranging from 3542 to 3542, placing Malang Residential Housing in the silver category. The financial feasibility analysis yielded NPV of IDR 1,382,745,228; BCR of 1.02; IRR of 59.75 percent; and PBP of 1 year and six months. Due to the sensitivity of the project's income and outcome to its viability, it was determined that the project was viableKeywords: green building, technical feasibility, financial feasibility
PENGARUH DIMENSI PENAMPANG TERHADAP RASIO DESAIN DAN LENDUTAN PADA INVERTED BEAM Wahiddin; Agus Sugiarto; Joko Setiono
Jurnal Teknik Ilmu dan Aplikasi Vol. 3 No. 2 (2022): Jurnal Teknik Ilmu dan Aplikasi
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Umumnya balok beton bertulang berada dibawah pelat pada suatu struktur beton bertulang. Dengan alasan lebih hemat, balok beton dapat diletakkan diatas pelat dan dinamakan inverted beam. Tujuan penelitian ini untuk melihat pengaruh ukuran penampang balok terhadap rasio desain dan besarnya lendutan yang terjadi pada inverted beam. Pada penelitian ini, sebuah portal beton bertulang dengan bentang tertentu sedemikian hingga pelatnya berupa one way distribution dan two way distribution load. Portal tersebut diberikan inverted beam dan balok normal dengan pembeban sebagaimana beban yang terjadi atap. Hasil analisis menunjukkan bahwa rasio desain inverted beam lebih besar 51,53 persen dibandingkan dengan kapasitas lentur balok normal pada pelat dengan distribusi beban one way dan 53,24 persen pada pelat dengan distribusi beban two way. Begitupula lendutan yang terjadi inverted beam lebih kecil 40,13 persen dan 48,82 persen dibandingkan dengan balok normal. Lendutan yang terjadi masih berada dibawah lendutan yang diijinkan sebuah balok beton bertulang.
OPTIMASI ALAT BERAT PEKERJAAN GALIAN DAN TIMBUNAN PROYEK JALAN TOL SOLO – YOGYAKARTA PAKET 1.1 STA 3+000 – STA 6+000 Alfitra Ramadhan; Joko Setiono; Sitti Safiatus Riskijah
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 1 (2024): MARET 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i1.3749

Abstract

Sering dijumpai alat berat dalam keadaan aktif namun tidak terfungsikan saat pekerjaan berlangsung karena target produktifitas alat tidak tercapai atau antrian muatan. Hal ini mengakibatkan kurang efektif dan efisien yang berdampak pada pembengkakan biaya dan memperlambat waktu pengerjaan. Sehingga diperlukan kombinasi alat berat agar tidak terdapat alat berat yang tak terfungsikan. Tujuan dari penelitian ini adalah untuk mengoptimasi alat berat dan menghitung biaya alat berat yang optimal. Penentuan solusi optimal menggunakan metode simpleks program linier. Hasil penelitian diperoleh: Volume pekerjaan striping 49.168,358 m3, pekerjaan galian 187.370,630 m3, dan pekerjaan timbunan 978.533,840 m3. Pekerjaan striping menggunakan alat excavator, dump truk, dan bulldozer dengan 8 alternatif kombinasi, pekerjaan galian menggunakan alat excavator, dumptruk, dan bulldozer dengan 8 alternatif kombinasi, dan pekerjaan timbunan menggunakan alat excavator, dumptruk, motor grader, vibratory roller, dan water tank truk dengan 8 alternatif kombinasi. Kombinasi alat berat yang optimal yaitu pekerjaan striping pada alternatif kombinasi tujuh dengan total biaya Rp 1,194,132,280; Pekerjaan galian pada alternatif kombinasi tujuh dengan total biaya Rp 4,716,870,141; dan Pekerjaan Timbunan pada alternatif kombinasi tiga dengan total biaya Rp 13,231,549,342. Jadi total biaya alat berat pada pekerjaan stripping, pekerjaan galian, dan pekerjaan timbunan sebesar Rp 19,142,551,762.
PROJECT PLANNING PEMBANGUNAN GEDUNG AUDITORIUM UNIVERSITAS BRAWIJAYA Thedy Irvansyah; Joko Setiono; Suhariyanto Suhariyanto
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 1 (2024): MARET 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i1.3754

Abstract

Proyek Pembangunan Gedung Auditorium ini berlokasi di Area Kampus Utama Universitas Brawijaya dan dilaksanakan pada saat pelaksanaan perkuliahan sedang aktif, maka diperlukan penyusunan project planning agar proses pembangunan berjalan sesuai rencana waktu, mutu dan biaya. Penulisan skripsi ini membutuhkan data berupa Gambar Kerja, Rencana Kerja dan Syarat, Analisa Harga Satuan, dan Bill of Quantity. Dengan data yang ada ini dapat dilakukan penyusunan Work Breakdown Structure, struktur organisasi, site layout dan traffic management dengan perhitungan safety index dan travelling distance, strategi dan metode pelaksanaan, pengendalian mutu, perencanaan K3L, selanjutnya dari data Analisa Harga Satuan, Work Breakdown Structure, strategi dan metode pelaksanaan dapat dilakukan penyusunan penjadwalan pekerjaan dan Rencana Anggaran Pelaksanaan. Hasil perencanaan ini struktur organisasi disusun menggunakan bentuk organisasi fungsional. (1) Perencanaan site layout disusun sesuai hasil perhitungan safety index serta travelling distance menggunakan alternatif 2. Penyusunan traffic management memiliki 2 akses keluar masuk, (2) Strategi dan Metode Pelaksanaan menggunakan metode zonasi, (3) Rencana mutu berdasarkan Standart Operational Procedure (SOP), (4) Perencanaan K3L berdasarkan analisis HIRARC (Hazard Identification Assasement and Risk Control), (5)  Perencanaan ini menghasilkan durasi proyek sebanyak 238 hari atau 34 minggu dengan (6) Rencana Anggaran Pelaksanaan sebesar Rp54.396.000.000.00.
STUDI KELAYAKAN TEKNIS DAN FINANSIAL PEMBANGUNAN PERUMAHAN D’GRAHA ARTHA NIRWANA MALANG Ratna Novianty; Susapto Susapto; Joko Setiono
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 1 (2024): MARET 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i1.3784

Abstract

Proyek Pembangunan Perumahan D’Graha Artha Nirwana Malang dibangun di lahan seluas ± 2,5 ha dengan tipe rumah yang berbeda, yaitu tipe perumahan 36/60, 45/60, dan 54/60. Pembangunan tersebut membutuhkan investasi yangsangat besar sehingga dilakukan studi kelayakan teknik dan finansial. Tujuan dari penelitian ini adalah untuk menganalisiskelayakan teknis berdasarkan parameter KDB (Koefisien Dasar Bangunan), KLB (Koefisien Lantai Bangunan), KDH(Koefisien Dasar Hijau), luas lahan efektif, dan Greenship Rating Tools. Selanjutnya, menganalisis site plan alternatif,menghitung kelayakan finansial berdasarkan parameter NPV (Net Present Value), BCR (Benefit Cost Ratio), IRR (InternalRate of Return), PP (Payback Period), dan menganalisis tingkat sensitivitas. Penelitian ini menggunakan metode kuantitatifdengan data yang digunakan adalah gambar teknis, RAB, brosur perumahan, dan spesifikasi tiap-tipe rumah. Hasil dari studikelayakan teknis parameter KDB antara 42% – 60%; KLB < 1; dan KDH > 10%; lahan efektif 49%. Tingkat pemenuhanGreenship Rating Tools mendapat poin antara 47 – 49 poin sehingga masuk peringkat Gold. Site plan alternatif dengan totalrumah sebanyak 51 unit tipe 36/60, 75 unit tipe 45/60, dan 80 unit tipe 54/60. Alternatif tipe rumah tersebut untuk pemenuhanGreenship Rating Tools menjadi kategori Platinum dengan mengubah fasilitas umum yang ada. Hasil kelayakan finansialdinyatakan layak dan menguntungkan dengan nilai NPV sebesar Rp13.006.149.003,00; BCR sebesar 1,28; IRR sebesar49,90%; dan PP selama 4 tahun 8 bulan. Hasil analisis sensitivitas menyatakan bahwa proyek investasi ini akan menjadi tidaklayak apabila terjadi pendapatan turun ≥ 25% atau pengeluaran naik ≥ 30%.
ANALISIS PENERAPAN SMK3 PADA PROYEK REHABILITASI PASAR JONGKE KOTA SURAKARTA Uswatun Hasanah; Diah Lydianingtias; Joko Setiono
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 4 (2024): DESEMBER 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i4.5654

Abstract

Penyebab utama dari kecelakaan kerja adalah masih kurangnya kesadaran dari pihak tenaga kerja mengenai keselamatan kerja dengan mengabaikan penggunaan Alat Pelindung Diri (APD), kurang disiplin, tidak mematuhi arahan, dari manajer. Analisis SMK3 yang dilakukan oleh peneliti di proyek ini dikarenakan yaitu, masa kekosongan HSE selama 2 bulan sehingga dalam masa itu tidak ada pengawas K3 di lapangan yang mengakibatkan banyak pekerja yang mengabaikan APD saat bekerja di lapangan. Tujuan Skripsi ini adalah untuk mengetahui penerapan SMK3, manajemen risiko, hambatan yang dihadapi dan memberikan solusi/tindakan, serta kebutuhan biaya K3 pada Proyek Rehabilitasi Pasar Jongke Kota Surakarta. Studi ini menggunakan metode survei dengan pengamatan langsung dan penyebaran kuesioner kepada 67 orang. Analisis dan pengolahan data menggunakan perangkat lunak IBM SPSS Statistics versi 23.0 untuk uji validitas dan reliabilitas. Perhitungan bobot dalam menentukan Indeks Kepentingan Relatif (IKR) yaitu untuk mengetahui penerapan dan perbaikan sistem yang ada. Berdasarkan hasil penelitian, Penerapan SMK3 di Proyek Rehabilitasi Pasar Jongke Kota Surakarta sudah diterapkan dengan sangat baik. Manajemen Risiko pada Proyek Rehabilitasi Pasar Jongke, Kota Surakarta telah berhasil dilaksanakan dengan sangat baik dan dapat disimpulkan bahwa proyek ini diklasifikasikan sebagai kategori tingkat kecelakaan sedang (medium accident). Terdapat 8 hambatan dalam penerapan SMK3 serta solusi dan tindakan untuk meminimalisir kecelakaan kerja di proyek konstruksi. Kebutuhan biaya K3 di Proyek Rehabilitasi Pasar Jongke Kota Surakarta yaitu sebesar Rp1.037.887.185,00 atau setara dengan 0,757% dari total biaya proyek konstruksi.
EVALUASI PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK APARTEMEN WESTOWN VIEW SURABAYA Dhiva Rizky Firdaus; Joko Setiono; Fauzi Akbar Rahmawan
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 4 (2024): DESEMBER 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i4.5726

Abstract

Proyek Pembangunan Apartemen Westown View Surabaya memiliki luas bangunan 50.885 m2 dan terdiri dari 45 lantai. Luas dan tingginya area kerja membuat risiko pekerjaan proyek yang cukup tinggi sehingga dibahas tentang Evaluasi Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Pada Proyek Apartemen Westown View Surabaya dengan tujuan untuk mengetahui sebarapa baik penerapan SMK3 pada proyek Pembangunan Apartemen Westown View Surabaya.Metode yang digunakan yaitu penyebaran kuesioner kepada pihak yang terlibat dalam proyek lalu diolah menggunakan software SPSS 2024 dan metode scoring untuk mengetahui seberapa besar presentase penerapan SMK3. Untuk identifikasi bahaya yang terjadi berdasarkan JSA pendekatan HIRARC. Untuk pembahasan hambatan dan solusi yang terjadi berdasarkan observasi dan kondisi di lapangan. Mendesain jalur evakuasi berupa layout menggunakan software Autocad 2020 dan Photoshop. Untuk Rencana Anggaran Biaya menggunakan standart acuan SE Menteri PUPR Nomor 11 Tahun 2019.Berdasarkan hasil penelitian, penerapan SMK3 di proyek berdasarkan penilaian 42 responden didapat nilai sebesar 83,79% menunjukkan bahwa penerapan SMK3 dilakukan dengan sangat baik. Hasil identifikasi metode HIRARC pada proyek ini menempati tingkat risiko rendah. Hambatan yang mempengaruhi penerapan SMK3 pada proyek ini adalah dari pihak yang terlibat dalam proyek, lingkungan kerja, dan sarana prasarana. Disusun jalur evakuasi dengan tujuan untuk mencegah terjadinya insiden atau hal-hal yang tidak diinginkan pada proyek ini. Rencana Anggaran Biaya K3 sebesar Rp. 2.160.099.960,00.
EVALUASI PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PROYEK PEMBANGUNAN RUMAH SAKIT KASIH IBU SURAKARTA Andreas danny meidika; Joko Setiono; Fadjar Purnomo
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 6 No. 1 (2025): MARET 2025
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v6i1.5806

Abstract

Penelitian tentang “EVALUASI PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PROYEK PEMBANGUNAN RUMAH SAKIT KASIH IBU SURAKARTA” bertujuan untuk Mengetahui penerapan K3, pengelolaan limbah, SOP penerapan K3 dan rencana anggaran biaya penerapan K3. Metode penyebaran kuesioner dan pengolahan data menggunakan SPSS merupakan cara penelitian pada penerapan K3. Penelitian pengelolaan limbah menggunakan kuesioner dan Peraturan Pemerintah. Perencanaan SOP konsultan pengawas menggunakan standar Work Breakdown Structure. Penyusunan rencana anggaran biaya menggunakan Harga Satuan Dasar Provinsi Jawa Tengah Tahun 2024. Hasil penelitian sistem manajemen keselamatan dan kesehatan kerja menunjukkan hasil yang sangat baik yaitu 92,24% dan pada pengelolaan limbah mendapatkan penilaian baik yaitu 84%. SOP penerapan K3 berdasarkan WBS dengan hasil HIRADC. Nilai RAB SMK3 pada Proyek Pembangunan Rumah Sakit Kasih Ibu Surakarta sebesar Rp.4.810.410.000,-