Claim Missing Document
Check
Articles

Found 2 Documents
Search

PEMBERDAYAAN UMKM KOPI LIBERICA DI DESA CIPASUNG MELALUI AGROWISATA DAN EDUKASI MANFAATNYA. Indriyani, Oktavia; Salsabila, Dina; Fauzan, Raihan; Ridha, Mohammad; Nurizqy, Fara Fadya Azzahra; Mahardeka, Adelia Putri; Yumna, Farras Fida; Pradana, Muhammad Firyal; Zhafranudin, Muhammad Fakhri; Sumarto, Findi Amilia; Muslimah, Nur Annisa; Ramadhani, Shella; Fujiyanto, Fujiyanto; Izaz, Rofiq Khoirul; Wahadi, Wahadi; Senja, Nurul
Jurnal Abdimas Bina Bangsa Vol. 6 No. 1 (2025): Jurnal Abdimas Bina Bangsa
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/jabb.v6i1.1739

Abstract

Liberica coffee is one of the superior commodities in Cipasung Village, which has the potential to be developed through agritourism and community empowerment. However, Liberica coffee SMEs in this area face various challenges, including limited market access, processing technology, and product promotion. This study aims to optimize the potential of Liberica coffee SMEs by developing agritourism and Sharing Sessions with students from Universitas Swadaya Gunung Jati Cirebon. The research employs a qualitative descriptive approach through interviews, observations, and documentation studies. The results show that agritourism not only increases the economic value of coffee but also enhances community knowledge through direct visitor participation in the coffee production process. Additionally, Sharing Sessions with students provide insights into product innovation and marketing strategies. This holistic approach is expected to strengthen local economic sustainability and increase the competitiveness of Liberica coffee SMEs.
Construction Management Analysis of the Cimunjul Bridge Development on the Bogor – Ciawi – Sukabumi Toll Road (Bocimi) Section 3 Ula, Ade Yusrizal; Fujiyanto, Fujiyanto; Rafsanjani, M. Hildan; Mulyono, Heri; Farhan, Ohan
Interdiciplinary Journal and Hummanity (INJURITY) Vol. 5 No. 1 (2026): Injuruty: Interdiciplinary Journal and Humanity
Publisher : Pusat Publikasi Nusantara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58631/injurity.v5i1.1514

Abstract

This study analyzes time and cost management in the construction of the Cimunjul Bridge on the Bogor-Ciawi-Sukabumi (Bocimi) Toll Road Section 3 with the dimensions of the bridge, which is 254,663 meters long and 32.4 meters wide. The purpose of building the Cimunjul bridge on the Bocimi Toll Road section 3 is to connect Parungkuda – West Sukabumi. The purpose of the research is to plan Time and Cost management based on the Analysis of Work Unit Prices (AHSP) of Cirebon Regency Highways in 2025 and to determine what are the factors that affect time and cost efficiency in the construction of the Cimunjul Bridge on the Bogor – Ciawi - Sukabumi (Bocimi) Toll Road Section 3. The method used is a quantitative approach with primary data from the Project and field observations. The results of the study show that the calculation from the Cimunjul Bridge Cost Budget Plan (RAB) using the Cirebon Regency Highway Highway Work Unit Price Analysis (AHSP) in 2025 is worth IDR 190,985,225,558.80 with a work time of 183 days. Work delays are generally caused by resource constraints and weather factors, while cost efficiency can be achieved through strict time control using the Critical Path Method (CPM) method.