Claim Missing Document
Check
Articles

Found 23 Documents
Search

PENILAIAN RISIKO KETERLAMBATAN PROYEK KONSTRUKSI (STUDI KASUS ; GEDUNG DPRD KABUPATEN PASAMAN) Kharisma Permata Sari; Maiyozzi Chairi; Asri Yuda Trinanda; Muhammad Agrival
JURNAL RIVET Vol 3 No 02 (2023): Desember 2023
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v3i02.1232

Abstract

PROSEDUR PENGENDALIAN MUTU STRUKTUR BETON TEKNOLOGI PRECAST PEMBANGUNAN RUMAH SUSUN SUMATERA BARAT Utami Dewi Arman; Afrilda Sari; Maiyozzi Chairi
JURNAL RIVET Vol 4 No 02 (2024): Desember 2024
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v4i02.1789

Abstract

Dalam pelaksanaan pembangunan konstruksi di Indonesia ditemui banyak kegagalan bangunan dengan salah satu penyebabnya adalah pelaksanaan konstruksi yang tidak sesuai dengan perencanaan mutu pekerjaan konstruksi. Penelitian ini bertujuan untuk merekomendasikan standar prosedur pengendalian mutu pekerjaan struktur beton dengan teknologi precast. Penelitian merupakan penelitian kualitatif dan dilakukan pada proyek pembangunan rumah susun Sumatera Barat. Pengumpulan data dilakukan dengan pengumpulan data dokumen meliputi RKS dan shop drawing, dan wawancara kepada responden terpilih kepada pemilik proyek, kontraktor dan supplier ready mix concrete. Temuan-temuan penelitian menghasilkan rekomendasi standar pengendalian mutu pekerjaan kolom, balok dan pelat dengan teknologi precast secara sistematis
Analisa Perbandingan Rencana Mutu Kontrak (RMK) Antara Penyedia Jasa Dengan Standar Pekerjaan Umum Kharisma Permata Sari; Maiyozzi Chairi; Mediana Desfita; Riki Hendra Faismon4
JURNAL RIVET Vol 4 No 02 (2024): Desember 2024
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v4i02.1799

Abstract

One way that contractors or service providers do to provide satisfaction to customers or service users, by improving the quality of the services offered. One of the applications is to compare the Contract Quality Plan (RMK) Document implemented by contractors or service providers for the Solok City Hospital Development Advanced Project and the Marahadin Laing Football Field Construction Advanced Project. This research method is quantitative with a comparative method that compares two or more of a variable, situation, event, activity or in the form of similarities and differences in planning and implementation. Based on the evaluation of the completeness of the contents of the Contract Quality Plan (RMK) document, the total percent obtained from the evaluation of the completeness of the contents of the Contract Quality Plan Document (RMK) obtained from the Solok City Hospital Construction Continuation Project was 61.90% and the Marahadin Laing Football Field Construction Continuation Project was 54.76%. This assessment is carried out based on the completeness of the contents of the Contract Quality Plan Document which refers to the Contract Quality Plan Document (RMK) which regulates in the Regulation of the Minister of General Employment Number: 04/PRT/M/2009.