cover
Contact Name
Husnah
Contact Email
husnah@univrab.ac.id
Phone
-
Journal Mail Official
jurnal.ts@univrab.ac.id
Editorial Address
Redaktur Jurnal RACIC Universitas Abdurrab: Gedung Universitas Abdurrab Pekanbaru Jl. Riau Ujung No. 73 Pekanbaru Riau - Indonesia
Location
Kota pekanbaru,
Riau
INDONESIA
RACIC : Rab Construction Research
Published by Universitas Abdurrab
ISSN : 25277073     EISSN : 26203170     DOI : https://doi.org/10.36341/racic
Core Subject : Engineering,
RACIC "Rab Construction Research" (ISSN 2527-7073) adalah Jurnal yang dikelola oleh Program Studi Teknik Sipil, Fakultas Teknik Universitas Abdurrab, yang terbit secara berkala dalam dua edisi per tahun.
Arjuna Subject : -
Articles 165 Documents
TINJAUAN PENETRASI INDEKS ASPAL PERHADAP PENAMBAHAN LIMBAH POME Alfian Saleh; Muthia Anggraini
Racic : Rab Construction Research Vol 5 No 2 (2020): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v5i2.1403

Abstract

Asphalt is an aggregate binding material in road pavement construction that plays a very important role in determining pavement performance although its composition is around 4-10% based on the total weight of the mixture. One effort that can be done to overcome these problems is to reduce dependence on oil asphalt by developing alternative binders. The addition of pome waste to asphalt becomes an alternative as a binding agent that can bind aggregates to asphalt pavement which is determined at the penetration value and asphalt softening point. In this study the penetration value and softening point without adding pome waste were 62.2 mm and 48.5 ° C then pome waste was added by 1%, 2%, 3%, 4% and 5%. From the addition of this pome waste to the penetration value has decreased while for the softening point with the addition of this pome waste has increased. For the penetration value of the index with the addition of pome waste, the penetration value of the index has increased from -0,686 for asphalt without the addition of pome waste increased to -0,245 at 5% addition, this indicates that the addition of pome waste makes the asphalt sensitive to temperature.
ANALISIS KETERLAMBATAN PEMBANGUNAN TOL DENGAN METODE STOKASTIK DAN MITIGASI RISIKO Muhammad Iqbal
Racic : Rab Construction Research Vol 5 No 2 (2020): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v5i2.1414

Abstract

Berdasarkan informasi dari pihak kontraktor dan pemilik proyek, didapat bahwa Pembangunan Jalan Tol ini mengalami keterlambatan yang signifikan dalam penyelesaiannya. Tujuan dari studi kasus ini adalah untuk mengidentifikasi, menilai, mensimulasikan dan mengurangi risiko keterlambatan Pembangunan Jalan Tol dengan metode Stokastik dan Mitigasi Risiko. Pada kenyataannya ditemukan beberapa artikel keterlambatan proyek jalan tol, tetapi pada studi kasus ini diharapkan dengan mengkombinasikan 2 metode analisis di atas diharapkan dapat memberi masukan baru bagi para peneliti. Hasil mitigasi mengurangi durasi waktu keterlambatan proyek yang relatif maksimal dan sesuai dengan tujuan penelitian. Dari identifikasi risiko, didapat 9 risiko yang berpengaruh terhadap kinerja waktu. Beberapa risiko yang paling besar berpengaruh terhadap kinerja waktu diantaranya : terkait pembebasan lahan, Investigasi tidak memadai sebelum pekerjaan desain dan data survei tidak akurat (pra desain). Analisa risiko terhadap waktu berdasarkan analisa Stokastik didapat bahwa dengan tingkat keyakinan 90% maka kemungkinan proyek dapat diselesaikan dalam waktu diantara 782 - 821 hari, dalam realisasinya proyek Pembangunan Pembangunan Tol ini menghadapi keterlambatan hingga 1112 hari (pobabilitas kejadiannya adalah diatas 95%).
PERENCANAAN TRAFFIC LIGHT SIMPANG EMPAT JL. HR SOEBRANTAS PANAM – JL. RAYA PEKANBARU – JL. KUBANG RAYA – JL. GARUDA SAKTI KOTA PEKANBARU Muthia Anggraini; Ery Irawan; Winayati winayati
Racic : Rab Construction Research Vol 6 No 1 (2021): Juni
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v6i1.1415

Abstract

Simpang empat Jalan HR Soebrantas, Jalan Raya Pekanbaru, Jalan Kubang Raya, dan Jalan Garuda Sakti Pekanbaru merupakan jalan raya yang padat akan kendaraan, dan sering terjadi masalah dikarenakan tidak adanya lampu lalu lintas untuk mengatur lalu lintas pada simpang tersebut. Untuk itu perlu direncanakan traffic light pada simpang empat tersebut agar dapat mengatasi kemacetan yang terjadi dan mengurangi tingkat kecelakaan, dan dapat membuat lalu lintas pada simpang empat tersebut berjalan dengan baik, aman, dan nyaman. Tujuan penelitian untuk merencanakan traffic light pada persimpangan Jalan HR Soebrantas, Jalan Raya Pekanbaru, Jalan Kubang Raya, dan Jalan Garuda Sakti. Metode penelitian yang digunakan merupakan metode dari Pedoman Kapasitas Jalan Indonesia (PKJI) 2014. Hasil penelitian didapat volume lalu lintas maksimum terjadi pada hari senin tanggal 17 Februari 2020, perencanaan dengan 2 fase didapat hasil waktu siklus 33 detik dengan derajat kejenuhan <0,65, perencanaan 3 fase didapat waktu siklus 77 detik dengan derajat kejenuhan <0,85 dan perencanaan 4 fase didapat hasil waktu siklus 145 detik dengan derajat kejenuhan 0,90. Kesimpulan yang didapat dari hasil perencanaan, persimpangan lebih baik digunakan pengaturan 3 fase karena waktu siklus yang didapat lebih kecil dari waktu siklus layak yaitu 77 detik < 100 detik dengan derajat kejenuhan < 0,85.
PENANGANAN SIMPANG DI TINJAU DARI ASPEK TEKNIS DAN EKONOMI( study kasus jalan Hr Soebrantas dan jalan Garuda sakti) Heru Wakhidho
Racic : Rab Construction Research Vol 5 No 2 (2020): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v5i2.1423

Abstract

Kota Pekanbaru yang merupakan pusat regional Riau yang memikul tiga fungsi kegiatan utama, yakni pusat kegiatan pemerintahan, pusat kegiatan perdagangan dan pusat kegiatan transportasi Penelitian ini bertujuan untuk menganalisis tingkat pelayanan simpang berdasarkan data lalu lintas simpang tersebut apakah derajat jenuhnya sudah melewati ambang batas DS = 0,75. Jika nilai DS>0,75, akan dikaji penerapan beberapa alternatif penanganan untuk meningkatkan tingkat pelayanan simpang, untuk kemudian dipilih lagi alternatif terbaik untuk jangka pendek, menengah dan panjang. Metode pengumpulan data yang digunakan dalam penelitian ini adalah metode traffic counting, sedangkan untuk pengkajian alternatif penanganan simpang secara teknik menggunakan metode MKJI 1997, secara ekonomi menggunakan metode LAPI ITB, analisa nilai waktu dengan nilai waktu hasil penelitian Dirjen Bina Marga dan analisa biaya investasi dengan analisa Benefit Cost Ratio dan Net Present Value. Selain itu digunakan juga metode analisa geometrik untuk memproyeksikan jumlah Lalu lintas Harian Rerata (LHR).
Analisis Pelat Lantai Menggunakan Metode Hirzfeld Novia Siti Rohana; Mahfuz Hudori
Racic : Rab Construction Research Vol 6 No 1 (2021): Juni
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v6i1.1513

Abstract

At this time construction of the royal house is growing very fast at Batam City. The matter proves that are people's construction is successfully for planning the building at Batam City. Floor Slab Analysis with Hirzfeld Method done for knowing the main deflection coefficient and flexible moment of the floor slabs with different dimensions are have different four cases. After analyzed then, obtain results that are the higher dimension of the floor slab then obtain the higher deflection coefficient and flexible moment also.
PENGARUH PERUBAHAN TUTUPAN LAHAN TERHADAP ALIRAN PERMUKAAN PADA SUB DAS KAMPAR KANAN jefrizon jefrizon
Racic : Rab Construction Research Vol 6 No 1 (2021): Juni
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v6i1.1540

Abstract

Kampar watershed has a length of 580 km, with a catchment area of 21,086 km2, a maximum discharge of 2,200 m3 / s, a minimum discharge of 49 m3 / s. The largest level of damage in 4 major watersheds in Riau Province is located in the Kampar watershed, reaching 5,986 hectares. This study aims to analyze the effect of changes in land cover on surface runoff in the right sub-watershed using SWAT (hydrological model (soil water assessment tool). From the research results, changes in land use from 2009 to 2018 tend to increase precipitation from 3866.33 mm to 4687.94. Significant changes occurred in the water yield or the total amount of water entering the main river during the simulation period from 1722.65 mm to 3633.75 mm. The results of the calibration using the monthly discharge data from 2010 - 2011, the results of observations and predictions on the Lake Bingkuang SPAS were 276.70 m3 / s and 354.98 m3 / s. The results of the validation using the monthly discharge data for 2018 are 115.63 m3 / s and 93.03 m3 / s. The weight value and score of each performance of the right Kampar Sub-watershed in 2009 - 2018 shows that the percentage of vegetation cover (PPV) with a weight of 20%, a score of 0.5. Flow Regim Coefficient with a weight of 5%, a score of 0.75, while the annual flow coefficient with a weight of 5%, score, 0.5. The total number of watershed performance assessments with a weight of 30%, a score of 1.75, and the results of the assessment is 16.25 so that the performance results of the right Kampar Sub-watershed is 0.54.
ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK REHABILITASI SEKOLAH DALAM MASA PANDEMI COVID-19 Gusni Vitri; Wendi Boy; Wiwin Putri Zayu
Racic : Rab Construction Research Vol 5 No 2 (2020): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v5i2.1543

Abstract

Implementation of construction projects requires resources of materials, labors, equipments, methods and capital to achieve project objectives, namely on time, on quality and according to planned costs. Various internal and external factors influence during project implementation. The conditions of the Covid-19 pandemic that occurred in Indonesia and the world were one of the factors inhibiting project completion. The Primary School Rehabilitation Project in West Pasaman Regency is spread over 15 (fifteen) locations in all sub-districts. The project was contracted in early 2020, before the Covid-19 outbreak erupted. This project has been delayed due to the implementation with 2 (two) addendums to extend the implementation time. This research is descriptive quantitative and qualitative, with data collection techniques through questionnaires and direct interviews with respondents, that are Contractor, Construction Management Consultant and Owner (Ministry of Public Works, Housing and Building Information Center Work Unit West Sumatra Province). The results showed that the most dominant cause of project delays was Force Majeure, Government Policy, Design. Apart from that, other factors that also influence are the weather, the characteristics of the place and the materials.
STUDI ANALISIS DAMPAK LALU LINTAS AKIBAT PEMBANGUNAN KAMPUS II INSTITUT TEKNOLOGI PADANG (STUDI KASUS JALAN DPR AIR PACAH KOTA PADANG) Angelalia Roza; Wilton Wahab; Afrizal Putra Prices
Racic : Rab Construction Research Vol 5 No 2 (2020): Desember
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v5i2.1551

Abstract

Institut Teknologi Padang merupakan kampus teknik tertua yang terletak di kota Padang provinsi Sumatera Barat, yang terletak pada dua lokasi kampus yang berbeda yaitu; (1) kampus I di Jalan Gajah Mada, Kecamatan Nanggalo dan (2) kampus II di Jalan DPR kelurahan Air Pacah. Saat ini ITP sedang melakukan pembangunan kampus II di atas lahan seluas ± 1,5 HA. Pembangunan Kampus II ITP tersebut tentu akan menimbulkan bangkitan perjalanan yang lebih besar seiring peningkatan volume lalulintas. Peningkatan volume lalulintas akan menimbulkan ketidakseimbangan antara jumlah lalulintas yang di bangkitkan dan kapasitas jalan di sekitar Kampus II ITP Padang. Penelitian ini bertujuan untuk menganalisis seberapa besar dampak lalulintas disekitar kawasan kajian akibat pembangunan kampus II ITP. Analisis yang dilakukan meliputi analisis bangkitan dan tarikan, analisis kinerja ruas jalan, dan analisis penanganan dampak lalulintas pada kondisi pra konstruksi, masa konstruksi dan pasca konstruksi. Hasil penelitian ini menunjukkan bahwa kinerja ruas jalan DPR pada kondisi pra konstruksi dan masa konstruksi berada pada level B (kinerja baik), namun pada masa pasca konstruksi 5 tahun berada pada level C (kinerja cukup). Sedangkan kinerja ruas jalan Bypass baik dari arah Bandara BIM maupun dari arah Teluk Bayur pada kondisi pra konstruksi, masa konstruksi, dan pasca konstruksi 5 tahun berada pada level B (kinerja baik) namun sudah mendekati level C (kinerja cukup).
IDENTIFIKASI JENIS-JENIS KERUSAKAN JALAN (PERKERASAN LENTUR) STUDI KASUS JALAN LINTAS TALUK KUANTAN – BATAS PROVINSI SUMATERA BARAT fitridawati soehardi; Toyip Setiawan; Winayati Winayati
Racic : Rab Construction Research Vol 6 No 1 (2021): Juni
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v6i1.1577

Abstract

Jalan Taluk Kuantan – Batas Provinsi Sumatera Barat merupakan salah satu ruas jalan alternatif yang dapat menghubungkan tiga provinsi yaitu, Provinsi Riau, Provinsi Sumatera Barat, dan Provinsi Jambi. Jalan tersebut merupakan jalan Nasional (lintas tengah) dengan jumlah LHR yang cukup tinggi, sehingga mengakibatkan kerusakan pada badan jalan. Penelitian ini bertujuan untuk menilai tingkat kerusakan lapisan perkerasan lentur guna mengetahui jenis dan tingkat kerusakan yang terjadi serta menentukan jenis pemeliharaan yang sesuai. Metode yang digunakan adalah metode Asphalt institute, untuk menentukan nilai kondisi perkerasan (Pavement Condition Rating) PCR. Adapun jenis kerusakan yang terdapat pada jalan ini di antaranya Ambles 2,303%, sungkur 1,499%, retak memanjang 0,395%, retak kulit buaya 0,312%, retak blok 0,297%, retak berkelok 0,149%, retak pinggir 1,379%, butiran lepas 0,120%, kegemukan 0,043%, aus/agregat licin 2,397%, terkelupas 0,126%, lubang 0,030%. Persentase total kerusakan jalan di sepanjang lokasi penelitian adalah: 9,05%, Nilai Indeks Kondisi kerusakan jalan menurut metode Asphalt Institute adalah 90,95%. Sehingga diperlukan pemeliharaan rutin seperti, pengisian retak , menutup lobang (patching)
STRATEGI PENANGANAN LALU LINTAS PADA KAWASAN CENTRAL BUSINESS DISTRICT (CBD) DI KOTA PEKANBARU BERDASARKAN PENDEKATAN TEKNIS agru maulana
Racic : Rab Construction Research Vol 6 No 1 (2021): Juni
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v6i1.1579

Abstract

The problem of congestion in Indonesia is often resolved only by improving / supplying the road network through widening or adding roads. This is a practical strategy to respond to the demand for increased transportation, but this strategy is temporal in nature and actually encourages higher growth rates of motorized vehicles in cities. Traffic management is one of the traffic management strategies that make maximum use of existing transportation infrastructure and facilities. The Central Business District (CBD) or the City Center Region (DPK) is the center of all city activities and a strategic location for city-scale trading activities. One of the traffic problems in Pekanbaru City, especially the activity center area of ​​Jalan Jenderal Sudirman (in front of STC - Jalan Ir Juanda) is the poor performance level of the road both in terms of speed, traffic volume and also the density that occurs on the Jalan Jenderal Sudirman section. . From these problems, the problem solving is through traffic management by applying several scenarios using vissim, namely controlling street vendors, on street parking control, one-way / flow diversion systems and signalized intersection cycle arrangements. The most optimal scenario is to control the parking lot and change the parking angle of Jalan General Sudirman and Jalan Juanda to an angle of 300 and the application of Jalan M. Yamin into a one-way system to Jalan Sudirman and setting the cycle of signalized intersections so that the performance of the road is smaller at the level C (0.45-0.74).

Page 8 of 17 | Total Record : 165