cover
Contact Name
Adhie Tri Wahyudi
Contact Email
adhie@setiabudi.ac.id
Phone
-
Journal Mail Official
tekinfo@setiabudi.ac.id
Editorial Address
-
Location
Kota surakarta,
Jawa tengah
INDONESIA
Tekinfo | Scientific Journal of Industrial and Information Engineering
Published by Universitas Setia Budi
ISSN : 23031476     EISSN : 23031867     DOI : -
Scientific Journal of Industrial Engineering and Information (Tekinfo) is a journal managed by Study Programme of Industrial Engineering, Faculty of Engineering, Universitas Setia Budi. Tekinfo published every six months, in May and November in each year. Our published manuscript covers disciplines of Industrial Engineering and Information Technology. We are open to readers and researchers to contribute submit the articles. It is our hope that research published at Tekinfo provide a meaningful contribution to the development of science and technology. Our thanks to all the researchers who participated also to the readers of the Tekinfo journal. Each article published in Jurnal Tekinfo is Open Access. Full text can be freely accessed, but still observes the principles of literacy in terms of citations or references.
Arjuna Subject : -
Articles 169 Documents
Analisis Strategi Pengembangan Usaha The Blangkon Village Kabupaten Klaten Ita Lusiyana; Ainur Komariah; Suprapto Suprapto
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 12 No 1 (2023)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v12i1.2136

Abstract

Rapid economic growth requires an industry to be able to identify capabilities to maintain and develop its business. The Blangkon Village is a business that has been producing blangkon crafts since 2019. The products produced by The Blangkon Village are the Solo model blangkon and the Yogyakarta model blangkon. Currently, the phenomenon of wearing blangkon is increasing, for example, several regional governments have a policy that government employees are required to wear regional clothing according to predetermined dates. This will affect the volume of demand for complementary traditional clothing, one of which is the blangkon. This kind of phenomenon is one of the reasons why blangkon entrepreneurs continue to increase. Moreover, the development of social media offers many blangkon products with various qualities and prices. Therefore, to face market competition, The Blangkon Village is required to always be ready to face existing competition with the right strategy. The purpose of this research is to formulate appropriate strategies for business development at The Blangon Village. This research uses a combination of the AHP and SWOT methods. The results of this research show that The Blangkon Village is in quadrant I position so that the appropriate development strategy is the SO strategy. SO strategies that can be used include increasing the quality and quantity of production, always innovating products by paying attention to product quality, expanding marketing areas using access to information such as social media and actively participating in exhibitions, and maintaining consumer trust by improving product quality.
Implementasi Sistem One Piece Flow untuk Mengurangi Lead Time Produksi pada Industri Garmen Nancy Oktyajati; Sri Mayasari; Sri Purwati
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 12 No 1 (2023)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v12i1.2185

Abstract

Garment industry often faces many problems such as low productivity, long lead time production, high product rework and rejection, improper line balancing, and inflexible style running changeover. The aim of this research is to implement one of the lean concept tools namely one piece flow. This study focuses on Sewing Department of Man Shirt Unit in a Garment Company in Central Java, Indonesia. The study of this paper includes the description of garment manufacturing process flow and comparison between the batch production system and one-piece flow system. The performance criteria used in this study is the total processing time, the basic pitch time, the production targets and the throughput time. The time study is used as the measurement method to determine the cycle time and throughput. From the analysis, one piece flow system performs better in term of total processing time, the basic pitch time and the throughput time and the target achievement than batch production system. The total processing time and pitch time reduced by 6.42 % and 0.385% respectively. The daily target quantity increased by 8.609% and tThe troughput time of 1 piece of good garment in assembly line reduced from 3.35 hour to 0.915 hour.
Pengendalian Kualitas terhadap Critical Processes pada Hanger Line Proses Sewing di PT. XYZ Menggunakan Metoda FMEA dan FTA Eko Setiawan; Desy Evi Oktaviana
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 12 No 1 (2023)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v12i1.2198

Abstract

Observation to critical processes at the hanger line of sewing process in PT. XYZ .found that there were defect and repair products. This research aims to controlling the quality of the critical processes in such away that the defect and repair products be minimized. The Failure Mode and Effect Analysis (FMEA) is applied to prioritize the defect types. Root causes of the defects are obtained by applying the Fault Tree Analysis (FTA), leading to the improvement proposal. The research found that Inconsistent welt pocket (RPN value 100) and imbalanced collar (RPN value 84) as the causes with the two highest risks. Proposed improvements proposed for these causes are the leveling of the panel in the acrylic; the need to make sure that the acrylic used is in accordance with the style being produced; the need for supervision to monitor the performance of the operators; the need for counseling for the operators; the need to make sure that the back body and the front body equal and match the approved sample; the need to make sure that the collar size fits and matches the approved sample; and the provision of pattern styles as references for the operators.
Pemetaan Efektivitas dan Efisiensi Metode Desain Produk: Telaah Pustaka Widyastuti Widyastuti; Erni Suparti; Alva Edy Tontowi
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 12 No 2 (2024)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v12i2.2277

Abstract

Identification of user needs and their conversion into product specifications is an important stage in the product design process. The large number of design methods currently available is a challenge for designers in choosing an effective and efficient design method. The aim of this literature review was to identify the use of product design methods between 2019-2023, mapped the effectiveness and efficiency of existing product design methods. Identification process used bibliometric analysis of articles in the SCOPUS database. VOSviewer software was used in the analysis process with co-occurence type and full-counting calculation methods. Effectiveness mapping was based on 7 criteria (E1 - E7) and efficiency based on 3 criteria (F1 - F3). The identification results show that the design methods that have been widely used in the last five years were value engineering, quality function deployment, user centered design, universal design, kansei engineering and TRIZ. The mapping results show that effective and efficient methods were QFD and value engineering. The effectiveness and efficiency of other methods were explained in more detail in this review.
Pengendalian Kualitas dengan Menggunakan Metode Six Sigma dan Multivariate Exponentially Weighted Moving Average (MEWMA) pada Produk EQ Spacing di PT Sinar Semesta Alvito Shultan Alfiansyah; Elly Wuryaningtyas Yunitasari; Kusmendar Kusmendar
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 12 No 2 (2024)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v12i2.2300

Abstract

In the production process of EQ Spacing products at PT Sinar Semesta, it was discovered that there were eight types of defects which resulted in product defects exceeding company standards. The aim of this research is to carry out a series of analyzes and actions focused on controlling product quality and identifying various aspects that require improvement during the production process. The types of defects with the highest percentage include uneven surfaces at 35.3%, porous at 24.9%, and chipped at 19.3%. Using the Multivariate Exponentially Weighted Moving Average (MEWMA) approach with a weight of 4.05, shifts were found in periods 6, 10, 11, 12, 13, 14, and 15 of the MEWMA graph, with a DPMO value of 24268 and a sigma of 3.5. This analysis demonstrates that in order to prevent excessive defects, production process performance must be improved. PT Sinar Semesta must suggest modifications based on the 5W+1H approach in order to lower the quantity of flaws in bag products. The goal of this quality improvement is to get closer to zero defects and a very low failure rate. It is intended that by doing this, the final product will be superior and satisfy the company's quality requirements.
Pengukuran Tak Langsung pada Proses Kerja Eksisting dan Perbaikan Produksi Tempe dengan Metode Maynard Operation Sequence Technique Nia Yunita Listianingrum; Amalia Amalia; Arokib Darjat Saputra; Felix Christian Santoso
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 12 No 2 (2024)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v12i2.2371

Abstract

Time measurement is carried out to determine the length of time required for workers to complete the production process, starting from raw materials to finished goods. Due to the low production volumes, the Barokah Tegal Tempe Home Industry's tempeh production process is not producing optimal results, which prevents them from fulfilling customers’ demands. Limited production capabilities due to lengthy processing times. Extended processing durations may result from non-value-adding movements or activities, as well as manual labor techniques. The aim of this research is to examine the tempe production process, with a focus on the three primary work stations—the peeling, washing, and mixing operations. The method used is the Maynard Operation Sequence Technique (MOST), where measurements are carried out on existing conditions and proposed work improvements. The research results show that the existing time measurement in the peeling process is 104,840 Time Measure Units (TMU), washing 316,020 TMU, and mixing 127,360 TMU. In order to reduce processing time, work tools should be able to do away with pointless movements. The proposed work improvement time for peeling process is 60,680 TMU, washing 93,800 TMU, and mixing 50,300 TMU. Calculations of the existing condition and proposed improvement can result in a 62% increase in working time efficiency.
Pengukuran Kinerja Manajemen Rantai Pasok di Perusahaan Logistik dengan Model SCOR 11 Muhammad Ave Sina
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 12 No 2 (2024)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v12i2.2372

Abstract

Business rivalry nowadays involves more than just one advantage of a good or service provided the owner of the good or service must also could enhance the advantages of the good or service itself. so that customers can get several benefits from a single good or service. Customers will begin to avoid similar items and services in favor of those made by businesses that can produce their goods with a multitude of advantages if a firm can accomplish this with quality that doesn't suffer. Companies that sell a variety of goods, one of which is in the logistics industry. The growth of e-commerce has raised this logistics company's value. If supply chain management is used in logistics organizations, it will be particularly relevant because there are numerous parties involved. PT. X is among the logistics firms having adopted supply chain management. As the logistics industry becomes more competitive, PT. X has also incorporated supply chain management. In order to evaluate PT Source's supply chain management performance, five criteria reliability, responsiveness, cost, agility and asset management along with make, delivery and return are taken into consideration. Reported to the testing results of this study, the reliability attribute's value at the process source is 100%, meaning it needs to be preserved. Subsequently, the attribute's value in the delivery process is 36.90%, and the attribute's response takes 9 days. The attribute fee is IDR 1,447,150,000.00 in the interim. Next, the asset management attribute is IDR 1,584,318,187.00, and the agility attribute is 3 days.
Dampak Pandemi Terhadap Kinerja Proyek Konstruksi Industri di Indonesia Intan Permatasari; Iva Mindhayani
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 12 No 2 (2024)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v12i2.2389

Abstract

The Covid-19 outbreak has caused economic downturns and recession. In 2021, Covid-19 cases in Indonesia has a significant increase. The construction sector in Indonesia faced substantial challenges due to the pandemic, evidenced by contracted growth. The impact of the Covid-19 pandemic on the construction industry cannot be viewed solely from an economic perspective but must consider various factors. Issues in the construction industry affect project performance. Previous research could not interpret the relationship between individual pandemic impacts and project performance levels. Therefore, this study aims to determine factors Covid-19 pandemic affects construction project performance in Indonesia. The study identifies five factors that may influence project performance: (1) challenges in implementing social distancing, (2) movement restrictions, (3) challenges of working from home (WFH), (4) planning for worker limitations, and (5) use of personal protective equipment (PPE). Data was collected using questionnaires distributed to project managers in the construction industry. Primary analysis was conducted using Partial Least Square (PLS). The results indicate that three variables significantly impact project performance in the construction industry. The level of movement restrictions during the pandemic (lockdown) and the planning for worker limitations negatively affect project performance, while movement restrictions positively affect the challenges of implementing social distancing.
Penerapan Lean Manufacturing Guna Mengurangi Waste dengan Metode Value Stream Mapping dan Waste Assessment Model Pada Home Industry Konveksi Warsito Rieska Ernawati; Nuzulia Khoiriyah; Nova Miranda; Nurul Istikomah; Bunga Zahrotun Na’imah; Fathur Eko Prasetyo Aditya
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 12 No 2 (2024)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v12i2.2410

Abstract

One of the home industry conventions warsito in the Pati area produces clothing products like pyjamas. This home industry is run by individuals or families on a small scale. Convex home industries often face the challenge of managing efficient production processes and meeting consumer expectations. Faced with such challenges, they often face problems of waste in the production process, such as excessive inventory, waiting times, unnecessary movements, and inefficient processes. Therefore, to eliminate such waste, the concept of lean manufacturing is needed. This research discusses waste reduction using the Value Stream Mapping (VSM) and Waste Assessment Model (WAM) methods. With this method, non-value added identification is produced through the process flow and the relationship of waste to each other. There are 2 largest wastes, namely waste defect and waste motion, which then require improvement proposals by analyzing the causes/root causes of the waste using a fishbone diagram. From this method, waste defect with a percentage of 20.452% and waste motion with a percentage of 16.16%. The improvement proposal for dealing with waste defects is to apply the 5s principle, group materials by type and color, schedule machine maintenance. At waste motion it is recommended to set the work position, use aids such as jig, quality control of materials, set a sewing machine calibration schedule.
Analisis Postur Kerja Pada Operator Quality Control Menggunakan Metode RULA (Studi Kasus Pada PT. XYZ Cikarang Barat Muhammad Hatta Mahmuda; Rana Ardila Rahma
Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi Vol 13 No 1 (2024)
Publisher : Program Studi Teknik Industri Universitas Setia Budi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31001/tekinfo.v13i1.2147

Abstract

Work in the current industrial era, both on a small to large scale, almost always carries a risk of danger. One of them is an occupational disease caused by errors in posture when doing work. Illnesses caused by work posture errors usually do not have an immediate effect after finishing the job, but sometimes the impact often appears after quite a long time. Body posture is a determinant in assessing effectiveness at work. If the employee's posture is ergonomic then the results of the work will be good and the health of the workers is guaranteed. However, if the employee's posture is not ergonomic, then the results of the work are not necessarily good and can cause complaints on the body. In this study aims to analyze the performance posture of an employee in the quality control division. The method used is to use the nordic body map questionnaire and RULA calculations. The results obtained from the nordic body map questionnaire are that it can be seen which part of the body experiences pain, namely the upper body posture. While the results obtained from the RULA calculations were on the work of wiping components and checking data on the computer, the grand score obtained was 4, which means that it needs further investigation and if necessary repairs are made. Meanwhile, for the work of polishing components and measuring components, a grand score of 7 was obtained, which means that it needs to be investigated and repaired right away.