cover
Contact Name
Cucuk Nur Rosyidi
Contact Email
performa@ft.uns.ac.id
Phone
+62271-632110
Journal Mail Official
performa@ft.uns.ac.id
Editorial Address
Gedung I, Lantai 1 Fakultas Teknik UNS Jl. Ir. Sutami 36A, Surakarta, 57126 , Indonesia
Location
Kota surakarta,
Jawa tengah
INDONESIA
PERFORMA : Media Ilmiah Teknik Industri
ISSN : 14128624     EISSN : 26206412     DOI : https://doi.org/10.20961/performa
Core Subject : Engineering,
PERFORMA : Media Ilmiah Teknik Industri merupakan jurnal teknik industri yang menyajikan artikel orisinil pada bidang teknik dan manajemen industri. Tema naskah yang diterbitkan mencakup: Manufacturing System, Operation Research, Product Design and Development, Manufacturing Technology, Work Study, Ergonomic, Logistic System, Business System, Quality and Reliability Engineering, Information System and Knowledge Management, System Modelling, Small-medium Enterprise Optimization, Public Sector Optimization, and Industrial Engineering Education . Naskah yang dimuat dapat berupa hasil penelitian, analisis, kajian ilmiah, opini, dan makalah teknik.
Articles 398 Documents
Developing E-Learning System to Support Teaching and Learning Activities Using DSDM Approach Ahmad Kevin Prawira; Tanika D Sofianti; Yuki Indrayadi
Performa: Media Ilmiah Teknik Industri Vol 14, No 1 (2015): PERFORMA Vol. 14 No 1, Maret 2015
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (326.928 KB) | DOI: 10.20961/performa.14.1.11012

Abstract

Nowadays academic institutions have to follow development of technology to give high accreditation in education. Development in Information technology is considered as one of the leading factor that affecting the changes in higher education academic institution, especially through E-Learning system. The main objective of this research is to design how to develop E-Learning system in teaching and learning process at Industrial Engineering Department of Swiss German University, by using Dynamic System Development Method (DSDM). The developed E-Learning that is being tested by developer and user to be analyzed and assessed is called Moodle. The result shows that the teaching and learning processes can be well improved by integrating the developed E-Learning system including its specific interfaces and platform. It also shows that the developed system is also well accepted by potential users, as indicated by the user acceptance test. The result of the research is analyzed by using the descriptive analysis to reveal the capability of the system. It shows that developed E-Learning system is capable to be implemented in Industrial Engineering Department, provided that the infrastructure is also prepared to support such system.
Prediksi Prestasi Mahasiswa dengan Jalur Siswa Berprestasi (PSB) Menggunakan Metode Naïve Bayers Harwati -; Hanna Miratama
Performa: Media Ilmiah Teknik Industri Vol 15, No 1 (2016): PERFORMA Vol. 15 No. 1, Maret 2016
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (602.506 KB) | DOI: 10.20961/performa.15.1.13752

Abstract

The purpose of this research is to predict the academic performance of students who submit university by special way (PSB) based on their GPA using naïve Bayes methods. The predicted results will be used to provide recommendations what attributes can be used as indicators of the selection through the PSB. From the calculation, it is resulted PSB students with satisfying GPA is they that have the attributes from Central Java, majoring in science, from public schools, parents' work of civil servants, have academic achievement during high school, and male. The level of accuracy for this calculation is equal to 51.69%.
Analisa Kelayakan Pabrik Neon Elektronik (NE) Sukoharjo Nina Lutfia; I Wayan Suletra; Fakhrina Fahma
Performa: Media Ilmiah Teknik Industri Vol 3, No 1 (2004): PERFORMA Vol. 3 No 1, Maret 2004
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20961/performa.3.1.11128

Abstract

The increasing of electricity base rates initiate people to choose the energy saving lamp in order to decrease their electricity bill. It impacts the demand of energy saving lamps increase. Neon Electronic produces such an energy saving lamp with the electronic circuit called ballast electronic. Neon Electronic plan to develop the factory and expand the marketing area.This research is aimed to know the feasibilities of the Neon Electronic (NE) development plan. The feasibilities study covered a research on market aspects, production and operastional aspects, and financial aspects.Based on the result of market aspects, this development plan is feasible; because of the people demand. so, there is an opprtunity to implement this plan. Despite from that there is a particular interest factors such as the quality of Neon Electronic is higher than the around competitors.From the production and operational aspects, this plan is also feasible to continue because there is no barrier on the availability of the machines and tools and another production fasilities, the development fund, and human resources.With the assumption that the interest rate is 16% and all the product sold, the result of investment criteria; NPV is Rp. 167.778.623, IRR = 98% which is bigger than the interest rate, Discounted Payback Period = 1 year 3,78 months, no cash deficit, the Profitability Index above one which is 2,86, and the Break Even Point (BEP) 2004 is Rp. 307.879.319. The financial aspects point of view recommends this development plan is possible to continue.
Perancangan Sistem Informasi Stok Darah Real time di Palang Merah Indonesia (PMI) Surakarta Roni Zakaria; Muhammad Hisjam; Wicaksono Febriantoro
Performa: Media Ilmiah Teknik Industri Vol 7, No 2 (2008): PERFORMA Vol. 7, No. 2 September 2008
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1839.762 KB) | DOI: 10.20961/performa.7.2.13786

Abstract

At this time in PMI Surakarta, information system that connects the Hospital as blood consumer and PMI as blood supplier has not optimum yet, consequently, sometimes PMI has problem to serve demand from consumer because the blood is out of stock. Furthermore, response time from PMI Surakarta in serving the people and the usefulness of active voluntary donor has not optimum yet, these problems also influence PMI service quality. On the other hand, demand for blood can not be cancelled and have emergency character. Based on those problems, it is needed to design real time blood stock information system in PMI Surakarta. The aims of information system design is to increase the easiness and the quality system that is exist now in order to integrate PMI, blood consumer society and donor community. Thus blood stock position and blood demand can be known and be monitored along the time with media that people easy to access such as website and value added short message service (VASMS). The new system has ability to trace volunteer donor data, mobile unit, health of donor data, blood stock data, test result of serology and crossmatch data, can make real time quantity and blood genre report, can search at donor database quickly and also can give real time blood stock information via website in www.uns.ac.id/pmi and via VASM 3011 (only for Indosat costumer).
Minimasi Slack Time pada Penjadwalan Make To Order Job Shop Ali Parkhan; Hermawan Adi Tanjung
Performa: Media Ilmiah Teknik Industri Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (530.174 KB) | DOI: 10.20961/performa.4.2.11180

Abstract

In manufacturing Make to Order environment, order usually can be negotiated in order to satisfycustomer need while it remains considering resources availability. Scheduling is utilized in a company to get higher efficiencies in production, minimize makespan and meet due date. There are some decisions related in scheduling activity i.e. sequencing, routing and determining starting time and finishing time of jobs. This paper will present application of Integer Linear Programming (ILP) and Critical Path Method (CPM) in scheduling. The methods are employed to determine due date that minimize slack time. This study resulted an optimal sequencing and routing of the jobs.
Pengaruh Intensitas Cahaya Lampu dan Intensitas Terang Layar Komputer Terhadap Produktivitas dalam Mengetik Retno Indriartiningtias; Nia Budi Puspitasari; Trifandi Lasalewo
Performa: Media Ilmiah Teknik Industri Vol 8, No 2 (2009): PERFORMA Vol. 8, No. 2 September 2009
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (186.243 KB) | DOI: 10.20961/performa.8.2.13820

Abstract

In this recent time, almost all of jobs sectors using technology and computer for they activities. By using computers, they reach value added as efficiency, more faster, and validity. Using computers for a long time and for continuity activities, need work environment that support their produvtivity and their safety. Work environment such as lighting, the screen colour, the smels of room, etc are the factors that can influence activities’s productivity and quality. For that purposes, this paper research about the influence of intensity of lamp lighting and computer’s screen lighting to typing productivity. The experiment does with factorial design becouse they use two factors (intensity of lamp lighting and computer’s screen lighting ). Every factors have 3 levels (kualitative and kuantitative). The respons that want to know the typing productivity (word in 10 second) for each responden. The replication for the experiment is 3 for each treatment.From the result, there are no significant influence between intensity of lamp lighting, computer’s screen lighting and typing productivity.
Pengukuran Fleksibilitas Dalam Industri Manufaktur Dengan Menggunakan Objective Matrix (OMAX) dan Entropy Wakhid Ahmad Jauhari
Performa: Media Ilmiah Teknik Industri Vol 5, No 1 (2006): PERFORMA Vol. 5, No. 1 Maret 2006
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (86.33 KB) | DOI: 10.20961/performa.5.1.11542

Abstract

As globalization of markets raises competitive pressures, one essential requirement for the survival of organizations is their capability to meet competition. Market needs cause unceasing changes in the life cycle, shape, quality and price of products. Manufacturing flexibility is an effective way to face up to the uncertainties of this rapidly changing environment and it is defined as the ability to absorb various disturbances which occur in production systems, as well as the ability to incorporate and exploit new technological advances and work practices. The aim ofthis paper is to measure capability and requirement offlexibility in manufacturing system. We propose Objective Matrix (OMAX) and Entropy integration method to measure flexibility.
Peningkatan Produktivitas Kerja Operator melalui Perbaikan Alat Material Handling dengan Pendekatan Ergonomi Taufiq Rochman; Rahmaniyah Dwi Astuti; Rahardian Patriansyah
Performa: Media Ilmiah Teknik Industri Vol 9, No 1 (2010): PERFORMA Vol. 9, No. 1 Maret 2010
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (429.655 KB) | DOI: 10.20961/performa.9.1.13874

Abstract

The method is being used in anthropometry approach. Anthropometry approach is needed to determine material handling appliance dimension. This research also assess productivity from material handling appliance, use result from material handling simulation model. Simulation model meant as information from material handling condition after conducted redesigning. The result of this research indicate that redesigning material handling appliance assist by using anthropometry approach can reduce processing time become 48,873.6 second. Besides that also make improvement a productivity index value, that is for the index of material productivity occured improvement equal to 22% and time productivity index occured improvement equal to 38%.
Pemilihan Pemasok Drum Pelumas Industri Menggunakan Fuzzy Analytical Hierarchy Process (Studi Kasus: PT. Pertamina Pusat dan Production Unit Gresik) D. A. Mardhikawarih; Wakhid Ahmad Jauhari; Cucuk Nur Rosyidi
Performa: Media Ilmiah Teknik Industri Vol 11, No 1 (2012): PERFORMA Vol. 11, No 1 Maret 2012
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (192.3 KB) | DOI: 10.20961/performa.11.1.12642

Abstract

PT Pertamina Lubricant unit has the largest lubricants production units that PUG (Production UnitGresik). As part of the manufacturing industry often experience problems on PUG electoral system and assessment of supplier. Inaccuracies in selecting supplier results the selected supplier failed to deliver an order continually. One of the solutions of this problem is to improve the supplier selection system. Therefore, this research aims to develop supplier selection model with involves the Pertamina Oil Centre and PUG. An earlier stage of the research is to determine the criteria and subcriteria of the supplier selection obtained through Questionnaires I. The second stage was composing the hierarchy of the problem that was found in the company. The third stage was composing Questionnaires II wich translating AHP scale into triangular fuzzy number. The fourth stage aggregated appraisement of the whole of the respondents. The fifth stage calculated the value of the degree of possibility. The final stage calculated the value of consistency ratio from the opinion of the decision makers. After criteria and sub criteria of the selection and assessment suppliers has been developed. Then it used to choice the supplier of industrial lubricant drum. This research resulted eight criteria selection and assessment of supplier quality criteria, price, delivery, service, innovation, safety and working environment, flexibility, organization with a total combined all the criteria as much as sub criteria 29 sub criteria. The highest weighting is quality’s criteria (1.00), while the highest one is claims replacement good’s subcriteria (1.00). The results from supplier assessment indicated that the supplier Y was the chosen supplier
Penentuan Faktor-Faktor Bahaya yang Dihadapi Perawat di RSUD Kabupaten Karanganyar dan Usulan Pencegahannya Menggunakan Metode AHP Irwan Iftadi; Wakhid Ahmad Jauhari; Agarika Fatmasari
Performa: Media Ilmiah Teknik Industri Vol 10, No 1 (2011): PERFORMA Vol. 10, No 1 Maret 2011
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (325.337 KB) | DOI: 10.20961/performa.10.1.13912

Abstract

From the calculation of weighting the results of biological hazard 0.23 0.22 followed by a chemical hazard and environmental and mechanical biomechanical hazard 0.22, 0.17 and hazard pshycal 0.17 pshychological hazard. While the determination of the value of performance, the lowest hazard of pshychological hazard to the value 3.991 4.113 followed by a biological hazard, chemical hazard 4.309, environmental and mechanical / biomechanical hazard and the highest 4.396 4.578 pshycal hazard. Proposed hazard prevention based on the lowest of pshychological hazard with hazard specification, among others, due to the many patients, patients who want immediate demands are met, the threat from the patient and the supervisor, invective from the patient and the supervisor, shift changing, the staff were not adequate and heavy workloads. From the results of questionnaires and interviews with the nurse, the things that need to be considered is the quantity of hospital nurses, nurses and quality of work on the hospital system.

Page 8 of 40 | Total Record : 398


Filter by Year

2002 2025


Filter By Issues
All Issue Vol 24, No 1 (2025): Performa: Media Ilmiah Teknik Industri Vol 23, No 2 (2024): Performa: Media Ilmiah Teknik Industri Vol 23, No 1 (2024): Performa: Media Ilmiah Teknik Industri Vol 22, No 2 (2023): Performa: Media Ilmiah Teknik Industri Vol 22, No 1 (2023): Performa: Media Ilmiah Teknik Industri Vol 21, No 2 (2022): Performa: Media Ilmiah Teknik Industri Vol 21, No 1 (2022): Performa: Media Ilmiah Teknik Industri Vol 20, No 2 (2021): Performa: Media Ilmiah Teknik Industri Vol 20, No 1 (2021): Performa: Media Ilmiah Teknik Industri Vol 19, No 2 (2020): Performa: Media Ilmiah Teknik Industri Vol 19, No 1 (2020): Performa: Media Ilmiah Teknik Industri Vol 18, No 2 (2019): Performa: Media Ilmiah Teknik Industri Vol 18, No 1 (2019): Performa: Media Ilmiah Teknik Industri Vol 17, No 2 (2018): PERFORMA Vol. 17, No 2 September 2018 Vol 17, No 1 (2018): PERFORMA Vol. 17, No 1 Maret 2018 Vol 16, No 2 (2017): PERFORMA Vol. 16, No 2 September 2017 Vol 16, No 1 (2017): PERFORMA Vol. 16, No 1 Maret 2017 Vol 15, No 2 (2016): PERFORMA Vol. 15 No. 2, September 2016 Vol 15, No 1 (2016): PERFORMA Vol. 15 No. 1, Maret 2016 Vol 14, No 2 (2015): PERFORMA Vol. 14 No. 2, September 2015 Vol 14, No 1 (2015): PERFORMA Vol. 14 No 1, Maret 2015 Vol 13, No 2 (2014): PERFORMA Vol. 13 No. 2, September 2014 Vol 13, No 1 (2014): PERFORMA Vol. 13, No 1 Maret 2014 Vol 12, No 2 (2013): PERFORMA Vol. 12, No 2 September 2013 Vol 12, No 1 (2013): PERFORMA Vol. 12, No 1 Maret 2013 Vol 11, No 2 (2012): PERFORMA Vol. 11, No 2 September 2012 Vol 11, No 1 (2012): PERFORMA Vol. 11, No 1 Maret 2012 Vol 10, No 2 (2011): PERFORMA Vol. 10 No 2, September 2011 Vol 10, No 1 (2011): PERFORMA Vol. 10, No 1 Maret 2011 Vol 9, No 2 (2010): PERFORMA Vol. 9, No 2 September 2010 Vol 9, No 1 (2010): PERFORMA Vol. 9, No. 1 Maret 2010 Vol 8, No 2 (2009): PERFORMA Vol. 8, No. 2 September 2009 Vol 8, No 1 (2009): PERFORMA Vol. 8, No. 1 Maret 2009 Vol 7, No 2 (2008): PERFORMA Vol. 7, No. 2 September 2008 Vol 7, No 1 (2008): PERFORMA Vol. 7, No. 1 Maret 2008 Vol 6, No 2 (2007): PERFORMA Vol. 6, No. 2 September 2007 Vol 6, No 1 (2007): PERFORMA Vol. 6, No. 1 Maret 2007 Vol 5, No 2 (2006): PERFORMA Vol. 5 No 2, September 2006 Vol 5, No 1 (2006): PERFORMA Vol. 5, No. 1 Maret 2006 Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005 Vol 4, No 1 (2005): PERFORMA Vol. 4 No 1, Maret 2005 Vol 3, No 2 (2004): PERFORMA Vol. 3 No 2, September 2004 Vol 3, No 1 (2004): PERFORMA Vol. 3 No 1, Maret 2004 Vol 2, No 2 (2003): PERFORMA Vol. 2, No. 2 September 2003 Vol 2, No 1 (2003): PERFORMA Vol. 2, No. 1 Maret 2003 Vol 1, No 1 (2002): PERFORMA Vol. 01, No 1 Maret 2002 More Issue