cover
Contact Name
Al Mahdali
Contact Email
almahdali@atim.ac.id
Phone
+6281340032063
Journal Mail Official
redaksijjeee@ung.ac.id
Editorial Address
Electrical Engineering Department Faculty of Engineering State University of Gorontalo Jenderal Sudirman Street No.6, Gorontalo City, Gorontalo Province, Indonesia
Location
Kota gorontalo,
Gorontalo
INDONESIA
Jambura Journal of Electrical and Electronics Engineering
ISSN : 26547813     EISSN : 27150887     DOI : 10.37905/jjeee
Jambura Journal of Electrical and Electronics Engineering (JJEEE) is a peer-reviewed journal published by Electrical Engineering Department Faculty of Engineering, State University of Gorontalo. JJEEE provides open access to the principle that research published in this journal is freely available to the public to support the exchange of knowledge globally. JJEEE published two issue articles per year namely January and July. JJEEE provides a place for academics, researchers, and practitioners to publish scientific articles. Each text sent to the JJEEE editor is reviewed by peer review. Starting from Vol. 1 No. 1 (January 2019), all manuscripts sent to the JJEEE editor are accepted in Bahasa Indonesia or English. The scope of the articles listed in this journal relates to various topics, including: Control System, Optimization, Information System, Decision Support System, Computer Science, Artificial Intelligence, Power System, High Voltage, Informatics Engineering, Electronics, Renewable Energy. This journal is available in online and highly respects the ethics of publication and avoids all types of plagiarism.
Articles 135 Documents
Dampak Gangguan Beban Lebih Terhadap Overload Shedding Gardu Induk 150kV Sukolilo Surabaya Firhan Akbar; Tri Wrahatnolo
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.20137

Abstract

Gangguan beban lebih dapat terjadi pada jaringan distribusi yang berdampak pada pemadaman listrik konsumen. Tujuan studi ini adalah untuk menganalisis akibat pengaruh gangguan beban lebih terhadap overload shedding pada sebuah gardu induk. Pembebanan transformator gardu induk 150kV Sukolilo telah melebihi 50%, maka dari itu ketika  salah satu transformator terjadi gangguan maka akan membuat pembebanan transformator yang lain meningkat. Penelitian dampak gangguan beban lebih terhadap Overload Shedding pada gardu induk 150kV Sukolilo ini menggunakan metode aliran daya dan kontingensi menggunakan ETAP 19.0. Terdapat 3 kondisi  simulasi kontingensi yang dilakukan, yaitu 1 kondisi penghantar mengalami trip dan 2 kondisi transformator mengalami trip. Simulasi gangguan beban lebih yang terjadi pada kontingensi ke 1 hingga 3 mengakibatkan dampak pada sistem yang menyebabkan overload shedding harus bekerja. Pada kontingensi 1 dan 3 menyebabkan overload shedding tahap 1 bekerja sehingga memadamkan beban sebesar 18,7 MW, namun pada kontingensi ke 2 menyebakan hingga overload shedding tahap 2 memadamkan total beban sebesar 54,5 MW. Tahapan pelepasan beban pada gardu induk 150kV Sukolilo  telah sesuai standar IEEE Std C37 106-2003  yaitu maksimal pelepasan beban pada tahap pertama yakni 10% setara 38,56 MW  dan tahap kedua 15% setara 57 MW. Hasil simulasi overload shedding ini dapat mengurangi resiko pemadaman yang bekelanjutan.Overload fault can occur in the distribution network, resulting in consumer power outages. The purpose of this study is to analyse the effect of a fault on the overload of a substation circuit. Transformer loading of 150kV Sukolilo substation has exceeded 50%, thus if a fault occurs in one of the transformers it will make the loading of other transformers increase. This research on the impact of overload faults on Overload Shedding at the 150kV Sukolilo substation uses the power flow and contingency method using ETAP 19.0. There are 3 contingency simulation conditions carried out, namely 1 condition of the conductor experiencing a trip and 2 conditions of the transformer experiencing a trip. Simulation of overload faults that occur in contingencies 1 to 3 results in an impact on the system that causes overload shedding to work. In contingency 1 and 3 caused overload shedding stage 1 to work so that it extinguished a load of 18.7 MW, but in contingency 2 caused overload shedding stage 2 to extinguish a total load of 54.5 MW. The stages of load shedding at the 150kV Sukolilo substation are in accordance with IEEE Std C37 106-2003 standards, namely the maximum load shedding in the first stage is 10% equivalent to 38.56 MW and the second stage is 15% equivalent to 57 MW. The results of this overload shedding simulation can reduce the risk of continuous blackouts.
Rancang Bangun Pengontrolan Alat Elektronik Berbasis Internet of Things Dedi Suarna; Zahir Zainuddin; Hazriani -
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.19181

Abstract

Di zaman saat ini semua aktifitas yang dikerjakan manusia tidak perna lepas dari asupan tenaga listrik yang terus mejadikan hal tersebut ketergantungan dan menggeser sumber-sumber  kebutuhan tenaga lain utama dalam membantu manusia dalam melakukan aktifitasnya. Namun penggunaan listrik yang tidak terkontrol dapat mengakibatkan pemborosan listrik. Salah satu Organisasi Perangkat Daerah yang memiliki kosumsi listrik yang besar yakni Biro Umum Sekretariat Daerah Provinsi Sulawesi Barat dapat dilihat dari jumlah tagihan listrik yang di bayar setiap bulannya. Penelitian ini bertujuan untuk memonitoring dan mengontrol komsumsi listrik untuk meminimalisir penggunaan energi listrik yang berlebih dengan memanfaatkan mikrokontroller dan sensor. Penelitian in dilakukan dengan tahapan pengujian pada tiga ruangan kerja yakni ruangan kepegawaian, ruangan persuratan dan ruangan Urdal. Peralatan elektronik yang dimonitoring dan dikontrol seperti lampu yang dihubungkan pada arus listrik (stopkontak) pada alat yang dirancang. Hasilnya adalah sudut jangkauan sesor gerak pir sebesar 110 derajat dan 7 meter maksimal jarak jangkauan membutuhkan minimal 2 sensor untuk masing-masing ruangan dan penghematan konsumsi energi peralatan listrik di tiga ruangan sebesar 49% Kesimpulan dalam Penelitian ini adalah sistem yang dirancang memberikan dampak yang baik dalam pengehematan konsumsi peralatan alat elektronik.In this day and age, all activities carried out by humans are inseparable from the intake of electric power which continues to make it dependent and shift other sources of energy needs in helping humans carry out their activities. However, the use of unburned electricity can result in wastage of electricity. One of the Regional Apparatus Organizations that has a large electricity consumption, namely the General Bureau of the Regional Secretariat of West Sulawesi Province, can be seen from the number of electricity bills paid each month. This study aims to monitor and control electricity consumption to minimize excessive use of electrical energy by utilizing microcontrollers and sensors. The research was carried out by testing stages in three work rooms, namely the personnel room, the mail room and the Urdal room. Electronic equipment that is monitored and controlled such as lights that are connected to an electric current (socket) on the designed device. The result is a pear motion sensor with a range of 110 degrees and a maximum range of 7 meters requiring a minimum of 2 sensors for each room and saving the energy consumption of electrical equipment in three rooms by 49%. saving consumption of electronic equipment.
Analisis Pentanahan Gardu Induk Akibat Surja Petir Menggunakan Finite Elemen Method Ayu Fitriani; Syafriwel Syafriwel; Jhoni Hidayat; Joel Panjaitan; Syofyan Anwar Syahputra
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.20732

Abstract

Sambaran petir pada sistem tenaga bisa mengganggu keandalan sistem, serta senantiasa jadi salah satu tantangan utama dalam proses desain gardu induk. Hal- hal yang butuh dicermati dalam mendesain sistem pentanahan diantaranya, peningkatan tegangan tanah (Grond Potensial Rise), keamanan tegangan langkah serta tegangan sentuh pada gardu induk, dan besarnya nilai impedansi akibat dari surja petir. Tujuan dari penelitian ini untuk melihat besar arus sambaran petir yang terjadi pada gardu induk dengan variasi area zona pentanahan grid pada gardu induk. Adapun simulasinya menggunakan aplikasi ETAP memakai metode FEM (Finite Element Method) dibuat untuk menampilkan ikatan antara luas zona grid, dimensi konduktor serta peningkatan GPR akibat sambaran surja petir. Nilai kenaikan tegangan yaitu sebesar 13289V,  tegangan sentuh yang didapat sebesar 490,1V pada bobot badan 50kg dan 663,4V  bobot badan 70kg, sedangakan untuk tegangan langkah yaitu sebesar 1372,5V pada bobot badan 50kg dan 1857,6V bobot badan 70kg pada luas zona grid 10 x 10 m2. tegangan sentuh yang didapat sebesar 832,87V pada bobot badan 50kg dan 1127,2V bobot badan 70kg. sedangakan untuk tegangan langkah yaitu sebesar 2743,2V pada bobot badan 50kg dan 3712,8V bobot badan 70kg pada luas zona grid 50 x 50 m2. Hasil akumulasi arus gangguan akibat sirja petir dengan variasi arus injeksi dimana semakin besar arus injeksi yang diberikan maka semakin besar arus gangguan surja petir yang timbul.Lightning strikes in power systems can compromise system reliability and have always been one of the major challenges in the substation design process. Things that need to be considered in designing a grounding system include ground voltage increase (Ground Potential Rise), step voltage safety and touch voltage at the substation, and the magnitude of the impedance value due to lightning surges. The purpose of this study is to see the magnitude of the lightning strike current that occurs at the substation with variations in the area of the grid grounding zone at the substation. The simulation using the ETAP application using the FEM (Finite Element Method) method is made to display the bond between the grid zone area, conductor dimensions, and the increase in GPR due to lightning strikes. The voltage increase value is 13289V, the touch voltage obtained is 490.1V at 50kg body weight and 663.4V 70kg body weight, while the step voltage is 1372.5V at 50kg body weight and 1857.6V 70kg body weight at zone area grids 10 x 10 m2. The touch voltage obtained is 832.87V for a body weight of 50kg and 1127.2V for a body weight of 70kg. while the step voltage is 2743.2V for a body weight of 50kg and 3712.8V for a body weight of 70kg for a grid zone area of 50 x 50 m2. The accumulated fault current results from lightning surges with injection current variations where the greater the injection current, the greater the lightning surge fault current that arises.
Sistem Positioning Robot Four-Omnidirectional Wheels Menggunakan MPU6050 dan Encoder Berbasis PD-Fuzzy Controller Nur Holis; Muhammad Syariffuddien Zuhrie; Endryansyah Endryansyah; Nurhayati Nurhayati
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.20138

Abstract

Robot beroda four-omnidirectional wheels merupakan robot autonomous yang dapat bergerak ke arah mana saja tanpa mengubah arah hadap robot tersebut. Sehingga tantangan utama dari robot ini yaitu sistem positioning yang hingga saat ini belum terdapat solusi absolut untuk mengatas permasalahan tersebut. Oleh karena itu dibutuhkan sebuah sistem kendali yang bisa memperbaiki dan mengurangi terjadinya eror positioning robot. Pada penelitian ini menggunakan kombinasi dua controller yaitu PD Controller dan fuzzy logic controller dengan algoritma switching controller yang diolah pada software STM32CubeIDE. Selain itu, pergerakan robot beroda four-omnidirectional wheels menggunakan inverse kinematika sehingga robot dapat menuju titik koordinat yang ditentukan dengan baik dan cepat. Sistem positioning pada penelitian ini menggunakan sensor MPU6050 sebagai pembaca orientasi hadap robot, dan sensor rotary encoder sebagai pembaca posisi robot di lapangan. Pengujian sistem positioning ini dilakukan dengan membandingkan antara positioning tanpa controller, Positioning Fuzzy Logic Controller, Positioning PD Controller dan Positioning dengan PD-Fuzzy controller pada pergerakan home to point, point to point, dan point to home. Diperoleh sistem Positioning dengan PD-Fuzzy controller menjadi yang terbaik dengan rata-rata eror 2,33 cm terhadap sumbu x dan 1,33 cm terhadap sumbu y, serta membutuhkan waktu 3,25 detik untuk mencapai setpoint.-- A four-omnidirectional wheels robot is an autonomous robot that can move in any direction without changing the direction it is facing. So that the main challenge of this robot is the positioning system which until now there is no absolute solution to overcome this problem. Therefore we need a control system that can improve responses and reduce the occurrence of robot positioning errors. In this research, a combination of two controllers was used, namely the PD controller and the fuzzy logic controller with a switching controller algorithm that was processed in the STM32CubeIDE software. In addition, the movement of the four-omnidirectional wheels robot uses inverse kinematics so that the robot can go to the coordinates that are determined properly and quickly. The positioning system in this study uses the MPU6050 sensor as a reader for the orientation of the robot, and a rotary encoder sensor as a reader for the position of the robot in the field. Testing of the positioning system is carried out by comparing positioning without a controller, Positioning Fuzzy Logic Controller, Positioning PD Controller and Positioning with PD-Fuzzy controller on home to point, point to point and point to home movements. The Positioning system with PD-Fuzzy controller is the best with an average error of 2.33 cm on the x-axis and 1.33 cm on the y-axis, and takes 3.09 seconds to reach the setpoint.
Analisis Data Eksploratif Capaian Indikator Kinerja Utama 3 Fakultas Teknik Ikhsan Hidayat; Ade Irawaty Tolago; Rahmat Deddy Rianto Dako; Jumiati Ilham
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.18397

Abstract

Data mentah yang belum di olah akan memperlambat proses penyampaian data, dengan menggunakan eksplorasi data analisis data yang akan di sampaikan akan lebih jelas dan dapat dipahami dengan mudah oleh pembaca. Data yang digunakan adalah data capaian Indikator Kinerja Utama (IKU) 3 Fakultas Teknik UNG Tahun 2021. IKU 3 terkait data dosen berkegiatan di luar kampus. Data IKU 3 FT UNG diperoleh dari capaian IKU 3 UNG yang telah diverifikasi Kementerian Pendidikan, Kebudayaan, Riset, dan Teknologi Tahun 2021. Data tersebut kemudian dilakukan Exploratory Data Analysis (EDA), sehingga didapatkan insight (wawasan) terhadap data tersebut. Proses yang terjadi adalah proses pengenalan masalah, pengumpulan data, pembersihan data dan kemudian analisis data eksplorasi. dari data yang didapatkan setelah melakukan EDA adalah untuk meningkatkan capaian IKU 3 Fakultas teknik UNG adalah dengan melakukan pengembangan terhadap dosen baru dan juga dosen yang belum pernah melakukan kegiatan di luar kampus. Dari data itu didapatkan pula data prodi yang paling banyak menyumbang dosen berkontribusi yaitu sebanyak 83%, dan juga prodi yang menyumbang paling rendah sekitar 18%. Dengan didapatkannya hasil ini, penentu kebijakan dapat mengambil keputusan untuk melakukan hal-hal yang dapat meningkatkan capaian IKU 3 Fakultas Teknik UNG.  Raw data that has not been processed will slow down the process of conveying data, by using data exploration data analysis that will be conveyed will be clearer and can be easily understood by readers. The data used is the Main Performance Indicator (IKU) 3 achievement data for the Faculty of Engineering UNG in 2021. IKU 3 is related to lecturer data on activities outside the campus. The IKU 3 FT UNG data was obtained from the achievements of the IKU 3 UNG which have been verified by the Ministry of Education, Culture, Research and Technology in 2021. The data was then carried out by Exploratory Data Analysis (EDA), so that insight was obtained from the data. The process that occurs is the process of problem identification, data collection, data cleaning and then exploratory data analysis. from the data obtained after carrying out the EDA is to improve the achievement of IKU 3 UNG Faculty of engineering is to develop new lecturers and also lecturers who have never carried out activities outside the campus. From the data, it was also obtained that the study programs that contributed the most were lecturers, namely 83%, and also the study programs that contributed the lowest, around 18%. By obtaining these results, policy makers can make decisions to do things that can improve IKU 3 achievements at the UNG Faculty of Engineering.
Rancang Bangun Kontrol Pengolahan Gula Aren Dengan Programmable Logic Controller Sukandar Kandar Sawidin; Yoice R. Putung; Anthoinete P.Y. Waroh; Tracy Marsela
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.19839

Abstract

Gula aren diperoleh dari nira hasil sadapan pohon aren  dan  merupakan  salah  satu bahan baku dari pembuatan makanan maupun minuman.  Pembuatan  gula aren  yang  ada   di  Desa Tanggari Minahasa Utara Sulawesi  Utara  menggunakan bahan bakuair nira (saguer), akan tetapi pada  proses  pembuatan  gula  aren masih tradisional dengan menggunakan sepenuhnya tenaga manusia. Penelitian ini bertujuan untuk membuat  prototype  alat pengolah   gula   aren dengan menggunakan kontrol  Programable  Logic  Controler  (PLC) dan monitoring  Human   Machine   Interface   (HMI), dilengkapi   dengan   sensor  thermostat   sebagai alat pengukur temperatur  pada  saat  proses  pemasakan   air   nira dengan   gas   LPG   dan motor   wiper sebagai penggerak alat pengaduk. Hasil pengujian yang dilakukan untuk air nira 3 liter dengan suhu ± 100 0C diperoleh gula aren 750 gram. Dengan menggunakan kontrol PLC dan monitoring HMI pada alat pengolah gula aren ini diharapkan dapat meringankan tenaga pekerja   dan   mempercepat   proses   pengadukan   gula  aren sampai mengental sehingga   pada   akhirnya dapat meningkatkan efisiensi produksi.Palm sugar is obtained from the sap of palm tree tapping and is one of the raw materials for making food and drinks. The manufacture of palm sugar in the village of TanggariMinahasa Utara, North Sulawesi, uses sap (saguer) as the raw material, but the process of making palm sugar is still traditional, using full human power. This study aims to make a prototype of a palm sugar processing tool using Programable Logic Controler (PLC) control and Human Machine Interface (HMI) monitoring, equipped with a thermostat sensor as a temperature measuring device during the process of cooking sap water with LPG gas and a wiper motor as a driving force. mixer.From the results of tests carried out for 3 liters of sap water with a temperature of ± 100 0C, 750 grams of palm sugar was obtained.Using PLC control and HMI monitoring on the palm sugar processing equipment is expected to relieve labor and speed up the process of stirring the palm sugar until it thickens so that in the end it can increase production efficiency.
Peningkatan Performa Sel Surya Dengan Sistem Peredam Panas soni prayogi; Fitria Silviana; Zainuddin Zainuddin
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.18802

Abstract

Dalam studi ini, kami menyaajikan investigasi eksperimental terhadap kinerja sel surya yang digabungkan dengan peredam panas. Pengaturan eksperimental dalam ruangan dirancang dan dirakit untuk menyelidiki dampak penggunaan sistem pendingin peredam panas pada kinerja sel surya. Lampu halogen digunakan untuk mensimulasikan radiasi matahari dan penelitian dilakukan pada nilai radiasi matahari yang berbeda. Selain itu, penelitian dilakukan pada udara alami dan paksa untuk mendinginkan peredam panas. Hasil penelitian menunjukkan bahwa penggunaan sistem pendingin peredam panas meningkatkan kinerja sel surya. Suhu sel surya menurun sekitar 5,4 % dan 11 % masing-masing dengan menggunakan sistem pendingin peredam panas pada udara alami dan udara paksa di atas peredam panas. Selain itu, efisiensi dan daya sistem sel surya meningkat sekitar 16% saat sistem pendingin peredam panas digunakan.In this study, we conducted an experimental investigation of the performance of a solar cell coupled with a heat sink in a relatively simple system. An indoor experimental setup was designed and assembled to investigate the impact of using a heat sink cooling system on the performance of solar cell performance. Halogen lamps are used to simulate solar radiation and research is carried out on the value of solar radiation which varies from the highest wavelength to the lowest wavelength. In addition, research was carried out on natural and forced air to cool the heat sink. The results showed that the use of a heat dissipation cooling system increases the performance of solar cells. The temperature of the solar cell was decreased by about 5.4 % and 11 % respectively by using natural air and forced air to overheat sink cooling systems. We believe the efficiency and power of the solar cell system increase by about 16% when a heat dissipation cooling system is used. 
Penerapan XGBoost untuk Seleksi Atribut pada K-Means dalam Clustering Penerima KIP Kuliah Amiruddin Bengnga; Rezqiwati Ishak
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.20253

Abstract

Pada proses clustering prioritas penerima bantuan Kartu Indonesia Pintar Kuliah dengan algoritma K-Means ada beberapa masalah yang muncul yaitu masalah seleksi atribut yang penting dan penentuan nilai K yang optimum sehingga membuat proses clustering tidak maksimal dan tidak ideal. Masalah pemilihan atribut yang penting akan diselesaikan dengan menggunakan algoritma XGBoost yang terbukti dapat digunakan untuk memecahkan masalah seperti pada proses clustering prioritas penerima bantuan KIP Kuliah. Hasil penelitian menunjukkan bahwa algoritma XGBoost dapat menentukan 3 (tiga) atribut yang paling penting yaitu Pekerjaan Ayah, Penghasilan Ibu dan Luas Bangunan dari 12 (dua belas) atribut yang ada yaitu Pekerjaan Ayah, Pekerjaan Ibu, Penghasilan Ayah, Penghasilan Ibu, Jumlah Tanggungan, Kepemilikan Rumah, Sumber Listrik, Luas Tanah, Luas Bangunan, Sumber Air, MCK, Prestasi dan metode Elbow terbukti dapat menentukan nilai K yang optimum yaitu nilai K=4. Berdasarkan penggunaan 3 (tiga) atribut terbaik dan nilai K=4 sebagai nilai K optimum berhasil didapatkan clustering yang paling maksimal dan ideal dengan nilai index terkecil yaitu 0.819 dengan menggunakan metode pengujian Davies-Bouldin Index.In the process of clustering the priority of the recipient Indonesian smart school cards with the K-Means algorithm, there are several problems that arise, namely the problem of selecting important attributes and determining the optimal value of K, so that the process is not maximum and is not ideal. Important attribute selection problems will be solved using proven XGBoost algorithm that can be used to solve problems such as in the process of clustering the priority of recipients of school KIP assistance. The results of the research showed that the XGBoost algorithm can determine the 3 (three) most important attributes, namely Father’s Work, Mother’s Production and Building Size from the 12 (twelve) attributs that exist: Father's Job, Mothers’ Work, Fathers’ Income, Mothers’ Revenue, Number of Dependants, Home Ownership, Electrical Resources, Land Area, Building Area, Water Resource, MCK, Performance and Elbow Method proved to determine the optimal K value of K=4. Based on the use of the 3 (three) best attributes and the value of K = 4 as the optimal K value, the maximum and ideal clustering with the smallest index value is 0.819 using the Davies-Bouldin Index test method.
Evaluasi Ketidakseimbangan Beban pada GTT 20kV terhadap Arus Netral dan Rugi Daya Gesit Satriyo Wicaksono; Tri Wrahatnolo
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.20139

Abstract

Batas ketidakseimbangan pembebanan pada Sistem Distribusi Tenaga Listrik ditetapkan yakni antara 5 – 20 % terhadap beban per fasa. Hal ini terjadi akibat pertumbuhan beban yang tidak merata sehingga menyebabkan ketimpangan antara masing – masing fasa. Persentase ketidakseimbangan beban ini berpengaruh terhadap besarnya nilai arus yang mengalir pada penghantar netral. Sehingga netral tersebut dapat menyebabkan rugi  - rugi daya pada transformator distribusi. Penelitian ini yang dilakukan pada penyulang plumbungan diantaranya transformator distribusi RB877 memiliki persentase 64,1% dan RB876 memiliki persentase 21% terhadap ketidakseimbangan beban. Sehingga persentase tersebut diluar batas yang telah ditetapkan oleh standar. Dalam hal ini, penelitian dilakukan dalam rangka meperbaiki rugi – rugi daya yang timbul pada transformator distribusi RB877 sebesar 0,214 kW dan RB876 sebesar 0,025 kW dengan melakukan penyeimbangan beban terhadap masing – masing fasa. Simulasi Aliran Daya Tak Seimbang pada ETAP 19.0 digunakan dalam menyelesaikan masalah dalam penelitian ini. Berdasarkan hasil simulasi, persentase ketidakseimbangan beban transfomator distribusi RB877 menjadi 1,16% dan RB 876 menjadi 4,2%. Penyeimbangan yang dilakukan dengan membagi ketimpangan yang terjadi pada fasa yang memiliki kapasitas lebih besar ke yang lebih kecil mengakibatkan penurunan pada arus netral yang semula pada transformator distribusi RB877 sebesar 25,05 A menjadi 1,8 A dan pada RB876 yang semula 8,77 A menjadi 0,8 A. Dengan begitu, rugi daya yang timbul pada akan menurun yaitu transformator distribusi RB877 sebesar 0,00021 kW dan RB876 sebesar 0,0011 kW.The limit of load imbalance in the Electric Power Distribution System is set between 5%-20% of the load per phase. This occurs due to uneven load growth that causes inequality between each phase. The percentage of load imbalance affects the value of the current flowing in the neutral conductor. So that the neutral  will cause power loss in the distribution transformer. This research was conducted on the plumbungan extension, including the RB877 distribution transformer which has a percentage of 64.1% and RB876 has a percentage of 21% of the load imbalance. So that the percentage is outside the limit set by the standard. In this case, research was conducted in order to improve the power losses arising in the RB877 distribution transformer of 0.214 kW and RB876 of 0.025 kW by balancing theload on each phase. Unbalanced Load Flow Simulation in ETAP 19.0 is used in solving the problems in this study. Based on the simulation results, the percentage of load imbalance of distribution transfomator RB877 becomes 1.16% and RB 876 becomes 4.2%. Balancing carried out by dividing the imbalance that occurs in the phase that has a larger capacity to the smaller one results in a decrease in the neutral current which was originally in the RB877 distribution transformer of 25.05 A to 1.8 A and in RB876 which was originally 8.77 A to 0.8 A. Thus, the power losses arising will decrease, namely the RB877 distribution transformer of 0.00021 kW and RB876 of 0.0011 kW.
Redesign Website Sistem Informasi Teknik Elektro UNG Melalui Pendekatan Human Centered Design Syahrul Aji Prayoga; Rahmat Deddy Rianto Dako; Wrastawa Ridwan
Jambura Journal of Electrical and Electronics Engineering Vol 5, No 2 (2023): Juli - Desember 2023
Publisher : Electrical Engineering Department Faculty of Engineering State University of Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/jjeee.v5i2.20286

Abstract

Skor pengujian usabilitas pada website Sistem Informasi Teknik Elektro Universitas Negeri Gorontalo yang diuji dengan metode System Usability Scale (SUS) hanya berada pada skor 57,5. Pada kategori Acceptability Range berada pada tingkat marginal, sedangkan pada kategori Adjective Ratings berada pada tingkat OK, dan kategori Grade Scale pada skala D. Berdasarkan rendahnya skor usabilitas tersebut, maka dilakukan redesign menggunakan pendekatan Human Centered Design (HCD). Tujuan dilakukannya redesign ini adalah untuk meningkatan skor usabilitas pada website tersebut. Setelah dilakukan redesign menggunakan pendekatan Human Centered Design (HCD) dan pengujian menggunakan metode System Usability Scale (SUS) diperoleh skor usabilitas pada skor 73,5. Skor tersebut sudah masuk dalam tingkat Acceptable pada kategori Acceptability Range, pada kategori Adjective Ratings berada pada tingkat Good dan Grade Scale pada tingkatan B. Terlihat bahwa setelah dilakukan redesign terjadi peningkatan skor usabilitas, sehingga website Sistem Informasi Teknik Elektro Universitas Negeri Gorontalo dapat diklasifikasikan sebagai “above average” sesuai dengan minimal skor menurut Jeff Sauro.  The usability test score on the website of the Electrical Engineering Information System of Universitas Negeri Gorontalo, which was tested using the System Usability Scale (SUS) method, was only at a score of 57,5. The Acceptability Range category is at the marginal level, while the Adjecive Rating category is at the OK level, and the Grade Scale category is on a D scale. based on the low usability score, a redesign was carried out using the Human Centered Design (HCD) approach. This redesign aims to increase the usability score on the website. After redesigning using the Human Centered Design (HCD) approach and testing using the System Usability Scale (SUS) method obtained a usability score of 73,5. This score is included in the Acceptable level in the Acceptability Range category. The Adjective Ratings category is at the Good level, and the Grade Scale is at level B. Therefore, it is confirmed that after the redesign, there is an increase in the usability score, so the website of the Electrical Engineering Information System of Universitas Negeri Gorontalo can be classified as “above average” based on the minimum score according to Jeff Sauro.

Page 11 of 14 | Total Record : 135