cover
Contact Name
Wong Foek Tjong
Contact Email
duts_editor@petra.ac.id
Phone
-
Journal Mail Official
duts_editor@petra.ac.id
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Dimensi Utama Teknik Sipil
ISSN : -     EISSN : 26563312     DOI : https://doi.org/10.9744/duts
Core Subject : Engineering,
Jurnal Dimensi Utama Teknik Sipil (DUTS) promotes the widest possible dissemination of civil engineering knowledge by encouraging researchers to conduct research, build new or extend existing theoretical foundations, and contribute to practice at the corporate and national level. We aim to improve the dissemination quality in civil engineering field. The DUTS Journal welcomes technical/review/research papers, which publishes articles under the following fields: Construction Project Management, Construction Materials, Structural Engineering, and Geotechnical Engineering
Articles 171 Documents
OPTIMASI TOPOLOGI DAN UKURAN PENAMPANG STRUKTUR RANGKA BATANG BAJA DENGAN METODE METAHEURISTIK Ricky Agusta Hartono; Doddy Prayogo; Wong Foek Tjong
Dimensi Utama Teknik Sipil Vol 6 No 1 (2019): April 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1254.012 KB) | DOI: 10.9744/duts.6.1.33-42

Abstract

Optimasi topologi dari struktur rangka batang baja memberikan hasil yang lebih optimal dibandingkan optimasi ukuran penampang karena batang dan nodes yang tidak berguna pada struktur dapat dihilangkan. Fungsi objektif dari algoritma metaheuristik adalah untuk meminimalkan massa struktur rangka batang baja terhadap constraints statis dan dinamis berdasarkan studi kasus dan spesifikasi bangunan baja struktural Indonesia, SNI 1729:2015. Empat algoritma yang digunakan pada studi ini adalah: Particle Swarm Optimization, Differential Evolution, Teaching-Learning-Based Optimization, dan Symbiotic Organisms Search. Keempat algoritma tersebut diuji pada studi kasus 24-bar truss. Performa dari algoritma diukur dari lima kriteria massa, yaitu: massa terbaik, terburuk, rata-rata, standar deviasi, dan median dari struktur rangka batang baja. Hasil penelitian menunjukkan SOS menunjukkan performa terbaik pada studi kasus 24-bar truss.
STUDI KOMPARASI LIFE CYCLE COST PADA GEDUNG APARTEMEN Alexander Iskandar; Ratna Alifen; Januar Budiman
Dimensi Utama Teknik Sipil Vol 3 No 1 (2016): April 2016
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (747.863 KB) | DOI: 10.9744/duts.3.1.31-38

Abstract

Dalam mendesain suatu gedung apartemen yang ekonomis dan efisien, analisis life cycle cost dibutuhkan untuk mendapatkan desain yang paling efisien selama umur pakai bangunan. Berdasarkan penelitian sebelumnya, telah didapatkan bahwa biaya energi merupakan komponen biaya terbesar dalam life cycle cost suatu gedung. Data pada penelitian ini berasal dari manajemen pengelola gedung dan beberapa supplier produk dan peralatan yang di teliti. Analisis penelitian ini dilakukan dengan menjumlahkan biaya awal (C), biaya perawatan (M), biaya operasional (O), biaya penggantian (R) dari tiap produk dan peralatan. Sebelum dijumlahkan semua biaya dikonversikan dengan metode annual cost. Penelitian ini menunjukan bahwa penggunaan metode LCC pada saat menentukan peralatan mekanikal dan elektrikal yang digunakan pada suatu gedung apartemen dapat menghasilkan penghematan pada biaya pengelolaan gedung. Selain itu penelitian ini menunjukan bahawa sumber pendanaan awal yang berasal dari pinjaman bank tidak memberikan pengaruh terhadap pengambilan keputusan untuk pemilihan suatu produk dan peralatan yang berkaitan dengan energi In designing an apartment building that is economical and efficient, life cycle cost analysis is needed to obtain the most efficient design for service life of the building. Based on previous studies, it has been found that the energy cost is the largest cost component in the life cycle cost of a building. The data in this study came from the building management and from multiple suppliers of products and equipment. The analysis is done by summing the initial cost (C), the cost of maintenance (M), operating costs (O), the cost of replacement (R) of each product and equipment. Before all of the costs being added, these costs converted to annual cost method. This study shows that the use of the LCC method when determining the mechanical and electrical equipment used in an apartment building can result in savings on the building operational cost. In addition, these studies show that the source of initial funding from bank loans does not give effect to the decision making for the selection of a product and equipment related to energy.
PENGGUNAAN METODE TAKT TIME UNTUK PERENCANAAN JADWAL PEKERJAAN FINISHING DAN MEKANIKAN ELEKTRIKAL PLUMBING PADA SEBUAH PROYEK APARTEMEN Vedi Wihono Susilo; Andi Andi
Dimensi Utama Teknik Sipil Vol 6 No 1 (2019): April 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (562.778 KB) | DOI: 10.9744/duts.6.1.25-32

Abstract

ABSTRAK: Penjadwalan merupakan suatu hal yang sangat penting karena akan menentukan sebuah proyek selesai pada waktu yang ditentukan atau malah melebihi dari yang ditentukan, apabila melebihi dari yang ditentukan maka akan terkena sanksi. Penelitian ini dilakukan studi kasus pada proyek apartemen yang berlokasi di Surabaya bagian barat dimana metode yang dilakukan adalah dengan menggunakan takt time planning pada pekerjaan finishing dan MEP. Data-Data yang dibutuhkan didapatkan dengan cara meminta kepada chief engineering dan setelah data tersebut didapatkan maka diolah menjadi suatu perencanaan baru dengan menggunakan metode takt time planning. Dalam pengolahannya dibutuhkan koordinasi dengan orang-orang dilapangan supaya tidak terjadi kendala pada saat pelaksanaan nya sehingga dapat menghasilkan hasil yang diharapkan. Hasil dari penelitian ini didapatkan bahwa perencanaan dengan menggunakan metode takt time yaitu terjadinya keselarasan dalam tiap-tiap pekerjaan selain itu juga dapat mempercepat durasi proyek sebesar 1 minggu dari perencaan awal.
OPTIMIZED MANAGEMENT STRATEGY FOR CONSTRUCTION PROJECTS CONSIDERING THE TRADE-OFF OF ESTIMATE SCHEDULE AND COST AT COMPLETION Liem Stefani Meilia Gunawan; Min-Yuan Cheng; Doddy Prayogo
Dimensi Utama Teknik Sipil Vol 6 No 2 (2019): October 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (817.013 KB) | DOI: 10.9744/duts.6.2.26-37

Abstract

Nowadays, the minimization of project time and cost is an important issue. However, time and cost problems are difficult to solve. They are affected by the uncertain factor. Then, the construction project always fails to achieve the effectiveness of time and cost performance. It causes delays and cost overrun. In this research, SOS-NN-LSTM is required to establish the estimate schedule to completion (ESTC) and estimate cost to completion (ECTC) prediction model based on time now performance. Then, the prediction model will be integrated with MOSOS to obtain the optimal prediction value. The integration is needed because there is no direct equation to calculate the ESTC and ECTC. The Pareto curve identified based on the prediction values of MOSOS. The Pareto curve is used to determine the optimal trade-off between project duration and project cost. Then, the indifference curve is used to solve the trade-off problem between estimate schedule at completion (ESAC) dan estimate cost at completion (ECAC) which give the decision-maker preference.
Faktor-Faktor Yang Mempengaruhi Keputusan Calon Pembeli Dalam Melakukan Pembelian Apartemen Mewah di Surabaya Williams Dennis Masamitsu; Timoticin Kwanda; Jani Rahardjo
Dimensi Utama Teknik Sipil Vol 6 No 2 (2019): October 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.6.2.38-48

Abstract

Williams Dennis Masamitsu: Postgraduate Thesis Factors That Influence Prospective Buyer's Decisions to Buy Luxury Apartment in Surabaya This research aims to find out factors that influence prospective buyer’s decision to buy luxury apartment in Surabaya. Data which were collected through online survey from 68 respondent from various city in Indonesia who have the desire to buy luxury apartments in Surabaya. Research gap in this study is that researchers add 2 new variables that have not been studied before. These variables are the another apartments costs and property management. This type of research is quantitative causal. This research used regression models to analyze the effect of price and scheme, another apartment costs, motivation, lifestyle, environment and relation, location, facility, building design and structure, property management, and promotion on prospective buyers to buying decision to luxury apartment in Surabaya. The result showed that simultaneously all the variable have positive and significant influence on consumer buying decision. Partially, the result showed that environment and relation, building design and structure, and property management has the most dominant effect on prospective buying
EFFECT OF FINANCIAL ABILITY OF FIRST-TIME HOME BUYERS ON HOUSE PRICES WITH PARENTAL FINANCIAL ASSISTANCE Alvin Januar Haryono; Njo Anastasia; Jani Rahardjo
Dimensi Utama Teknik Sipil Vol 6 No 2 (2019): October 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (446.736 KB) | DOI: 10.9744/duts.6.2.14-25

Abstract

Rumah merupakan salah satu kebutuhan primer. Membeli rumah merupakan salah satu keputusan penting dalam rumah tangga karena nilainya yang besar dan merupakan nilai terbesar dalam portofolio aset keluarga. Namun keterbatasan finansial menjadi salah satu penghambat dalam suatu keluarga untuk membeli rumah. Oleh sebab itu perlunya bantuan finansial orang tua dalam pembelian rumah pertama anaknya. Sehingga penelitian ini bertujuan untuk mengetahui keterlibatan orang tua dalam proses pendanaan pembelian rumah pertama anaknya serta seberapa besar pengaruh bantuan finansial orang tua kepada anaknya dalam membeli rumah pertama kali. Hasil dari penelitian ini menunjukkan bahwa orang tua terlibat dalam pembelian rumah pertama kali untuk anaknya sesuai dengan pendapatannya dan bentuk bantuan yang diberikan. Dari 212 responden, sebagian besar yaitu sebanyak 72,2% orang tua terlibat dalam proses pendanaan rumah pertama anaknya. Rata-rata besar kontribusi bantuan finansial orang tua sebesar 44,4% dari harga rumah. The house is one of the primary needs. Buying a home is one of the important decisions in a household because it has a large value and is the biggest value in a family's asset portfolio. But financial limitations become one of the obstacles in a family to buy a house. Therefore the need for financial assistance from parents for the first time buying a home for their children. So this study aims to determine the involvement of parents in the process of funding their first-time home purchase and how much influence the financial assistance of parents to their children in first-time buying a home. The results of this study indicate that parents are involved in first-time home purchases for their children according to their income and the form of assistance provided. From 212 respondents, the majority of which is as much as 72.2% of parents involved in the first-time home funding process for their children. The average contribution of parents' financial assistance was 44.4% of the price of the house.
SELECTION AND EVALUATION SUPPLIER BY CONTRACTOR: CASE STUDY IN INDONESIA Andi Theo Haryanto; Paul Nugraha; I Gede Agus Widyadana
Dimensi Utama Teknik Sipil Vol 6 No 2 (2019): October 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (599.024 KB) | DOI: 10.9744/duts.6.2.1-13

Abstract

This research will discuss about contractors with concrete suppliers and formwork suppliers. The research is conducted to look for ranking criteria and sub-criteria used by contractors to selecting and evaluating concrete and formwork suppliers. The criteria and sub-criteria are refer to Ho et al., (2007) and three new sub-criteria are added, which are a guarantee, lowest price guarantee, and payment term. The contractor classification is divided into four namely general classification, NPK classification consisting of non-classification; individual; small business, medium business classification, and big business classification. Ranking for criteria and sub-criteria are sought based on the mean value for each classification material both in the context of selection and evaluation. After finding the ranking, it is sought whether there is a difference of importance between the NPK classification, middle, and large of the priority sub-criteria in general classification using the Kruskal Wallis test.
The Effect of Residential Preferences on the Willingness to Pay for Residential with Near Toll Road Gate in Surabaya Victor Winata Pranoto; Anastasia Njo
Dimensi Utama Teknik Sipil Vol 7 No 1 (2020): April 2020
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (440.671 KB) | DOI: 10.9744/duts.7.1.33-46

Abstract

This study targeted to investigate whether factor of physical condition, planning concept offered, location, and financial affect the willingness to pay for residential with near toll road gate in Surabaya and also find out the percentage of willingness to pay for residential with near toll road gate in Surabaya. The samples are people who have intention of buying residential or have puchase residential in Surabaya and in productive age. The data analysis method used is Partial Least Square (PLS) using the Smart PLS program. The results of this analysis showed that physical condition, planning concept offered and location affect the willingess to pay for residential with near toll road gate in Surabaya, while financial not significantly affect. For willingness to pay residential with near toll road gate in Surabaya, most of them answer between 0-10%.
PERBANDINGAN KINERJA ARTIFICIAL INTELLIGENCE DALAM MEMPREDIKSI KUAT TEKAN BETON Nico Christiono; Doddy Prayogo
Dimensi Utama Teknik Sipil Vol 7 No 2 (2020): Oktober 2020
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (677.02 KB) | DOI: 10.9744/duts.7.2.1-17

Abstract

Today, concrete quality prediction can be performed with the help of artificial intelligence (AI) to solve existing problems. However, determining the best AI method for predicting concrete compressive strength remains an open question. Therefore, this research evaluates the most accurate AI modeling for predicting various kinds of concrete mixtures. AI methods used in this study are artificial neural networks (ANN), support vector machines (SVM), classification and regression trees (CART), and linear regression (LR). Furthermore, these four AI methods are run with several parameters and tested with 4 different kinds of concrete dataset. Four error indicators and 1 normalization indicator are used to evaluate AI and determine the best AI method. From the Obtained results, indicate that ANN has the best performance when compared with 3 other AI methods. It can be seen that from ANN produced smaller error values when compared to the other three AI methods.
A Financial Distress Prediciton on Property, Construction, and Real Estate Companies Listed in BEI Alberto Orson Ongkowidjojo; Anastasia Njo; Januar Budiman
Dimensi Utama Teknik Sipil Vol 7 No 1 (2020): April 2020
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (762.094 KB) | DOI: 10.9744/duts.7.1.1-9

Abstract

The slowing of economic growth in Indonesia could cause financial distress for companies in property, construction and real estate sectors as these companies has enormous amount of GDP contributions in Indonesia. These difficulties are related to companies being able to accomplish all its responsibilities in short nor long terms. In assessing financial status of a company, discriminant analysis could be of use to see financial ratio such as liquidity ratio, profitability, activity and solvability. This research consists of comparative and sample pulling technique towards 81 population in multiple sectors such as property, construction and real estate. Data collection method by documentation. Discriminant analysis results depicts that liquidity ratio(CA/CL), profitability (EBIT/TA and NI/SALES), activity (SALES/TA), and solvability (BV/TL and TL/EQUITY) could be used to distinguish which company are experiencing financial distress and which are not.

Page 6 of 18 | Total Record : 171