cover
Contact Name
Kadek Adi Indra Brata
Contact Email
info.ppjunwar02@gmail.com
Phone
-
Journal Mail Official
ikawahyuni@gmail.com
Editorial Address
Program Pascasarjana Universitas Warmadewa, Program Studi Magister Rekayasa Infrastruktur dan Lingkungan Jalan Terompong no 24, Denpasar, Bali-Indonesia
Location
Kota denpasar,
Bali
INDONESIA
Jurnal Abdi Daya
Published by Universitas Warmadewa
ISSN : 27760863     EISSN : 27762548     DOI : https://doi.org/10.22225/jad
Core Subject : Engineering,
ABDI DAYA (Jurnal Pengabdian dan Pemberdayaan) merupakan jurnal IPTEK Infrastruktur dan Perencanaan Wilayah yang diterbitkan dua kali dalam setahun oleh Magister Infrastruktur dan Teknik Lingkungan, Universitas Warmadewa. MRIL merupakan program studi terbaru program pascasarjana di Universitas Warmadewa dengan konsentrasi pada sanitasi dan air bersih, infrastruktur dan material mutakhir, serta mitigasi bencana dan pengelolaan wilayah pesisir. Sehingga konsentrasi inilah yang menjadi ruang lingkup jurnal ini.
Articles 1 Documents
Search results for , issue "6-10" : 1 Documents clear
Perencanaan Jalan Setapak Pemedek dan Fasilitas Umum (FASUM) di Pura Pajinengan Gunung Tapsai Kabupaten Karangasem, Bali Sumanjaya, A.A Gede; Asmani K , A.A Rai; Cri Vinantya L , Ida Ayu
Jurnal Abdi Daya 6-10
Publisher : Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/jad.1.2.2021.6-10

Abstract

Karangasem Regency is one of 8 regencies in Bali Province which is located in the eastern part of Bali. Adjacent to Besakih Temple, in Pempatan Village, Rendang District, there is a temple called Pajinengan Gunung Tap Sai Temple. To increase and support the enthusiasm of the pamedek to the temple, it is necessary to improve facilities and infrastructure in the form of good road access, directions for the order of prayer, and public facilities such as toilets and washtafel for the pamedek. The method of data acquisition in this planning is by collecting data by interviewing the Pangempon Pura Pajinengan Gunung Tapsai and the observation method to see the original condition of the planning location so that the data is obtained is valid to facilitate planning for parking area arrangements and the layout of public facilities. Based on the results of interviews and observations at the location, the results obtained related to the inhibiting factors in this activity were the desire of the Pangempon to increase the area of ​​the temple, because the Pangempon wanted to maximize the provision of public facilities and arrangement of merchant stalls around the temple area. Based on the results of the previous discussion, it can be concluded that there is a need for structuring parking areas, public facilities, and merchant kiosks for which 2 (two) alternative plans are made. Alternative 1 is planned for 73 merchant kiosks measuring 4 x 5 meters, 124 four-wheel parking areas, 221 two-wheel parking areas, and 5 toilet units. Alternative 2 is planned for 47 merchant kiosks measuring 4 x 5 meters, 152 four-wheel parking areas, 287 two-wheel parking areas, and 5 toilet units

Page 1 of 1 | Total Record : 1