cover
Contact Name
Kadek Adi Indra Brata
Contact Email
info.ppjunwar02@gmail.com
Phone
-
Journal Mail Official
ikawahyuni@gmail.com
Editorial Address
Program Pascasarjana Universitas Warmadewa, Program Studi Magister Rekayasa Infrastruktur dan Lingkungan Jalan Terompong no 24, Denpasar, Bali-Indonesia
Location
Kota denpasar,
Bali
INDONESIA
Jurnal Abdi Daya
Published by Universitas Warmadewa
ISSN : 27760863     EISSN : 27762548     DOI : https://doi.org/10.22225/jad
Core Subject : Engineering,
ABDI DAYA (Jurnal Pengabdian dan Pemberdayaan) merupakan jurnal IPTEK Infrastruktur dan Perencanaan Wilayah yang diterbitkan dua kali dalam setahun oleh Magister Infrastruktur dan Teknik Lingkungan, Universitas Warmadewa. MRIL merupakan program studi terbaru program pascasarjana di Universitas Warmadewa dengan konsentrasi pada sanitasi dan air bersih, infrastruktur dan material mutakhir, serta mitigasi bencana dan pengelolaan wilayah pesisir. Sehingga konsentrasi inilah yang menjadi ruang lingkup jurnal ini.
Articles 1 Documents
Search results for , issue "50-58" : 1 Documents clear
The Planning of Bill of Quantity for the Construction of the Sibetan Village Market Dharmastika, I Gusti Agung Gede Nodya
Jurnal Abdi Daya 50-58
Publisher : Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/jad.4.1.2024.50-58

Abstract

The village of Sibetan in Bebandem District, Karangasem Regency, has promising potential in the agricultural sector, one of which is the snakeskin fruit. Most of the villagers in Sibetan own snakeskin fruit fields, which serve as their main source of livelihood. The distribution of this snakeskin fruit can be done by selling it at the market. However, the Sibetan village market does not yet have adequate facilities, so planning documents are needed for its development. The Bill of Quantity (BOQ) is one of the documents required to realize the construction. In this activity, the BOQ for the Sibetan village market will be prepared using the design already owned by the village authorities. The unit price method will be used to prepare the RAB for the Sibetan village market. The results of the activity indicate that the construction of the Sibetan village market requires a budget of IDR 701,950,397. The prepared BOQ will later be used to draft funding proposals, serve as a basis for decision-making, contract drafting, and cost control during the construction implementation.

Page 1 of 1 | Total Record : 1