cover
Contact Name
Jurnal Mineral
Contact Email
mineral.ubb@ubb.ac.id
Phone
+6281373020110
Journal Mail Official
mineral.ubb@ubb.ac.id
Editorial Address
Gedung Dharma Pengabdian, Fakultas Teknik Universitas Bangka Belitung, Kampus Terpadu UBB, Balunijuk Provinsi Kepulauan Bangka Belitung
Location
Kab. bangka,
Kepulauan bangka belitung
INDONESIA
MINERAL
ISSN : 25407708     EISSN : 2620729X     DOI : https://doi.org/10.33019/mineral.v6i2
The scientific journal called MINERAL is a scientific periodical publication of Mining Engineering Department , Bangka Belitung University, which is published every April and October in a year which the scope of Exploration (Geology and Geophysics), Geotechnical / Geomechanics, Minerba Processing, Minerba Management and Economics, Mining Environment, Reclamation and Post-Mining. This journal collaborates with Association of Indonesian Mining Professionals (PERHAPI) Center and Forum Komunikasi Program Studi Teknik Pertambangan se-Indonesia.
Articles 172 Documents
Analisis Kuat Tekan Dan Penyerapan Air Menggunakan Pasir Tailing Timah Dan Kaolin: Analysis of Compressive Strength and Water Absorption Using Tin Tailings Sand and Kaolin Zikri, Ummi Athiyyah; Hisyam, Endang Setyawati
MINERAL Vol 8 No 2 (2023): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v8i2.4693

Abstract

The environmental damage resulting from mining not only eliminates soil fertility but changes the landscape of the existing ecosystem and produces waste such as tailings and kaolin and understory. The results of tin and kaolin tailings mining have not been utilized optimally. This research aims to analyze the effect of using tin tailings sand and kaolin on bricks which produces compressive strength and water absorption in accordance with standards. The method used is to take tin and kaolin tailings mixed with clay with a predetermined composition and tested in the laboratory. Based on the test results, the compressive strength value obtained meets the standards, namely the percentage of 15% tin tailings sand and 10% kaolin, the compressive strength value is 5,150 Mpa. The water absorption value using percentages of 5%, 10% and 15% tin tailings sand and 10% kaolin has met the specified standards.
Estimasi Cadangan Batugamping Menggunakan Block Model Berdasarkan Metode Interpolasi IDW pada IUP OP 231 Karangkemojing: Estimation of Limestone Reserves Using Block Model Based on IDW Interpolation Method in IUP OP 231 Karangkemojing Pertiwi, Agyun Kinanti Fauziyah; Santi, Narulita
MINERAL Vol 9 No 2 (2024): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i2.4710

Abstract

The increasing development of infrastructure development has an impact on the increase in cement demand. Cement is used as the main raw material in making concrete and other construction materials. Therefore, limestone mining as a raw material for cement is also increasing. One of the areas that has prospects for limestone mining is IUP OP 231 Karangkemojing which is still in the exploration stage. The purpose of this study is to determine the geological and geomorphological conditions of the study area, determine the amount of limestone reserves, and determine the estimated mine life based on production targets. The methods used in this research are field observation and laboratory analysis including petrographic analysis and X-Ray Fluorescence (XRF) analysis. Furthermore, the calculation of limestone reserves was carried out using block modeling and the Inverse Distance Weighting (IDW) interpolation method processed using Surpac software. Based on field geological mapping, the research area is included in the wavy hilly and steep hilly structural landforms, which consist of two lithological units, namely sandstone and claystone intermixture units and limestone units. The results of the calculation of limestone reserves in the study area were obtained at 61,444,362 tons with an estimated mine life of about 24 years and 6 months.
Interpretasi Material Pada Rancang Bak Ukur Skala Laboratorium Dengan Pendekatan Konfigurasi Wenner, Wenner – Schlumberger dan Dipole-dipole: Material Interpretation in Laboratory Scale Measurement Design Using Wenner, Wenner–Schlumberger and Dipole-dipole Configuration Approaches Guskarnali, Guskarnali; Oktarianty, Haslen; Irvani, Irvani; Tono, E.P.S.B. Taman; Andini, Delita Ega
MINERAL Vol 8 No 2 (2023): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v8i2.4958

Abstract

Geoelectric measurements have been carried out using multichannel ResistivityMeter (Geores) tools with Wenner, Wenner-Schlumberger, and Dipole-dipole Configuration approaches on the influence of materials arranged in a laboratory-scale measuring tub design with dimensions of 194x184x80 cm. The measured method is the variation in resistivity value against each trajectory of the material. The method used is the variation of resistivity values for each path of the material that has been arranged in a laboratory scale measuring design. Geoelectric measurements were carried out on 7 lines (5 line in the West-East direction and 2 line in the North-South direction). The spacing between the electrodes of each line is 10 cm with 16 electrodes in one line so that each line has a length of 160 cm or 1.6 m which corresponds to the length and width dimensions of a laboratory scale measuring design. The electrode arrangement parameters are constant with respect to changes in the configuration selected from the geores parameters during geoelectric measurements. The measurement results showed that the identified depth reached 31.2 cm. The low resistivity value category has an interval of 374-4,397 ohm.meters at a depth of 0-12.5 cm, which is the influence of building sand material containing water and soil, while the depth interval is 12.5 - 31.2 cm ohm.meters (material category that is influenced by 2 iron rods, tin tailings sand, granite, gravel) with resistivity values ranging from 12,378–67,498 ohm.meters. From experiments on the influence of the resistivity values of the three Wenner, Wenner-Schlumberger, and Dipole-dipole configurations, it was obtained that the smallest absolute error resistivity value in the Wenner configuration was 5.01% against the overall average absolute error resistivity value of 10.16%.
Evaluasi Kinerja Alat Pengolahan Wet Belt Low Intensity Magnetic Separator (WBLIMS) Untuk Meningkatkan Kadar dan Recovery Sn di TB Primer Batubesi PT Timah Tbk Kabupaten Belitung Timur: (Performance Evaluation of Wet Belt Low Intensity Magnetic Separator (WBLIMS) for Enhancing Grade and Recovery of Sn in the Primary TB Batubesi Site PT Timah Tbk East Belitung Regency) Pangestu, Dimas; Franto, Franto; Pitulima, Janiar
MINERAL Vol 8 No 2 (2023): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v8i2.5020

Abstract

Primary TB Batubesi Site a subsidiary of PT Timah Tbk, processes primary tin feed stockpile and SHP of oxide clay type using various tools, including the Wet Belt Low Intensity Magnetic Separator (WBLIMS). Currently, WBLIMS can only produce tin concentrate with a grade of 0.5-2% and a recovery of 5-8%, falling below the company's target of 8% grade and 15% recovery (XRF Test). This research conducted eight experiments with variations in feed types and rates. The WBLIMS feed from the stockpile has a Sn content of 0.62%, resulting in a tin concentrate with 1.21% Sn and a recovery of 7.05%. On the other hand, the feed from SHP has a Sn content of 0.61%, resulting in a tin concentrate with 0.95% Sn and a recovery of 5.11%. The type and rate of feed affect the increase in Sn grade and recovery. At low feed rates, the feed material yields lower Sn grade and recovery, while at high feed rates, the results are higher. Increasing the feed rate for WBLIMS from the stockpile leads to a decrease in Sn grade and recovery, whereas in the processing of SHP, the Sn grade increases but recovery varies. Experiments F1L1 and F2L3 yield the most optimal Sn grade and recovery, with F1L1 having a Sn grade of 2.28% and recovery of 11.54%, and F2L3 having a Sn grade of 2.87% and recovery of 9.24%. Although not reaching the company's target, these experimental results can enhance the Sn grade and recovery compared to the previous setup.
Perhitungan Volume Stockpile dan Pengoptimalan Waktu Pengolahan Stockpile 3, 5 dan 6 Terhadap Produksi Alat Gali muat dan Alat Angkut pada TB Primer Batubesi PT Timah Tbk: Calculation of Volume Stockpile and Optimization of Stockpile Processing Time 3, 5 and 6 Against the Production of Digging and Loading Equipment and Transport Equipment in Primary TB Batubesi PT Timah Tbk Sherina, Neni; Franto, Franto; Mardiah, Mardiah
MINERAL Vol 8 No 2 (2023): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v8i2.5070

Abstract

PT Timah Tbk's Batubesi Primary Large Mine has experienced a significant decline in production in recent years, causing a change in the mining process to stockpile management that is still economical with a grade of 0.2%. This study aims to determine the volume and production of stockpiles 3, 5 and 6, the type of sediment and Sn content of stockpile material and the time required to spend stockpile material 3, 5 and 6 in order to get the optimal time. The method used is a quantitative method by taking cycle time data as much as 30 data and analyzing sample levels using XRF on each stockpile. The results of this study obtained the volume of stockpile 3 material is 132,648.42 m3,, stockpile 5 is 162,570.25 m3, and stockpile 6 is 33,090.19 m3. The calculated machine productivity at stockpile 3 is 42.17 tons/hour, stockpile 5 is 48.11 tons/hour and stockpile 6 is 39.53 tons/hour. The highest Sn content is found in stockpile 6 which is 0.33% with the type of skarn sediment. While the lowest Sn content is found in stockpile 3 which is 0.2% with oxide clay sediment type. In stockpile 5, the Sn content is 0.31% with the type of oxide clay sediment. The remaining volume of stockpile material in stockpiles 3, 5 and 6 can be spent with a time of 2.78 years using 1 unit of excavation equipment and 1 unit of transportation equipment. Optimization is carried out so that the remaining stockpile reserves can be spent within 1.74 years using 1 unit of excavation equipment and 2 units of transport equipment.
Kajian Teknis Kinerja Jig Primer terhadap Kadar Recovery dan Looses Bijih Timah pada SHP KIP Mitra Matras di Bidang Pengolahan Mineral Unit Pengolahan PT Timah Tbk: Analysis Technical Study of Primary Jig Performance on Recovery Rates and Tin Ore Losses at SHP KIP Mitra Matras in the Mineral Processing Sector at Processing Unit of PT Timah Tbk Aditya, Ismu; Pitulima, Janiar; Andini, Delita Ega
MINERAL Vol 9 No 2 (2024): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i2.5073

Abstract

Bidang Pengolahan Mineral Processing Unit of PT Timah Tbk operates in the field of tin ore processing. The problem at the research location is that there is no standard operating standard for the Primary Jig tool for washing Processing Waste (SHP). The aim of this research is to determine the settings for the Primary Jig variables in order to obtain optimal levels, Sn recovery and looses. The research method used is Grafity Concentration. The feed used is SHP from KIP Mitra Matras. The experiment was carried out 21 times. Each experiment used 7 variations of Primary Jig stroke speed (300 rpm, 350 rpm, 400 rpm, 450 rpm, 500 rpm, 550 rpm, 600 rpm) and Bed thickness (70 mm, 80 mm, 90 mm). Grain Counting Analysis shows a feed Sn content value of 9.96%. GCA analysis shows that the minerals in the bait are cassiterite, ilmenite, monazite, zircone, pyrite, siderite, limonite, tourmaline, quartz and iron rust. Low stroke speed results in high concentrate Sn content with low Sn recovery and little looses wasted and vice versa. A high Bed thickness results in low Sn concentrate content, high Sn recovery, and a lot of looses is wasted, and vice versa. Setting the optimal Primary Jig operating variables with variations in punch speed of 450 rpm and Bed thickness of 80 mm obtained a Sn content of 41.36% and a Sn recovery of 60.11%. Based on the results of calculating the degree of liberation, the highest average value of the degree of liberation was obtained at mesh -100, indicating that the SHP KIP Mitra Matras concentrate is classified as having a fine grain size.
Analisis Konsumsi Bahan Bakar Alat Muat dan Angkut Pada Pengupasan Overburden di PT Putra Maga Nanditama Bengkulu Utara: Analysis of Fuel Consumption of Loading and Transport Equipment in Overburden Stripping at PT Putra Maga Nanditama North Bengkulu Alamsyah, Muhammad Izhar; Franto, Franto; Andini, Delita Ega
MINERAL Vol 9 No 2 (2024): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i2.5135

Abstract

The research was conducted at PT Putra Maga Nanditama site Gunung Selan, PT Putra Maga Nanditama is a company engaged in coal mining. The background to the research is that overburden production did not reach the company's target and fuel consumption for overburden loading and transport equipment exceeded the company's fuel target. The research method used is a quantitative method. Data collection consists of primary and secondary data. Primary data includes tool cycle time and work efficiency, actual fuel consumption as well as road geometry and distance to disposal. Secondary data in the form of regional performance maps, equipment specifications, rainfall data, equipment working hours data, drone maps for August 2023 and contours. Based on the results of research in the field, factors that influence fuel consumption such as road geometry, road conditions and distance to overburden disposal are still not in accordance with established standards. The productivity of the DX800LC Excavator is 279.59 BCM/hour, the Doosan DA45 ADT is 60.47 BCM/hour and the Volvo A40G ADT is 59.37 BCM/hour. For Doosan DX800LC Excavator fuel consumption is 48.21 liters/hour, ADT Doosan DA45 is 26.62 and ADT Volvo A40G is 23.72 liters/hour. The actual fuel comparison for the two haulers is that the ADT Volvo A40G is more efficient than the ADT Doosan DA45 both in terms of fuel consumption and fuel costs.
Perencanaan Tahapan Persiapan Dan Perhitungan Reklamasi Di Lahan Bekas Tambang Air Rikai PT Timah Tbk Kabupaten Bangka: Planning for Preparatory Stages and Reclamation Calculations on the Former Air Rikai Mine Land of PT Timah Tbk, Bangka Regency Zahrah, Salsabila Oldia; Franto, Franto; Mardiah, Mardiah
MINERAL Vol 9 No 1 (2024): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i1.5140

Abstract

The research location chosen was the Air Rikai ex-mining land, which is an alluvial ex-mining land within the IUP of PT Timah Tbk. The negative impact that arises from mining is in the form of land damage. This research aims to overcome damage and also ensure that reclamation activities can be carried out well. The method used in this research is a quantitative method. The data taken is in the form of soil samples, soil pH and water pH data, topographic data (x,y,z coordinates) and bathymetric data for the depth of the pit. The results of data processing and analysis show that the condition of the land to be reclaimed has an area of 13 Ha and is divided into 2, namely voids with a total area of 1.57 Ha and land area of 11.43 Ha. Land use is carried out by stockpiling overburden with a required volume of overburden of 35,511.54 m³. Land leveling with a volume of pushed soil of 35,280 m³. Arrangement of the edge of the pit with a volume of soil moved of 230.29 m³. Construction of drainage channels with an excavation volume of 214.59 m³. Installation of concrete buis type culverts with dimensions of 50 x 50 cm and a length of 50 cm. In the revegetation, 1,517 oil palm trees were planted, then 463 sea cypress trees were planted along the underside and LCC seeds to help loosen the soil. Treating acid mine drainage with 350 water hyacinths. The costs required for reclamation are divided into 2, namely, Direct Costs and Indirect Costs. The direct costs required are IDR 679,286,160 and the indirect costs required are IDR 213,975,140. The total costs required for reclamation of land with an area of 13 Ha are IDR 893,261,300.
Optimasi Desain Geometri Lereng Material Old Dump Pada Usaha Penggalian Ulang Pit X PT. Bukit Asam Tbk: Optimization Of Geometry Design Of Old Dump Material Slopes On The Pit X Re-Excavation Plan Of PT. Bukit Asam, Tbk. Pebrianto, Rosihan; Louisa, Anna Amelia; Harsiga, Edwin; Waristian, Harry
MINERAL Vol 9 No 1 (2024): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i1.5298

Abstract

In doing slope design, it is necessary to pay attention to slope geometry and soil shear strength. Determination of slope geometry design also considers the balance between height and slope and production benefits. Research was conducted to analyze slope stability through physical and mechanical properties testing, limit equilibrium, and probabilistic Monte Carlo methods. The surface area of the Overburden stripping area in the 2024 RKP design is 8,172.79 m2. The production target is 2,000,000 tons of coal with a volume of overburden material that must be stripped of 29,000,000 BCM and obtained a Stripping Ratio value of 14.5. The results of the evaluation of the overall slope of the Old Dump material with an overall slope height of 66.582 m, a slope width of 447.69 m, an overall slope of 8.32˚ and a bench width of 25 m, a bench height of 6 m with a comparison ratio of 1:3 and a single slope angle of 18.43˚. Then the redesign was carried out and obtained recommendation results of 64.799 m overall slope height, 303.33 m slope width, 13.02˚ overall slope, and 25 m bench width, bench height at elevation 131-110 of 8 m with a comparison ratio of 1:2, single slope 26.57˚ and at elevation 110-50 of 8 m with a comparison ratio of 1:1.5, single slope 33.69˚.
Estimasi Sumberdaya Andesit dan Breksi Piroklastik Sebagai Bahan Konstruksi PT. Tepat Guna Referindo Lombok Timur: Estimation of Andesite and Pyroclastic Breccia Resources as Construction Materials for PT. Tepat Guna Referindo East Lombok Rukayah, Rukayah; Syailendr, Aji; Erintina, Melinda Dwi
MINERAL Vol 9 No 1 (2024): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i1.5425

Abstract

Estimate of andesite and pyroclastic breccia resources at PT Tepat Guna Reforindo has been carried out. Which is an area with potential for non-metallic mining materials. This research was carried out using the Civil 3D Gridding method. One of the non-metallic minerals found in East Lombok district is andesite rock and pyroclastic breccia. The research was carried out using petrological analysis methods to obtain rock types and estimate the availability of minerals and sieve analysis to obtain density values at the research location. Based on the results of petrological analysis, it shows that the sample is a type of andesite rock and also breccia. However, the presence of all samples is dominated by andesite rock samples which are abundant in 95% of the exploration area. Based on the results estimation of andesite rock resources from geological modeling and calculations using the Civil 3D Gridding method from A-B at an elevation of 100-40 meters above sea level, it was found that the measured resource of andesite rock units had a volume of 492,638.108 m3 and resource of pyroclastic breccia rock units had a volume of 738,957.162 m3, results of the analysis of the average rock density of 2.74 g/cm3, then the tonnage of the andesite unit is 1,302,781.480 tons and the pyroclastic breccia tonnage is 1,998,879.120 tons.