cover
Contact Name
Yudhi Nugroho Adi
Contact Email
library@tekomuniversity.ac.id
Phone
+628128000110
Journal Mail Official
library@telkomuniversity.ac.id
Editorial Address
Jl. Telekomunikasi - Ters. Buah Batu Bandung 40257 Indonesia
Location
Kota bandung,
Jawa barat
INDONESIA
eProceedings of Engineering
Published by Universitas Telkom
ISSN : 23559365     EISSN : -     DOI : https://doi.org/10.34818/eoe.v9i5.18452
Merupakan media publikasi karya ilmiah lulusan Universitas Telkom yang berisi tentang kajian teknik. Karya Tulis ilmiah yang diunggah akan melalui prosedur pemeriksaan (reviewer) dan approval pembimbing terkait.
Articles 8,304 Documents
Perancangan Enterprise Architecture Untuk Sistm Terintegrasi Pada Bidang Pemasaran Non Kayu Perum Perhutani Menggunakan Togaf Adm Ranti Dwita Putri; Tien Fabrianti Kusumasari; Iqbal Santosa
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Perum Perhutani adalah perusahaan Badan Usaha Milik Negara (BUMN) pengelola hutan yang memiliki peran strategi yang mendukung sistem kelestarian lingkungan, sosial budaya dan perekonomian masyarakat kehutanan nasional. Perum Perhutani merupakan perusahaan pengelolaan hutan di pulau Jawa dan Madura yang berdiri pada tahun 1961. Perum Perhutani memiliki beberapa fungsi bisnis, salah satunya adalah fungsi pemasaran. Fungsi pemasaran merupakan salah satu fungsi yang berperan penting dalam sebuah bisnis di perusahaan. Fungsi pemasaran adalah kunci sukses dari keberhasilan bisnis di sebuah perusahaan. Perum Perhutani memiliki visi yaitu menjadi perusahaan pengelolaan hutan terkemuka di dunia dan bermanfaat bagi masyarakat. Untuk mewujudkan visi tersebut, Perum Perhutani harus mampu melakukan peningkatan terutama dibidang pemasaran. Penelitian ini merupakan fungsi yang bertujuan untuk mengembangkan kemampuan perusahaan dan menyokong strategi bisnis perusahaan. Proses pemasaran di Perum Perhutani sudah menggunakan website namun hanya berfokus pada penjualan kayu. Sedangkan hasil hutan lainnya yang diproduksi oleh Perum Perhutani sangat banyak yaitu berupa kayu dan non kayu (gondorukem, terpentin, madu, minyak kayu putih) yang penjualannya belum dilakukan secara online yang menyebabkan pembelian produk non kayu hanya dapat dilakukan oleh konsumen didalam kota. Oleh karena itu, untuk meningkatkan penjualan setiap tahunnya diperlukan sistem informasi yang terintegrasi dengan baik sebagai penunjang penelitian dan diperlukan perancangan enterprise architecture. Perancangan enterprise architecture untuk sistem informasi Perum Perhutani pada penilitian ini menggunakan TOGAF ADM, karena bersifat fleksibel dan open source. Enterprise Architecture berfungsi untuk menyelaraskan strategi bisnis dengan strategi IT, serta membuat perubahan proses bisnis menjadi lebih efektif dan efisien. Enterprise Architecture menerapkan prinsip arsitek dan belajar untuk memimpin organisasi melalui bisnis, informasi, proses, dan perubahan teknologi yang berperan penting untuk melaksanakan strategi yang telah direncanakan. Dalam penelitian kali ini akan menggunakan TOGAF ADM dalam merancang Enterprise Architecture, yaitu Preliminary Phase, Architecture Vision, Business Architecture, Information Sistem Architecture, Technology Architecture, Opportunities & Solution, dan Migration Planning dengan membandingkan keadaan eksisting dan target. Keluaran pada penelitian ini yaitu berupa blueprint arsitektur dan IT Roadmap dengan jangka waktu 5 tahun. Pada penelitian ini menghasilkan rancangan enterprise architecture pada bidang pemasaran non kayu di Perum Perhutani. Dalam rancangan ini akan dilakukan pembuatan aplikasi baru untuk transaksi jual beli produk non kayu, mulai dari pemesanan hingga pengiriman serta adanya fitur pelayanan pelanggan untuk mengelola perbaikan perusahaan agar menjadi lebih baik. Kata kunci: Enterprise Architecture, blueprint, IT Roadmap, TOGAF ADM Abstract Perum Perhutani is a State-Owned Enterprise (SOEs) company that has a strategic role that supports the environmental, social cultural and economic sustainability systems of the national forestry community. Perum Perhutani is a forest management company in Java and Madura which was established in 1961. Perum Perhutani has several business functions, one of which is the marketing function. The marketing function is a function that plays an important role in a business in a company. The marketing function is the key to success of business success in a company. Perum Perhutani has a vision of becoming the world's leading forest management company and benefiting the community. To realize this vision, Perum Perhutani must be able to make improvements, especially in marketing. This research is a function that aims to develop the company's capabilities and support the company's business strategy. The marketing process at Perum Perhutani has used the website but only focuses on the sale of wood. While other forest products produced by Perum Perhutani are very much in the form of wood and nonwood (Gondorukem, turpentine, honey, eucalyptus oil) whose sales have not been done online which has caused the purchase of non-timber products only by consumers in the city. Therefore, to increase sales every year a well-integrated information system is needed as a research support and an enterprise architecture design is needed. Designing enterprise architecture for Perum Perhutani information systems in this study using TOGAF ADM, because it is flexible and open source. Enterprise Architecture functions to align business strategies with IT strategies, and make business process changes more effective and efficient. Enterprise Architecture applies the principles of architecture and learning to lead organizations through business, information, processes and technological changes that play an important role in implementing the planned strategies. In this study will use TOGAF ADM in designing Enterprise Architecture, namely Preliminary Phase, Architecture Vision, Business Architecture, Information Systems Architecture, Technology Architecture, Opportunities & Solution, and Migration Planning by comparing existing conditions and targets. The output of this study is in the form of architectural blueprint and IT Roadmap. Key Word : : Enterprise architecture, blueprint, IT Roadmap, TOGAF ADM
Analisis Kelayakan Usaha Serta Perancangan Website Pada Pendirian Toko Online Sepatu Amezing Amelia Putri Anisa; Endang Chumadiyah; Anton Abdulbasah Kamil
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Amezing merupakan bisnis yang baru akan didirikan dan bergerak dibidang sepatu. Amezing akan dipasarkan secara online melalui sosial media instagram dan juga website. Fenomena belanja online tidak hanya berkembang pesat di dunia, namun juga di kalangan bisnis lokal Indonesia. Melihat peluang tersebut, Amezing tercetus sebagai ide bisnis fesyen berplatform online. Amezing memiliki produk yaitu sepatu flatshoes dan slippers. Amezing menawarkan model sepatu yang mengikuti tren yang ada. Dibuat oleh pengrajin lokal dan menggunakan bahan - bahan yang berkualitas. Dikarenakan bisnis ini baru akan didirikan maka dari itu dilakukan studi kelayakan bisnis untuk mengetahui apakah bisnis ini layak atau tidak untuk dijalankan. Dilihat dari aspek pasar, aspek teknis dan aspek finansial. Analisis aspek pasar didapatkan dari penyebaran kuesioner yang datanya akan digunakan untuk menentukan pasar potensial, pasar tersedia dan pasar sasaran. Selanjutnya melakukan analisis aspek teknis untuk mengetahui pengeluaran dan pemasukan pada usaha Amezing untuk 5 tahun mendatang. Aspek pasar menghitung kelayakan usaha kelayakan toko online sepatu Amezing. Diperoleh bahwa bisnis ini layak dijalankan, hal ini berdasarkan dari beberapa kriteria investasi yaitu IRR, NPV dan PBP. Berdasarkan IRR bisnis ini layak karena nilai IRR (28,10%) lebih dari MARR (10,25%), lalu berdasarkan nilai NPV bisnis ini pun layak dilakukan karena nilai NPV Rp. 120.436.335 lebih dari 0, dan beradasarkan PBP investasi akan kembali pada periode tahun ke 3 bulan ke 4. Maka berdasarkan ketiga kriteria investasi tersebut bisnis toko online sepatu Amezing layak dijalankan. Kata Kunci: Toko Online Sepatu, Analisis Kelayakan, NPV, IRR, PBP Abstract Amezing is a new business to be established and is engaged in shoes. Amezing will be marketed online through social media Instagram and also websites. The phenomenon of online shopping is not only developing rapidly in the world, but also among local Indonesian businesses. Seeing these opportunities, Amezing blaze up as a fashion business idea with an online platform. Amezing has products such as flatshoes and slippers. Amezing offers shoe models that follow the existing trends. Made by local craftsmen and using quality ingredients. Because this business will only be established, a business feasibility study will be conducted to find out whether the business is feasible or not to run. Viewed from the market aspect, technical aspects and financial aspects. An alysis of market aspects is obtained from the distribution of questionnaires whose data will be used to determine potential markets, available markets and target markets. Furthermore, analyzing the technical aspects to determine expenses and income in the Amezing business for the next 5 years. The market aspect calculates the business feasibility of the online shoe store Amezing eligibility. Obtained that this business is feasible to run, this is based on several investment criteria, namely IRR, NPV and PBP. Based on the IRR this business is feasible because the IRR value (28,10%) is more than the MARR (10.25%), then based on the NPV value this business is also feasible because the NPV value of Rp. 120.436.335 more than 0, and based on PBP the investment will return in the 3th year period to 4 month. Then based on the three criteria of investment, the online shoe store business Amezing is feasible. Keywords: Online Shop of Shoes, Feasibility Analysis, NPV, IRR, PBP
Sistem Penghitung Daya Pada Rumah Tangga Untuk Memprediksi Penghematan Biaya Listrik Dan Mengetahui Minimal Daya Yang Harus Dicatu Oleh Panel Surya Osep Prasetyo; Porman Pangaribuan; Asep Suhendi
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Peningkatan kebutuhan listrik di Indonesia saat ini berbanding terbalik dengan sumber pembangkit listrik yang tersedia. Saat ini, pemerintah menggencarkan pembuatan pembangkit listrik energi baru terbarukan untuk menggantikan pembangkit listrik yang menggunakan bahan bakar minyak bumi dan batubara. Pada tahun 2023, pemerintah menargetkan 23 % dari pembangkit listrik yang ada di Indonesia harus berasal dari pembangkit listrik energi terbarukan. Salah satu pembangkit yang gencar dibangun adalah pembangkit listrik tenaga surya. Untuk di kotakota besar, pemerintah menghimbau dan mengajak masyarakat untuk menggunakan panel surya skala rumahan untuk membantu mengurangi polusi udara dari pembangkit yang digunakan pemerintah yang masih menggunakan bahan bakar batubara dan minyak bumi. Dari permasalahan diatas, timbul ide untuk membuat tugas akhir ini. Disini saya akan membuat kalkulator yang bisa digunakan untuk memperkirakan berapa energi yang harus dibangkitkan oleh panel surya dan berapa biaya yang dibutuhkan untuk menghasilkan energi listrik tersebut. Kata Kunci : Photovoltaic, Energi baru terbarukan
Usulan Perbaikan Proses Penuangan Pada Shoulder E-clip Untuk Meminimasi Defect Beku Dini Dengan Menggunakan Metode Dmaic Di Pt Pindad Janu Prasetyo; Wiyono Wiyono; Widia Juliani
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT Pindad merupakan perusahaan industri dan manufaktur yang bergerak dalam pembuatan produk militer dan komersil diantaranya yaitu divisi tempa & cor. Teradapat 3 jenis produk sarana dan pra sarana kereta api yang di produksi, salah satunya adalah shoulder for e-clip. Berdasarkan data historis bulan Januari 2017 sampai dengan Desember 2018 produk ini mengalami rata-rata defect sebesar 5.22% per bulannya sedangkan toleransi defect yang ditetapkan perusahaan sebesar 2%. Jenis cacat yang paling banyak menghasilkan defect adalah beku dini yang terjadi pada saat proses penuangan. Penelitian ini akan difokuskan untuk mengurangi cacat beku dini pada proses penuangan dengan menggunakan pendekatan DMAIC (Define, Measure, Analyze, Improve, Control). Pada tahap define dilakukan pengidentifikasian CTQ menggunakan metode delphi dan pembuatan diagram SIPOC. Pada tahap measure dilakukan perhitungan stabilitas proses menggunakan peta kontrol p dan perhitungan kapabilitas proses sehingga diketahui rata-rata DPMO sebesar 3739 sedangkan untuk rata-rata level sigma sebesar 4.22. Pada tahap analyze digunakan tools fishbone diagram sehingga didapatkan faktor penyebab masalah adalah man, method, material, tools, dan environment. Setelah itu digunakan pendekatan FMEA untuk menentukan mode kegagalan yang akan diprioritaskan untuk dilakukan perbaikan sehingga didapatkan faktor method dan man yang memiliki nilai RPN tertinggi. Maka dari itu pada tahap improve usulan perbaikan di prioritaskan terhadap faktor man dan method untuk mengurangi cacat beku dini yaitu dengan pemasangan pirometer dan pembuatan checksheet. Kata kunci: Shoulder for e-clip, defect, DMAIC, beku dini, penuangan, CTQ, DPMO, FMEA Abstract PT Pindad is an industrial and manufacturing company engaged in manufacturing military and commercial products including the forging & cast division. There are 3 types of railway facilities and preproduction products produced, one of which is the shoulder for e-clip. Based on historical data from January 2017 to December 2018 this product experienced an average defect of 5.22% per month while the defect tolerance set by the company was 2%. The type of defect that produces the most defects is cold shut that occurs during the pouring process. This research will be focused on reducing cold shut defects in the pouring process using the DMAIC approach (Define, Measure, Analyze, Improve, Control). At the define stage CTQ is identified using the delphi method and SIPOC diagram making. In the measure phase, the calculation of process stability using p control chart and process capability calculations are calculated so that the average DPMO is 3739 while the average sigma level is 4.22. In the analyze stage, a fishbone diagram tool is used so that the causes of the problem are obtained which is by man, method, material, tools, and environment. After that, the FMEA approach is used to determine the failure mode that will be prioritized for improvement in which the method and man factors have the highest RPN values. Therefore, in the improve stage proposed improvements prioritize the man and method to reduce cold shut defects, namely by installing pyrometers and making checksheets. Keywords: cold shut, defect, DMAIC, premature freezing, pouring, CTQ, DPMO, FMEA
Analysis Of Discrete Wavelet Transform For Optimum Machine Instruction Of Dlx Microprocessor Shafitri Nurhanifa; Nyoman Bogi Aditya Karna; Raditiana Patmasari
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract The application of monitoring over Wireless Sensor Network (WSN) is highly demanded to be implemented in the Internet of Things (IoT). The problem that appears in IoT is the general purpose microprocessor is still highly used, which causes more energy used than it is needed. Although, an Application Specific Integrated Circuit (ASIC) can be used to make a more efficient energy application, it is more expensive and permanent, which means it can't be changed or reconfigured. This thesis presents a method to design a specific purpose microprocessor by compressing an image in DLX microprocessor, which can still be reconfigured by optimizing machine instruction needed in the microprocessor. Prior to DWT process, an image will go through pre-processing stage. The stage will be done in Matlab to turn an RGB image into a grayscale image, and the matrix of the grayscale image will be obtained. This matrix will be the input for Haar DWT machine instruction. The machine instruction is simulated in WinDLX, a simulator for DLX microprocessor. After the simulation has finished, the statistics of the simulation will be analyzed to conclude whether the machine instruction is optimum enough. The result of Haar DWT machine instruction is the same as the result obtained from Matlab, which means the machine instruction is capable to do the image compression. Out of 92 kinds of instruction, Haar machine instruction only needs 20 kinds of instructions used. This shows that the program will not waste energy for unused instruction. From the statistics obtained, the total cycles executed from the pipelined DLX microprocessor is 1239 cycles, where a non-pipelined microprocessor would need 2755 cycles to execute the program. This means the program is a more efficient method to run a Haar DWT compression. Keywords: optimum machine instruction, DLX microprocessor, DWT image compression, internet of things (IoT), wireless sensor multimedia networks. 1. Introduction As the technology grows more and more in human life, the phrase "Internet of Things" is not an uncommon phrase to be involved in the growth. Kevin Ashton was the first person to use the term “Internet of Things” in 1999. At that time, Kevin and his team were developing an extension of the internet to accommodate things and it inspired him to the term “Internet of Things” [1]. The idea of IoT was developed in parallel to WSNs [2]. Wireless Sensor Network or WSN is a network of a large number of nodes that cooperatively sense the environment. The application of the WSN has been done since the 1980s but then became more common to use in 2001 for industrial and research purposes [2]. The WSN is largely applied in many applications, such as environmental monitoring, industrial and infrastructure, and military surveillance. Although WSN is very useful for the convenience in the society, this technology also comes with some issues [3], such as the minimum exposure path [4] and the energy sink-hole [5], [6] in WSN. The main problem discusses in this thesis is the energy lifetime of the WSN itself, which people have been paying attention as well. Sensor nodes are usually powered by limited lifetime batteries. Changing the batteries frequently become very inefficient for a long use of WSN. There are many suggestions to this specific problem, such as wirelesspowered sensor networks [7] and harvesting solar energy as a wireless charging for the WSN [8]. However, even if the additional power can be harvested to the WSN, the resource is still limited for frequent use. Image compressing is a more detail strategy to reduce excessive energy consumption of WSN. There are many methods of image compressing used for this problem [9], [10]. This thesis uses the image compression strategy by creating DWT machine instruction to be inserted in DLX microprocessor so that the processor will run the specific instructions. This strategy will be efficient to get the most ideal microprocessor to be implanted in the WSN. Furthermore, the WSN will not be wasting energy on other microprocessor instructions that will be left unused. The purpose of this thesis is to analyze the energy efficiency WSN by reconstructing the machine instruction. The benefit is this method can be successfully implemented on WSN in multimedia sector. The problem can be formulated as how effective DWT for optimum machine instruction affects the WSN energy efficiency in multimedia monitoring system. This thesis uses DLX microprocessor and Haar DWT algorithm in DLX assembly language. The parameters for this paper are the compression result, the power consumption, and ISSN : 2355-9365 e-Proceeding of Engineering : Vol.6, No.2 Agustus 2019 | Page 3542 the speed of simulation. The completion of this thesis uses several methodologies, such as literature study, designing the system, and simulation.
Pengujian Performansi Keamanan Wireless Lan Menggunakan Wireless Intrusion Detection System Iqbal Firda Rusdiansyah; Sofia Naning Hertiana; Ridha Muldina Negara
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Perkembangan jaringan internet yang semakin pesat dan besar mendorong peningkatan penggunaan jaringan Wireless Local Area Network (WLAN) sebagai gateway bagi endpoint device untuk mengakses jaringan internet. WLAN memiliki kelebihan yakni memiliki kecepatan transfer data tinggi, praktis digunakan, dan fleksibel karena menggunakan media transmisi gelombang radio untuk terhubung dengan user. Namun karena transmisi paket dilakukan secara terbuka membuat jaringan WLAN lebih rentan terhadap pencurian data dan serangan cybers. Untuk mengamankan jaringan WLAN terdapat sistem keamanan yang sudah mumpuni yakni Wireless Intrusion detection system (WIDS). WIDS memiliki prinsip yang sama dengan IDS namun dikhususkan untuk melindungi jaringan WLAN dari serangan. Sehingga WIDS cocok dipasangkan pada jaringan WLAN karena dapat mendeteksi serangan di udara sehingga admin jaringan dapat melakukan tindakan sebelum serangan merusak komponen penting yakni server, access point, dan client. Dalam tugas akhir ini, sistem keamanan WIDS akan dipasangkan pada jaringan WLAN yang dijalankan menggunakan emulator Mininet-Wifi. Sistem yang telah dibuat diuji menggunakan serangan yang khusus ditujukan untuk jaringan WLAN (WEP, WPA, WPA2 Cracking; Denial of Service; dan Evil-Twin) dan diuji performansi QoS-nya saat sebelum dan setelah dipasang WIDS dan saat dijalankan dengan trafik video dan VoIP dengan bacgkround traffic 10 Mbps hingga 58 Mbps. Hasilnya sistem dapat mendeteksi serangan WEP, WPA, dan WPA2 Cracking; dan Denial of Service namun tidak dapat menentukan sumber serangan dengan tepat (false positive). Untuk serangan Evil-Twin dapat dideteksi dengan baik oleh sistem. Dari uji performansi, didapat hasil pemasangan WIDS hanya berpengaruh terhadap kenaikan delay rata-rata. Begitu juga dengan kondisi background traffic yang berbeda hanya terjadi peningkatan secara linear pada delay rata-rata. Untuk jitter throughput, dan packet loss cenderung stabil dari hasil dua uji performansi yang dilakukan. Kata Kunci : WLAN, WIDS, access point. Abstract The development of increasingly fast and large internet networks has encouraged an increase in the use of Wireless Local Area Network (WLAN) networks as a gateway for device endpoints to access internet networks. WLAN has the advantage of having high data transfer speeds, practical use, and flexibility because it uses radio wave transmission media to connect with users. However, because packet transmission is carried out openly, making WLAN networks more vulnerable to data theft and attack by cybers. To secure the WLAN network, there is a security system that is qualified, namely the Wireless Intrusion detection system (WIDS). WIDS has the same principles as IDS but is specifically intended to protect WLAN networks from attacks. So that WIDS is suitable to be installed on a WLAN network because it can detect attacks in the air so the network admin can take action before the attack damages important components, namely the server, access point, and client. In this final project, the WIDS security system will be installed on a WLAN network that is run using the Mininet-Wifi emulator. Systems that have been made are tested using attacks specifically intended for WLAN networks (WEP, WPA, WPA2 Cracking; Denial of Service; and Evil-Twin) and QoS performance is tested before and after WIDS is installed and when run with video and VoIP traffic with backround traffic of 10 Mbps to 58 Mbps. The result is that the system ISSN : 2355-9365 e-Proceeding of Engineering : Vol.6, No.2 Agustus 2019 | Page 4401 2 can detect WEP, WPA, and WPA2 Cracking attacks; and Denial of Service but cannot determine the source of the attack correctly (false positive). Evil-Twin attacks can be detected properly by the system. From the performance test, it was found that the WIDS installation results only affected the increase in average delay. Likewise, with different background traffic conditions there is only a linear increase in average delay. For jitter throughput, and packet loss tend to be stable from the results of two performance tests performed. Keywords : WLAN, WIDS, access point.
Studi Interferensi Antara Future Railway Mobile Communication Systems (frmcs) Dan Gsm Seluler Di Indonesia Abdul Khamid Ridwanuddin; Khoirul Anwar; Ahmad Sugiana
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Tim sistem pensinyalan kereta di dunia sedang mengembangkan beberapa teknologi untuk kereta cepat, salah satunya adalah teknologi Future Railway Mobile Communication Systems (FRMCS) yang akan diterapkan di dunia pada 2022. Jurnal ini melakukan studi FRMCS untuk kereta cepat Indonesia dan peluang terkenanya interferensi oleh Global System for Mobile Communication (GSM) seluler yang telah ada karena penggunaan band frekuensi yang sama atau berdekatan. Jurnal ini mengevaluasi kinerja FRMCS di Indonesia tanpa dan dengan interferensi dari GSM seluler. Interferensi yang muncul dianalisis dengan Bit Error Rate (BER) terhadap Signal to Noise Ratio (SNR) untuk kurva kereta. Evaluasi dilakukan pada model kanal FRMCS Indonesia yang didapatkan dari New York University Simulation (NYUSIM) dengan outage probability yang akan berfungsi sebagai kinerja BER lower bound (terbaik). Hasil dari Jurnal ini adalah kinerja FRMCS Indonesia dengan dan tanpa interferensi oleh GSM seluler terhadap sinyal FRMCS di sepanjang rel kereta di Indonesia, berupa (i) kurva BER antara kinerja FRMCS dan kinerja Global System for Mobile Communication-Railway (GSM-R), serta (ii) kurva jarak aman antara rel kereta FRMCS dengan base station sistem komunikasi seluler. Hasil Jurnal ini menunjukkan bahwa kinerja FRMCS memiliki kinerja yang lebih baik dibandingkan dengan kinerja GSM-R dalam aspek ketahanan terhadap interferensi. Hasil Jurnal ini diharapkan dapat menjadi rujukan implementasi FRMCS di Indonesia. Kata kunci: interference, FRMCS, GSM-R, BER, NYUSIM Abstract The train signaling system team in the world is developing several technologies for fast trains, one of which is the technology of Future Railway Mobile Communication Systems (FRMCS) which will be implemented in the world in 2022. This journal conducts FRMCS studies for Indonesian fast trains and the chance of interference by Global System for Mobile Communication (GSM) cellular that already exists because of the use of the same or adjacent frequency bands. This journal evaluates the performance of FRMCS in Indonesia without and with interference from GSM cellular. The emerging interference is analyzed by the Bit Error Rate (BER) against Signal to Noise Ratio (SNR) for the train curve. Evaluations were carried out on the Indonesian FRMCS channel model obtained from New York University Simulation (NYUSIM) with probability outage that would function as a lower bound BER performance. The results of this Journal are the performance of FRMCS Indonesia with and without interference from GSM cellular to FRMCS signals along railroads in Indonesia, in the form of (i) BER curve of FRMCS performance and Global System for Mobile Communication-Railway GSM-R performances, and (ii) a safe distance curve between the FRMCS railroad and the cellularbase station communication system. The result of this journal shows that the performance of FRMCS is better than GSM-R in the aspect of resistance to interference. The results of this Journal are expected to be a reference for the implementation of FRMCS in Indonesia. Keywords: interference, FRMCS, GSM-R, BER, NYUSIM
Penerapan Pendingin Termoelektrik Pada Kondensor Dimroth Berpendingin Air Berbasis Kendali Pi Mochamad Roffa Firdaus; Tri Ayodha Ajiwiguna; Asep Suhendi
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Pada penelitian ini akan dibuat sistem pendingin kondensor dimroth berpendingin air berbasis termoelektrik dengan menggunakan metode PI untuk pengontrolan suhu padareaktor. Metode PI merupakan metode kontrol dimana sinyal feedback didapat dari sensordengan terus menghitung nilai error sebagai beda antara nilai setpoint. Sensor yangdigunakan adalah sensor suhu termokopel yang digabungkan dengan IC MAX6675, Sensorsuhu termokopel digunakan untuk feedback control sebagai pembanding dengan nilaisetpoint untuk mengontrol daya yang diberikan pada termoelektrik dengan pengaturanPWM oleh Arduino (mikrokontroler) sehingga suhu yang diinginkan dapat dicapai.Terdapat empat variasi setpoint yaitu 13°C, 15°C dan 17°C, untuk menentukan parameterkontrol yang tepat dilakukan dengan menggunakan 2 buah metode yaitu metode ZieglerNichols 1 dan metode Trial and Error. Pengujian dilakukan dengan mengambil datapenurunan suhu lalu data hasil penurunan suhu dianalisis untuk mendapat spesifikasirespon sistem.Kata kunci : Termoelektrik, PWM, PI, Kontrol, Ziegler Nichols 1, Trial and error.Abstract in this research will be made a water cooled dimroth condenser cooling system based onthermoelectric using PI methode to control the temperature of the reactor. The PI method isa control method where the feedback signal is obtained from the sensor by continuouslycalculating the error value as the difference between the setpoint values. The sensor used is athermocouple temperature sensor combined with IC MAX6675, the thermocoupletemperature sensor is used for feedback control as a comparison with the setpoint value tocontrol the power given to the thermoelectric with PWM settings by Arduino(microcontroller) so that the desired temperature can be achieved. There are four setpointvariations, namely 13 ° C, 15 ° C and 17 ° C, to determine the appropriate controlparameters by using 2 methods, namely Ziegler Nichols 1 method and Trial and Error method. Tests are carried out by taking down the temperature data then the temperature reduction data is analyzed to get the system response specifications. Keywords: Thermoeletric, PWM,Thermocouple, PI, Control, Ziegler Nichols 1, Trial anderror, cooling system.
nalisis Dan Perancangan Arsitektur Satu Data Pada Fungsi Umum Menggunakan Togaf Adm Di Pemerintah Daerah Provinsi Jawa Barat Nur Fitriyani; Irfan Darmawan; Ridha Hanafi
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Satu Data digunakan untuk mendorong pengambilan kebijakakn berdasarkan data. Di era globalisasi sekarang ini, sebuah organisasi harus mampu menyesuaikan diri terhadap perkembangan teknologi informasi yang semakin pesat, sudah merupakan hal yang sangat lumrah karena dengan menggunakan teknologi informasi dapat membantu menunjang aktivitas bisnis pada instansi. Dalam menjalankan aktivitas bisnisnya, Pemerintah Daerah Provinsi Jawa Barat sedang melakukan pembangunan terhadap sistem satu data. .Dibutuhkan perancangan EA dengan menggunakan motede TOGAF ADM framework sebagai panduan untuk pembuatan perancangan. Enterprise Architecture dimulai dari fase preliminary hingga fase technology. Hasil dari penelitian berupa artefak dari rancangan arsitektur bisnis sampai teknologi informasi saat ini beserta usulan untuk melakukan perbaikan terutama pada fungsi umum. Kata kunci : Enterprise Architecture, TOGAF ADM, Satu Data, Pemerintah Daerah Provinsi Jawa Barat Abstract One Data is to encourage policy making base on the data. In the globalization era nowadays, company should be able to adapt towards fast information technology evolution, has been being common things because using information technology could support the company’s business activities. In running the business activities, Pemerintah Daerah Provinsi Jawa Barat are doing development of the One System. EA design is needed by using the motive TOGAF ADM framework as a guide for designing. Enterprise Architecture starts from the preliminary phase until the technology phase. The results of the research are in the form of a artifact from the design of business architecture to current information technology along with proposals to make improvements, especially in the common function. Keywords: One Data, Enterprise Architecture (EA), TOGAF ADM
Antena Array 6 × 2 Dengan Penambahan Pertubasi Dan Pengaturan Distribusi Daya Pada Saluran Transmisi Paralel Untuk Aplikasi Medium Power Radar S Band Hafshin Habibie Tanjung; Levy Olivia Nur; Yussi Perdana Saputera
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Salah satu cara untuk meningkatkan kemampuan aparat pemerintah dalam mengawasi dan mengamankan wilayah perairan NKRI adalah radar pengawas pantai. Radar ini digunakan untuk mengawasi kapal-kapal laut sehingga dapat mencegah tindakan-tindakan yang merugikan NKRI. Radar pengawas pantai di Indonesia masih terbilang sedikit dikarenakan besarnya biaya untuk memenuhi kebutuhan radar. Medium Power Radar (MPR) adalah salah satu radar yang bekerja untuk pengawas pantai. MPR bekerja pada frekuensi S-Band sebesar 3 GHz dan memiliki spesifikasi seperti bandwitdh 50 MHz, Gain 10 dBi, daya 20 Mw dan polarisasinya linear.Pada penelitian ini dilakukan simulasi dan realisasi antena yang akan bekerja pada Medium Power Radar (MPR) S-Band. Simulasi antena menggunakan software CST Microwave Studio. Perancangan antena ini menggunakan antena mikrostrip yang memiliki lapisan patch, substrat dan ground. Dan bahan yang digunakan pada substrat adalah FR4 Epoxy. Pada perancangan dilakukan penambahan pertubasi, yaitu teknik pemotongan pada ujung sisis-sisi patch antena secara diagonal. Pertubasi dilakukan bertujuan untuk merubah arah polarisasi dan meningkatkan Gain pada antena. Pada tugas akhir ini menghasiilkan antena array 6×2 yang disusun secara paralel dengan satu sumber catuan. Penambahan array dilakukan untuk memperbesar nilai Gain dan terkoreksinya digram arah dan fasa pada antena. Antena yang dihasilkan dapat bekerja pada rentang frekuensi center 3 GHz, yang sudah sesuai dengan frekuensi S-Band. Dan memiliki hasil nilai VSWR 1,07, Return loss -29,51, Gain 10,304. Antena juga memiliki polarisasi elips yang mendekati sirkular dan polaradiasi omnidireksional. Dari hasil nilai yang dimiliki pada perancangan antena sudah memenuhi spesifikasi antena yang bekerja pada Medium Power Radar (MPR).Kata Kunci : MPR, Radar, Antena, VSWR Abstract One way to improve the ability of government officials to monitor and secure the territorial waters of the Republic of Indonesia is the coast surveillance radar. This radar is used to monitor marine vessels so as to prevent actions that are detrimental to the Republic of Indonesia. Radar watchdog coast in Indonesia is still relatively small due to the large cost to meet radar needs. Medium Power Radar (MPR) is one of the radars that works for coast watchers. MPR works at S-Band frequency of 3 GHz and has specifications such as 50 MHz bandwidth, 10 dBi gain, 20 Mw power and linear polarization. In this study the simulation and realization of the antenna will work on the S-Band Medium Power Radar (MPR). Antenna simulation using CST Microwave Studio software. The design of this antenna uses a microstrip antenna that has patch, substrate and ground layers. And the material used on the substrate is FR4 Epoxy. In the design of the addition of pertubation, the cutting technique at the edges of the patch antenna sides diagonally. Pertubasi carried out aims to change the direction of polarization and increase the gain on the antenna. In this final project produces a 6 × 2 array antenna arranged in parallel with one source of supply. The addition of arrays is done to increase the Gain value and correct the direction and phase diagrams in the antenna. The resulting antenna can work in the center frequency range of 3 GHZ, which is in accordance with the S-Band frequency. And it has a VSWR value of 1.07, Return loss of -29.51, Gain of 10.304. Antennas also have elliptical polarization that is close to circular and omnidirectional polaradiation. From the results obtained in the design of the antenna already meets the specifications of the antenna that works on Medium Power Radar (MPR). Keywords: MPR, Radar, Antena, VSWR

Filter by Year

2014 2025


Filter By Issues
All Issue Vol. 12 No. 6 (2025): Desember 2025 Vol. 12 No. 5 (2025): Oktober 2025 Vol. 12 No. 4 (2025): Agustus 2025 Vol. 12 No. 3 (2025): Juni 2025 Vol. 12 No. 2 (2025): April 2025 Vol. 12 No. 1 (2025): Februari 2025 Vol. 11 No. 6 (2024): Desember 2024 Vol. 11 No. 5 (2024): Oktober 2024 Vol. 11 No. 4 (2024): Agustus 2024 Vol. 11 No. 3 (2024): Juni 2024 Vol. 11 No. 2 (2024): April 2024 Vol. 11 No. 1 (2024): Februari 2024 Vol. 10 No. 6 (2023): Desember 2023 Vol. 10 No. 5 (2023): Oktober 2023 Vol 10, No 5 (2023): Oktober 2023 Vol. 10 No. 4 (2023): Agustus 2023 Vol. 10 No. 3 (2023): Juni 2023 Vol 10, No 3 (2023): Juni 2023 Vol 10, No 2 (2023): April 2023 Vol. 10 No. 2 (2023): April 2023 Vol. 10 No. 1 (2023): Februari 2023 Vol 9, No 6 (2022): Desember 2022 Vol. 9 No. 5 (2022): Oktober 2022 Vol 9, No 5 (2022): Oktober 2022 Vol 9, No 4 (2022): Agustus 2022 Vol. 9 No. 4 (2022): Agustus 2022 Vol 9, No 3 (2022): Juni 2022 Vol 9, No 2 (2022): April 2022 Vol 9, No 1 (2022): Februari 2022 Vol 8, No 6 (2021): Desember 2021 Vol. 8 No. 5 (2021): Oktober 2021 Vol 8, No 5 (2021): Oktober 2021 Vol 8, No 4 (2021): Agustus 2021 Vol 8, No 3 (2021): Juni 2021 Vol. 8 No. 2 (2021): April 2021 Vol 8, No 2 (2021): April 2021 Vol 8, No 1 (2021): Februari 2021 Vol 7, No 3 (2020): Desember 2020 Vol 7, No 2 (2020): Agustus 2020 Vol 7, No 1 (2020): April 2020 Vol 6, No 3 (2019): Desember 2019 Vol 6, No 2 (2019): Agustus 2019 Vol 6, No 1 (2019): April 2019 Vol 5, No 3 (2018): Desember 2018 Vol 5, No 2 (2018): Agustus 2018 Vol 5, No 1 (2018): April 2018 Vol 4, No 3 (2017): Desember, 2017 Vol 4, No 2 (2017): Agustus, 2017 Vol 4, No 1 (2017): April, 2017 Vol 3, No 3 (2016): Desember, 2016 Vol 3, No 2 (2016): Agustus, 2016 Vol 3, No 1 (2016): April, 2016 Vol 2, No 3 (2015): Desember, 2015 Vol 2, No 2 (2015): Agustus, 2015 Vol 2, No 1 (2015): April, 2015 Vol 1, No 1 (2014): Desember, 2014 More Issue