cover
Contact Name
Yudhi Nugroho Adi
Contact Email
library@tekomuniversity.ac.id
Phone
+628128000110
Journal Mail Official
library@telkomuniversity.ac.id
Editorial Address
Jl. Telekomunikasi - Ters. Buah Batu Bandung 40257 Indonesia
Location
Kota bandung,
Jawa barat
INDONESIA
eProceedings of Engineering
Published by Universitas Telkom
ISSN : 23559365     EISSN : -     DOI : https://doi.org/10.34818/eoe.v9i5.18452
Merupakan media publikasi karya ilmiah lulusan Universitas Telkom yang berisi tentang kajian teknik. Karya Tulis ilmiah yang diunggah akan melalui prosedur pemeriksaan (reviewer) dan approval pembimbing terkait.
Articles 8,304 Documents
Perancangan Dan Pembuatan Mesin Pengupas Kulit Ari Kelapa Berdasarkan Metode Reverse Engineering Yang Diimplentasikan Menggunakan Simulasi Finite Element Method Berbasis Arduino Indira Savitri; Agus Kusnayat; Sri Martini
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dengan parameter utama yang mempengaruhi hasil pengupsan dengan 2D UVAT adalah speed, depth of cut, feed rate perancangan mesin perbaikan dilakukan berdasarkan metode Reverse Engineering lalu desian terpilihakan disimulasikan menggunakan metode Finite Element Method .Finite element method merupakan suatu metode teknik numerik yang paling banyak digunakan dalam proses permesinan. Prinsip dasar metode elemen hingga adalah melakukan penggantian sebuah kontinum oleh unsur-unsur terbatas yang membentuk mesh. Masing-masing geometri disederhakan dalam elemen hingga untuk memudahkan analisis struktur yang sebenarnya. Tujuan dari kajian ini adalah menghitung lifetime dan hasil pengupasan pada perbaikan mesin pengupasan kulit ari kelapa tersebut. Kata kunci: Reversse engineering, Finite element method, pre-processing, processing, post- processing, 2D UVAT, lifetime dan hasil
Analisis Perbandingan Jumlah Led Dengan Mengukur Performa Pada Sistem Vlc Fahira Indriyana; Akhmad Hambali; Brian Pamukti
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abtsrak Tugas Akhir ini melakukan studi tentang teknologi Visible Light Communication (VLC). Dalam Tugas Akhir ini, membandingkan penggunaan jumlah lampu sebanyak 1, 2 dan 3 buah lampu LED dengan menggunakan optical concentrator dan tanpa optical concentrator pada sistem VLC. Teknologi jaringan nirkabel (wireless) terus berkembang dengan menggunakan LED sebagai sarana pengirim informasi dalam ruangan. Konstribusi Tugas Akhir ini signifikan karena performasi pada penggunaan jumlah LED dengan performa sistem VLC relatif memenuhi. Dan penggunaan 1, 2 dan 3 buah lampu menggunakan optical concentrator yang memenuhi yaitu 1 buah lampu sebesar 8,7 × 10−3 mW, jarak sejauh 3,83 m dan posisi sudut receiver sebesar 55,87° dengan menggunakan optical concentrator. Kata Kunci: VLC, LED, BER, OOK-NRZ, Optical Concentrator, Photodioda Abstract The final Project study about Visible Light Communication (VLC) technology. This project compare the utilization of number of LED light's as much as 1, 2, and 3 lights by using optical concentrator and without optical concentrator at VLC system. Wireless network technology develop by using LED as an information transmiter in a room continuously. This final project has a significant contribution because the performance of utilization of number of LED with performance of VLC system are qualified relatively. Then the utilization of 1, 2, and 3 lights by using optical concentrator that qualified is a system that used one light with power receiver (Prx) as 8,7× 10 -3 mW, with distance as 3,83 m and the position of receiver angle as 55,87°.
Prototipe Sistem Monitoring Dan Kontrol Lampu Rumah Berbasis Iot (internet Of Things) Muh Ichsan Kamil; Rizki Ardianto Priramadhi; Ig. Prasetya Dwi Wibawa
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Konsumsi listrik pada masyarakat semakin lama semkain besar baik pada sektor rumah tangga, industri dll. Salah satu penyebab meningkatnya konsumsi listrik pada masyarakat adalah penggunaan listrik yang boros atau tidak efektif seperti dibiarkannya lampu tetap menyala di saat tidak diperlukan. Maka dari itu dibutuhkan suatu sistem yang dapat mengatasi masalah tersebut. Pada penelitian tugas akhir ini bertujuan untuk membuat alat yang dapat memonitor maupun mengontrol lampu rumah dari jarak jauh. Alat yang akan diusulkan berupa sebuah prototipe yang terdiri dari dua bagian utama yaitu hardware dan software. Pada bagian hardware akandigunakan dua komponen seperti NodeMCU dan Arduino sebagai modul wifi dan mikrokontroler. Sedangkan pada bagian software akan digunakan Telegram dan Thingspeak sebagai alat untuk membuat aplikasi IoT. Aplikasi tersebut akan menampilkan penggunaan arus, tegangan, dan daya listrik yang terpakai oleh lampu yang sedang digunakan. Hasil yang telah dicapai dalam penelitian tugas akhir ini adalah pembacaan tingkat error sensor arus sebesar 6,19% dengan delay perintah dari aplikasi Telegram selama 25,33 detik dan 24,46 detik untuk menyalakan dan mematikan lampu. Serta tingkat keberhasilan kontrol lampu melalui Telegram sebesar 100%. Kata kunci: Internet Of Things (IoT), NodeMCU, Telegram
Sistem Pendukung Keputusan Untuk Penentuan Lokasi Instalasi Pengolahan Air Limbah Komunal Industri Tekstil Di Sungai Citarum Berbasis Web Siska Febriyanti; Augustina Asih Rumanti; Nurdinintya Athari Supratman
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Sungai Citarum merupakan sungai terpanjang di Jawa Barat. Sungai tersebut berpartisipasi dalam pembangunan perekonomian Indonesia sebesar 20% GDP (Gross Domestic Product). Pada tahun 2018, tim survei penataan ekosistem sungai citarum menemukan 31 pabrik diwilayah Kabupaten Bandung yang membuang limbah hasil produksi langsung ke Sungai Citarum, salah satunya adalah industri tekstil. Dalam proses produksinya para pelaku industri tekstil tersebut menggunakan zat pewarna tekstil yang mengandung senyawa azo dyes. Senyawa tersebut berpotensi menghasilkan senyawa aminobenzen atau anilin yang menyebabkan pencemaran. Kurangnya Instalasi Pengolahan Air Limbah (IPAL) komunal dan lokasi yang tidak tepat merupakan faktor yang menyebabkan pelaku industri tersebut membuang air limbah produksi secara langsung ke dalam Sungai Citarum. Penelitian ini bertujuan mendukung kegiatan pemerintah dalam memperbaiki Sungai Citarum dengan cara merancang Sistem Pendukung Keputusan (SPK) dengan metode Analytical Hierarchy Process (AHP) berbasis website untuk menentukan lokasi yang tepat untuk membangun IPAL komunal.Kata kunci : Sungai Citarum, Industri tekstil, Instalasi Pengolahan Air Limbah (IPAL), Sistem Pendukung Keputusan (SPK), Analytical Hierarchy Process (AHP).Abstract The Citarum River is the longest river in West Java. The river participates in the development of the Indonesian economy by 20% of GDP (Gross Domestic Product). In 2018, the citarum river ecosystem structuring survey team found 31 factories in the Bandung Regency region that dumped the waste produced directly into the Citarum River, one of which was the textile industry. In the production process the textile industry uses textile dyes containing azo dyes. The compound has the potential to produce aminobenzen or aniline which causes pollution. The lack of a communal Waste Water Treatment Plant (IPAL) and improper location is a factor that causes the industry to dispose of production waste water directly into the Citarum River. This study aims to support government activities in improving the Citarum River by designing a Decision Support System (SPK) using a website-based Analytical Hierarchy Process (AHP) method to determine the right location to build a communal WWTPKeywords: Citarum River, Textile Industry, Waste Water Treatment Plant (WWTP), Decision Support System (SPK), Analytical Hierarchy Process (AHP).
Analisis Sentimen Mahasiswa Terhadap Fasilitas Universitas Telkom Menggunakan Metode Jaringan Saraf Tiruan Dan Tf-idf Muhammad Farhan Muzakki; Jondri Jondri; Rian Febrian Umbara
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakKeberadaan kuisioner dapat membantu instansi manapun untuk meningkatkan fasilitas ataupunkinerjanya. Tetapi dengan kuisioner yang berjumlah ratusan bahkan ribuan akan menyulitkan instansiuntuk mengetahui kesimpulan dari seluruh data kuisioner. Data kuisioner yang diambil sebagai acuanyaitu data yang berisi tanggapan positif dan negatif. Oleh karena itu, penelitian ini menganalisis kuisionermengenai fasilitas di Universitas Telkom. Analisis dilakukan dengan melakukan klasifikasi kuisioner yangberisi sentimen mahasiswa tentang fasilitas di Universitas Telkom. Metode klasifikasi yang digunakandalam penelitian ini adalah Jaringan Saraf Tiruan (JST) dengan model Multi Layer Perceptron yangdikombinasikan dengan fitur ekstraksi untuk dapat mendeteksi negasi dan pembobotan menggunakanTerm Frequency – Inverse Document Frequency (TF-IDF). Hasil pengujian pada aplikasi yang dibangunmemperlihatkan bahwa akurasi memberikan tingkat akurasi yang baik hingga 91,23%.Kata kunci: analisis sentimen, jaringan saraf tiruan, multi layer perceptron, TF-IDFAbstractThe existence of a questionnaire can help any agency to improve its facilities or performance. But withhundreds or thousands of questionnaires it will be difficult for agencies to find conclusions from allquestionnaire data. Questionnaire data taken as a reference are data that contain positive, negative, andneutral responses. Therefore, this study tried to analyze the questionnaire regarding facilities at TelkomUniversity. The analysis was carried out by classifying questionnaires containing student sentiments aboutfacilities at Telkom University. The classification method used in this study is Artificial Neural Networks(ANN) with a Multi Layer Perceptron model combined with extraction features to be able to detect negationand weighting using Term Frequency – Inverse Document Frequency (TF-IDF). The test results on theapplications that are built show that accuracy provides a good level of accuracy, and can be implemented.Keywords: sentiment analysis, artificial neural network, multi layer perceptron, TF-IDF
Hibridisasi Algoritma Classification and Regression Tree (CART) dan Artificial Neural Network (ANN) untuk Prediksi Harga Bawang Merah di Kabupaten Bandung Himatul Zulfa; Fhira Nhita; Deni Saepudin
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Bawang merah adalah salah satu jenis tumbuhan hortikultura yang mempunyai banyak manfaat namun kualitas dan kuantitas nya sangat dipengaruhi oleh cuaca. Perubahan cuaca akan menyebabkan produksinya tidak menentu sehingga mengalami fluktuasi harga. Prediksi harga terhadap cuaca ini sangat diperlukan agar mempermudah petani untuk melakukan penanaman pada waktu yang tepat. Oleh sebab itu, penelitian ini memprediksi harga bawang merah di Kabupaten Bandung berdasarkan pengaruh cuaca dengan menggunakan hibridisasi dari Classification and Regression Tree (CART) dan Artificial Neural Network (ANN). Berdasarkan beberapa skenario pengujian dalam penelitian ini, metode hibridisasi CART-ANN terbukti memberikan hasil yang lebih baik daripada CART atau ANN secara konvensional dengan nilai precision, recall, dan akurasi berturut-turut sebesar 90.91%, 100.00%, 93.33%. Kata kunci : Bawang Merah, Classification and Regression Tree, Artificial Neural Network
Desain Jaringan Komunikasi Lte Untuk Penumpang Kereta Cepat 140 Km/jam Jakarta-surabaya Jalur Pekalongan-cepu Nina Karlina; Erna Sri Sugesti; Rina Pudji Astuti
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Kereta Api adalah salah satu moda transportasi yang digemari oleh masyarakat agar terhindar dari kemacetan. Kualitas sinyal yang kurang baik pada jaringan Long Term Evolution (LTE) menjadi salah satu kendala bagi pengguna internet di Kereta Api. Hal ini disebabkan oleh beberapa faktor, salah satunya, yaitu blankspot area yang terjadi pada jalur kereta Pekalongan-Cepu. Untuk mengatasi masalah tersebut, penelitian ini melakukan perancangan jaringan microcell dengan mempertimbangkan coverage, capaciy, kecepatan, dan throughput sehingga overlapping coverage agar handover dapat berjalan dengan baik dan mampu mendukung komunikasi LTE dengan kecepatan kereta 140 km/jam.Tugas Akhir ini menggunakan software perancangan jaringan dan simulator delay. Usulan perancangan jaringan LTE ini adalah menambahkan Remote Radio Unit (RRU) di sepanjang jalur kereta cepat Pekalongan-Cepu dengan memperhatikan jaringan site existing operator Telkomsel. Tugas Akhir ini menemukan jumlah RRU baru sebanyak 35 site harus ditambahkan. Hasil kelayakan signal didapat dari parameter sesuai standar Key Performance Indicator (KPI) operator Telkomsel, dengan nilai rata-rata Reference Signal Received Power (RSRP) -60,87 dBm ≥ −85 dBm, Signal to Interference Noise Ratio (SINR) 10,02 dB ≤ SINR < 10 dB, dan nilai Throughput 26.929,01 kbps ≥ 12.000 kbps. Hasil simulasi menggunakan simulator delay menghasilkan delay trafik di saat kecepatan 140 km/jam sebesar 19,17 ms dan delay handover sebesar 20 ms. Dengan delay tersebut menghasilkan nilai overlapping coverage sebesar 41% dari radius sel. Kata kunci: Delay handover, LTE, RRU, Delay trafik, Overlapping Abstract Train is one of the type of public transportation to avoid traffic jam. By using trains, the poor quality of Long Term Evolution (LTE) network becomes one of the problems for internet user in trains. This caused by several factors, one of them is blankspot area in Pekalongan-Cepu train line. To resolve this problem, this research is designs a microcell network by considering coverage, capacity, speed, and throughput for overlapping coverage. So that, the submission run well and is able to support LTE communication with a train speed of 140 km/hour. This Final Project uses network design software and delay simulators. The design of the LTE network added the Remote Radio Unit (RRU) along the Pekalongan-Cepu high speed railway with due regard to the existing Telkomsel operator network sites. This Final Project finds that the number of new RRUs of 35 sites must be added. The results of signal feasibility are obtained from parameters according to the standard of the Main Performance Indicator (KPI) of Telkomsel, with an average value of -60.87 dBm Reference Signal Received Power (RSRP) ≥ -85 dBm, Signal to Interference Noise Ratio (SINR) 10.02 dB ≤ SINR <10 dB, and Throughput value 26.929,01 kbps ≥12,000 kbps. The simulation results using the delay simulator generate traffic at a speed of 140 km / h at 19.17 ms and the delay in handover is 20 ms. Delay results in an overlapping coverage value of 41% of the cell radius. Keyword: Delay handover, LTE, RRU, Traffic delay, Overlapping
Sistem Ir-uwb Wban Untuk Monitoring Aplikasi Kesehatan Hafizah Delliya Suherman; Miftadi Sudjai; Trasma Yunita
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Teknologi wireless body area networks (WBAN) merupakan perkembangan dari konsep PAN yang mampu memberikan kemampuan terbentuknya jaringan dipermukaan tubuh manusia yang terintegrasi dengan jaringan disekitarnya. Selain itu perkembangan elektronika semakin memberikan pengaruh untuk pembentukan smart aplikasi dengan desain yang compact dan bisa diletakkan di atas tubuh maupun diimplan ke tubuh manusia. Kemampuan signal processing serta complex BANs tentunya sangat dibutuhkan untuk membentuk suatu kesatuan fungsionalitas yang menghasilkan aplikasi yang bermanfaat.Teknik yang digunakan dalam penelitian tugas akhir ini adalah Impulse Radio Ultra Wide Band Wireless Body Area Network ( IR-UWB WBAN ) yang merupakan jenis pensinyalan UWB menggunakan pulsa baseband sangat pendek, biasanya dalam nano detik. Teknik IR-UWB WBAN bertujuan untuk penginderaan nirkabel berdasarkan teknologi UWB. frekuensi yang digunakan 3,1 GHz- 10,6 GHz, kanal 802.15.6 dan bandwidth 500 MHz sesuai IEEE. Kanal yang digunakan dalam penelitian ini menggunakan Channel CM4, CM4 adalah pengukuran antena Tx yang berada dipermukaan tubuh sedangkan antena Rx ditempatkan pada luar tubuh dan bervariasi untuk posisi yang berbeda. Data yang dihasilkan akan menggunakan software simulasinya. Pada penelitian tugas akhir ini dilakukan analisis sistem IR-UWB WBAN untuk monitoring aplikasi kesehatan. Dengan menggunakan modulasi Binary Phase Shift Keying (BPSK), Pulse Posision Modulation (PPM), dan Gaussian Monocyle serta menggunakan kanal CM4 dan Awgn. Oleh karena itu didapat hasil performansi nilai Bit Error Rade (BER) terhadap Signal to Noise Rasio (SNR) dalam setiap body direction 1 – body direction 4. BER yang dicapai bernilai 10#$ pada SNR 1-7 dB. Untuk body direction 1 didapat ber 10#$ dengan SNR 1-4 dB, untuk body direction 2 didapat BER 10#$ dengan SNR 1- 5 dB, sedangakan untuk body direction 3 didapat BER 10#$ dengan SNR 1-7 dB, dan untuk body direction 4 didapat BER 10#$ dengan SNR 1-6 dB. Dan dengan menggunakan Teknik IR-UWB WBAN bisa mendapatkan hasil analisis performansi untuk WBAN. Kata kunci : WBAN, IR-UWB, SOFTWARE, BER, SNR Abstract Wireless body area networks (WBAN) technology is a development of the PAN concept that is able to provide the ability to form a network on the surface of the human body that is integrated with the surrounding issue. In addition, the development of electronics is increasingly influencing the formation of smart applications with designs that are compact and can be placed on the body or implanted into the human body. The ability of signal processing and complex BANs is certainly very needed to form a unity of functionality that produces useful applications.The technique used in this final project research is Impulse Radio Ultra Wide Band Wireless Body Area Network (IRUWB WBAN) which is a type of UWB signaling using very short baseband pulses, usually in nano seconds. WBAN IR-UWB technique aims for wireless sensing based on UWB technology. the frequency used is 3.1 GHz-10.6 GHz, 802.15.6 channel and 500 MHz bandwidth according to IEEE. The canal used in this study uses Channel CM4, CM4 is a measurement of the Tx antenna that is on the surface of the body while the Rx antenna is placed outside the body and varies for different positions. The data generated will use the simulation software. In this final project, an analysis of the IR-UWB WBAN system for monitoring health applications. By using Binary Phase Shift Keying (BPSK) modulation, Pulse Posision Modulation (PPM), and Gaussian Monocyle and using Cm4 channels and Awgn. Therefore, the results of the ISSN : 2355-9365 e-Proceeding of Engineering : Vol.6, No.2 Agustus 2019 | Page 4808 2 Bit Error Rade (BER) result are obtained against Signal to Noise Ratio (SNR) in each body direction 1 - body direction 4. The achieved value is 10#$ in Snr 1-7 dB. For body direction 1, there are 10#$ with Snr 1-4 dB, for body direction 2, Ber 10#$ with Snr 1- 5 dB, while for body direction 3, Ber 10#$ with Snr 1-7 dB, and for body direction 4 obtained Ber 10#$ with Snr 1-6 dB. And by using the WBAN IR-UWB Technique you can get the results of performance analysis for WBAN. Keywords: WBAN, IR-UWB, SOFTWARE, BER, SNR
Analisis Pemilihan Alternatif Penggantian Fasilitas Usaha Pada Startup Persewaan Bus Pariwisata Po. Xyz Menggunakan Metode Incremental Analysis Nugita Arlendatama; Endang Chumaidiyah; Sinta Aryani
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PO. XYZ merupakan salah satu perusahaan startup yang bergerak dalam bidang persewaan bus pariwisata yang berlokasi di Sukoharjo yang menawarkan jasa persewaan bus pariwisata. Dalam menjalakan usahanya PO. XYZ saat ini memiliki tiga armada bus dan salah satunya adalah Mercedes Benz OH 1526 tahun 1997. Armada tersebut merupakan armada tertua yang dimiliki PO. XYZ. Setelah dilakukan wawancara, pemilik berencana mengganti bus tersebut. Namun, dikarenakan biaya yang dikeluarkan cukup besar untuk membeli sebuah bus, maka pemilik memiliki pilihan untuk melakukan penggantian yaitu menjalankan yang sudah ada, membeli bus bekas atau bus baru. Maka dari itu dilakukan analisis pemilihan alternatif keputusan untuk pengadaan fasilitas usaha PO. XYZ dengan metode Incremental Analysis. Dilakuakan analisis kelayakan untuk masing-masing alternatif berdasarkan aspek pasar, aspek teknis, dan aspek finansial. Analisis kelayakan yang dilakukan mendapatkan hasil bahwa ketiga alternatif dinyatakan layak dengan NPV masing-masing sebesar Rp1.231.430.826, Rp2.533.556.057, dan Rp3.679.489.847. Dengan PBP sebesar 3,6 tahun , 2,6 tahun, dan 2,5 tahun dan nilai IRR sebesar 39%, 51%, dan 52%. Kemudian dilakukan perhitungan Incremental Alaysis dengan menghitung niai IRR dari selisih net cash antara ketiga alternatif dan mendapatkan nilai ΔIRR sebesar 50% dan 63%, dikarenakan ΔIRR< MARR (17,5%), maka alternatif yang dipilih adalah alternatif terbesar, yaitu pengganti bus baru. Kata Kunci: Analisis Incremental, Analisis Kelayakan, NPV, IRR, PBP Abstract PO. XYZ is one of the startup companies engaged in the tourism bus rental located in Sukoharjo that offers tourist bus rental services. In conducting its business PO. XYZ currently has three bus fleet and one of them is Mercedes Benz OH 1526 year 1997. It is the oldest fleet owned by the PO. XYZ. After the interview, the owner plans to replace the bus. However, because the cost is large enough to buy a bus, the owner has the option to make a replacement that is running the existing, buy a new bus or bus. Hence the analysis of the alternative election decision to the procurement of business facilities PO. XYZ with the Incremental Analysis method. The feasibility analysis for each alternative based on market aspect, technical aspect, and financial aspect. Feasibility analysis is done to get the result that the three alternatives are considered worthy with NPV respectively amounting to Rp 1.149.149.836, Rp 2.533.556.057, and Rp 3.679.489.847. With the PBP of 3.4 years, 2.6 years, and 2.5 years and an IRR value of 38%, 51%, and 52%. Then carried out Incremental Alaysis calculations by calculating IRR Niai from the net cash difference between the three alternatives and obtaining ΔIRR value of 50% and 63%, due to ΔIRR < MARR (17.5%), then the chosen alternative is an alternative Replacement of the new bus. Keywords: Incremental analysis, feasibility analysis, NPV, IRR, PBP
Implementasi Sistem Keamanan Ruangan Menggunakan Rfid Dan Panel Virtual Berbasis Iot Hafizha Akbar Disash Putranto; Agung Nugroho Jati; Muhammad Faris Ruriawan
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Keyless Sistem adalah suatu teknolgi kontrol akses pada suatu objek tertentu, tanpa menggunakan kunci atau bisa disebut dengan sistem kunci elektrik, salah satu contohnya adalah kontrol akses pada ruangan berbasis RFID, dimana hanya user yang memiliki tag ID dan sudah terdaftar pada sistem saja yang bisa memiliki hak akses ke ruangan tersebut. Pada penelitian ini akan dibuat suatu rancangan sistem RFID dengan nama Ykeyless dimana sistem tersebut memiliki fitur display informasi tentang keberadaan dan jumlah user yang berada di dalam ruangan, memberikan akses kepada orang lain yang tidak memiliki akses untuk masuk ke ruangan dengan cara request meeting kepada user yang berada diruangan dan memiliki fitur aplikasi pada handphone untuk melihat data log user yang sedang berada di ruangan. Dengan adanya sistem Ykeyless yang dibuat pada penelitian ini diharapkan sistem Ykeyless ini tidak hanya menjadi sistem keamanan ruangan saja, namun dengan sistem Ykeyless ini akan membantu mempermudah orang lain dengan beberapa fitur yang dimilikinya, seperti display yang memberikan informasi tentang user siapa saja yang berada di dalam ruangan, serta bila ada orang yang tidak memiliki akses masuk namun mereka ingin masuk keruangan tersebut untuk bertemu dengan user yang berada di dalam ruangan dapat mengirim request masuk kepada user yang berada di dalam ruangan. Serta user dapat memantau user lain yang berada di dalam ruangan dari jarak jauh menggunakan aplikasi pada handphone. Kata Kunci : keyless, RFID

Filter by Year

2014 2025


Filter By Issues
All Issue Vol. 12 No. 6 (2025): Desember 2025 Vol. 12 No. 5 (2025): Oktober 2025 Vol. 12 No. 4 (2025): Agustus 2025 Vol. 12 No. 3 (2025): Juni 2025 Vol. 12 No. 2 (2025): April 2025 Vol. 12 No. 1 (2025): Februari 2025 Vol. 11 No. 6 (2024): Desember 2024 Vol. 11 No. 5 (2024): Oktober 2024 Vol. 11 No. 4 (2024): Agustus 2024 Vol. 11 No. 3 (2024): Juni 2024 Vol. 11 No. 2 (2024): April 2024 Vol. 11 No. 1 (2024): Februari 2024 Vol. 10 No. 6 (2023): Desember 2023 Vol 10, No 5 (2023): Oktober 2023 Vol. 10 No. 5 (2023): Oktober 2023 Vol. 10 No. 4 (2023): Agustus 2023 Vol 10, No 3 (2023): Juni 2023 Vol. 10 No. 3 (2023): Juni 2023 Vol. 10 No. 2 (2023): April 2023 Vol 10, No 2 (2023): April 2023 Vol. 10 No. 1 (2023): Februari 2023 Vol 9, No 6 (2022): Desember 2022 Vol. 9 No. 5 (2022): Oktober 2022 Vol 9, No 5 (2022): Oktober 2022 Vol. 9 No. 4 (2022): Agustus 2022 Vol 9, No 4 (2022): Agustus 2022 Vol 9, No 3 (2022): Juni 2022 Vol 9, No 2 (2022): April 2022 Vol 9, No 1 (2022): Februari 2022 Vol 8, No 6 (2021): Desember 2021 Vol. 8 No. 5 (2021): Oktober 2021 Vol 8, No 5 (2021): Oktober 2021 Vol 8, No 4 (2021): Agustus 2021 Vol 8, No 3 (2021): Juni 2021 Vol. 8 No. 2 (2021): April 2021 Vol 8, No 2 (2021): April 2021 Vol 8, No 1 (2021): Februari 2021 Vol 7, No 3 (2020): Desember 2020 Vol 7, No 2 (2020): Agustus 2020 Vol 7, No 1 (2020): April 2020 Vol 6, No 3 (2019): Desember 2019 Vol 6, No 2 (2019): Agustus 2019 Vol 6, No 1 (2019): April 2019 Vol 5, No 3 (2018): Desember 2018 Vol 5, No 2 (2018): Agustus 2018 Vol 5, No 1 (2018): April 2018 Vol 4, No 3 (2017): Desember, 2017 Vol 4, No 2 (2017): Agustus, 2017 Vol 4, No 1 (2017): April, 2017 Vol 3, No 3 (2016): Desember, 2016 Vol 3, No 2 (2016): Agustus, 2016 Vol 3, No 1 (2016): April, 2016 Vol 2, No 3 (2015): Desember, 2015 Vol 2, No 2 (2015): Agustus, 2015 Vol 2, No 1 (2015): April, 2015 Vol 1, No 1 (2014): Desember, 2014 More Issue