cover
Contact Name
Ayu Herzanita Yufrizal
Contact Email
ayu.herzanita@univpancasila.ac.id
Phone
+6221-7864730
Journal Mail Official
Jurnal.janata@univpancasila.ac.id
Editorial Address
Program Studi Teknik Sipil Lantai 3 Gedung Fakultas Teknik Jl. Srengseng Sawah, Jagakarsa Jakarta Selatan, 12640
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Janata
Published by Universitas Pancasila
ISSN : 27985113     EISSN : 28093488     DOI : https://doi.org/10.35814/janata.v1i2.3117
Jurnal Janata is a journal manged by Departement of Civil Engineering Universitas Pancasila. This journal concerned with the practice and processes of community engagement. This journal accepts and publishes scientific articles focused on community service. The theme of the articles included in the scope (coverage) that can be accepted for publication in this journal, but not restricted, are: - Civil Engineering - Transportation Engineering - Water Resources Engineering - Geotechnical Engineering - Environmental Engineering - Construction Managemen
Articles 5 Documents
Search results for , issue "Vol 4 No 1 (2024): Jurnal Janata" : 5 Documents clear
PERENCANAAN BANGUNAN KLINIK PASCA GEMPA CIANJUR (STUDI KASUS: KLINIK BIDAN KELURAHAN CIBULAKAN, KAB. CIANJUR) Azaria Andreas; Irfan Ihsani; Resti Nur Arini; Fadli Kurnia; Ayu Herzanita
Jurnal JANATA Vol 4 No 1 (2024): Jurnal Janata
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Pancasila

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/janata.v4i1.6830

Abstract

The potential for earthquakes in Indonesia is caused by 2 conditions, namely, Indonesia's location which is located on the Pacific ring of fire, and Indonesia's location which is located at the meeting point of 3 active tectonic plates. The Cianjur earthquake in 2022 was a shallow crustal tectonic earthquake that occurred at a depth of around 10 km with a strength of 5.6 Mw. This main earthquake was followed by 140 aftershocks with strengths ranging from 1.2 to 4.2 Mw. Seeing the large potential for earthquakes in Indonesia, the Ministry of Public Works in 2006 issued guidelines for earthquake resistant building design. The earthquake also had an impact on the midwife clinic located in Cibulakan Urban Village. Where when an earthquake occurs, the building immediately collapses and is razed to the ground. Until 2024, the midwife clinic building will still not be erected and medical activities will be carried out in residential homes. Therefore, this research intends to carry out planning and construction of a 40 m2 building for medical activities. The design of the midwife clinic building takes the philosophy of earthquake-resistant houses built in earthquake-prone areas. One of the building concepts that must be applied in areas prone to earthquake disasters is building structural materials that are relatively lighter than materials in general, but still have sufficient strength. The results of the analysis show that building a midwife clinic costs Rp. 57,277,690 includes tax with a construction time of 32 calendar days.
IMPLEMENTASI PENANGANAN KRISIS AIR BERSIH DI DESA SUKAGALIH, KECAMATAN JONGGOL Ayu Herzanita; Azaria Andreas; Nuryani Tinumbia; Dwi Ariyani
Jurnal JANATA Vol 4 No 1 (2024): Jurnal Janata
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Pancasila

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/janata.v4i1.6841

Abstract

The clean water crisis that occurred on the island of Java was predicted 10 years ago. The increasing population plus an inadequate water distribution network system is the root of the clean water problem in Sukagalih Village, Jonggol District. On the other hand, the water discharge produced by springs always fluctuates according to changing seasons. This research aims to plan a clean water system network that connects springs with water collection points in Hamlet 2, Sukagalih Village. The objectives of this research include analyzing the water pipe route alignment, analyzing the costs and duration of work implementation, and implementing the planning results into real construction in the field. The research method used is construction planning based on the last planner system (LPS). This approach is chosen so that the planning process can take place flexibly and can be updated following developments in conditions in the field. The research results show that the costs required to carry out the work are Rp. 14,710,000. Meanwhile, the time required to complete this work is 8 weeks (2 months). Specifically for pipe installation work, it takes 3 weeks. The results of checking the system that was built went well and water from the spring flowed smoothly to the planned water collection point using a water torrent.
MENINGKATKAN AKSES AIR BERSIH DI DESA SUKAGALIH, KECAMATAN JONGGOL, JAWA BARAT rini trisno; Imam Hagni Puspito; Dwi Ariyani
Jurnal JANATA Vol 4 No 1 (2024): Jurnal Janata
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Pancasila

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/janata.v4i1.6958

Abstract

Pengabdian ini memfokuskan pada Kampung Leuwijati di Desa Sukagalih, Kecamatan Jonggol, Kabupaten Bogor. Warga di sini mengandalkan sumber mata air perorangan sebagai sumber utama air bersih, yang menyebabkan masalah akses air bersih terutama selama musim kemarau. Pengabdian ini bertujuan untuk mengatasi masalah ini dengan membangun bak penampungan air bersih yang memenuhi standar kesehatan dan lingkungan. Dalam pelaksanaan pengabdian kepada masyarakat, data debit air dari mata air diukur dan kebutuhan air bersih masyarakat diperkirakan. Pembangunan bak penampungan melibatkan partisipasi masyarakat setempat yang menyediakan lahan untuk proyek tersebut. Solusi yang diusulkan termasuk pembangunan bak penampungan di lokasi mata air. Hasil pengabdian menunjukkan bahwa debit air di mata air mencukupi untuk memenuhi kebutuhan air bersih 30 kepala keluarga. Oleh karena itu, direncanakan untuk membangun bak penampungan air. Sejumlah solusi yang diusulkan mencakup desain bak penampungan, jenis material yang digunakan, dan lokasi alternatif untuk memenuhi kebutuhan air bersih di Kampung Leuwijati. Pengabdian ini memberikan solusi praktis untuk meningkatkan akses air bersih dan sanitasi yang sesuai dengan standar kesehatan dan lingkungan di wilayah tersebut, serta melibatkan partisipasi masyarakat dalam proses pembangunan infrastruktur air bersih yang lebih baik.
PEMBELAJARAN BERBASIS PROYEK UNTUK PENGUATAN TEACHING FACTORY (SMK NU BODEH, PEMALANG) Prima Jiwa Osly; Wita Meutia; Nia Rachmawati
Jurnal JANATA Vol 4 No 1 (2024): Jurnal Janata
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Pancasila

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/janata.v4i1.6974

Abstract

SMK Nu Bodeh bersiap dalam menciptakan lulusan SMK terampil yang siap bersaing di dunia industri. Metode Project-based Learning (PjBL) dan konsep teaching factory telah diidentifikasi sebagai pendekatan pembelajaran yang efektif untuk meningkatkan kualitas pendidikan kejuruan. Namun, implementasi kedua pendekatan ini di SMK masih menghadapi berbagai tantangan, salah satunya adalah kurangnya pemahaman dan keterampilan guru dalam mengaplikasikan PjBL dan teaching factory. Pengabdian kepada Masyarakat ini bertujuan untuk memberikan penyuluhan kepada guru SMK mengenai PjBL untuk memperkuat teaching factory. Hasil diskusi dalam penyuluhan menunjukkan bahwa penyuluhan memberikan peningkatan signifikan dalam pemahaman dan keterampilan guru terkait PjBL dan teaching factory. Selain itu, penyuluhan juga meningkatkan motivasi dan kepercayaan diri guru SMK Nu Bodeh dalam menerapkan metode pembelajaran ini.
PENDAMPINGAN SURVEI KEPUASAN PELAYANAN PUBLIK PADA FASILITAS LIKUIDITAS PEMBIAYAAN PERUMAHAN Diyanti Diyanti
Jurnal JANATA Vol 4 No 1 (2024): Jurnal Janata
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Pancasila

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/janata.v4i1.6993

Abstract

It is felt that public services provided by government officials currently do not meet public expectations. This can be seen from various public complaints conveyed through mass media and social networks. If this is not addressed, this will harm the government. The purpose of accompanying the public service satisfaction survey for the Housing Financing Liquidity Facility (FLPP) management activities is an evaluate material for the performance of the Funding Fund Management Center (PPDPP). The method used in this activity is a public service satisfaction survey which refers to the PAN-RB Regulations. The results obtained are that currently, the PPDPP performance for handling FLPP is with a Community Satisfaction Index (IKM) of 3.38, which means the FLPP service provided is in a good category.

Page 1 of 1 | Total Record : 5