cover
Contact Name
Henriette D. Titaley
Contact Email
henriette.titaley@polnam.ac.id
Phone
+6282188099397
Journal Mail Official
henriette.titaley@polnam.ac.id
Editorial Address
Jl. Ir. M. Putuhena, Wailela-Rumah Tiga, Kota Ambon Provinsi Maluku
Location
Kota ambon,
Maluku
INDONESIA
Jurnal Agregate
ISSN : -     EISSN : 29645158     DOI : https://doi.org/10.31959/ja.v2i1
Core Subject : Engineering,
Jurnal Agregate adalah Jurnal yang memberikan informasi ilmiah tentang perkembangan ilmu pengetahuan dan teknologi bidang Struktur, Bahan Bangunan Dan Kegempaan, Teknik Sumber Daya Air, Transportasi, Management Konstruksi, Geoteknikal, Teknik Pantai Dan Tsunami.
Articles 38 Documents
Search results for , issue "Vol. 2 No. 2 (2023): September" : 38 Documents clear
FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK RENOVASI DAN PERLUASAN GEDUNG BALAI KARANTINA IKAN AMBON Legion Kopong; Nelda Maelissa; Henriette Dorothy Titaley
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1200

Abstract

Conatruction dealy is acommon problem Which frequently happens in construction industry. The purpose of this study was to indentity and categorize the delays causing factors greatly effecting the fish quarantine center building revavation and expansion project. The Fish quarantine center building renovation project was the object of this study motivated by delays. Futhermore, based on the secondary data obtained, time schedule is entirely used as the duration and normal cost of the project. Then, the Principal Compenent Analysis (PCA) method is applied to be able to find out the main factors causing dealys. Based on the results of the normality test and principal compenent analysis, the factors that effect the delay in the renovation and expansion of the Ambon Fish Quarantine Center Building were the material factors with a total variance of 57.575% including X1.1. Lack of construction materials, X1.2 Material changes in from, function, and specifications, X1.3 Delay in delivery of materials, X1.4 Damage to materials in storage, X1.5 Inccuracy of time.
ANALISIS PERILAKU KEKAKUAN LANTAI STRUKTUR GEDUNG HOTEL ZEST AMBON MENGGUNAKAN METODE RESPONS SPEKTRUM Victor C. M Latumeten; Pieter Lourens Frans; Vector R. R. Hutubessy
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1372

Abstract

Earthquakes that occur can sometimes affect the structure of the building. This research was conducted to determine the effect of the earthquake on the building of the Zest Ambon hotel building which was newly build in 2018. This study aims to analyze the behavior of floor stiffness in Zest Hotel Ambon building, resulting in a large displacement value in Zest Hotel Ambon building. Data collected in this present strudy is primary data in the form of a map of the building layout, secondary data in the form of structural drawings of the zest hotel buildings. Analysis of floor stiffness and displacement of zest hotel ambon building using ETABS (Extended three analysis building systems) software with dynamic load response spectrum based on the soil site class SNI-03-1726-2019.The result of analysis showed that the deviation value between floor is still within permit limit determined by SNI-03-1726-2019and the largest amount of displacement value found on 11th floor with an X direction of 21,6 mm and a Y direction of 21,7mm where higher the floor level in the building, the greater the displacement value.
EVALUASI SISTEM DRAINASE RUAS JALAN LOKKI - IHA KULUR DESA LUHU KECAMATAN HUAMUAL KABUPATEN SERAM BAGIAN BARAT Aldi Notanubun; Renny James Betaubun; Standi Johanes
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1374

Abstract

The Lokki – Iha Kulur Road Section is the main transportation route that connects villages in Huamual District, West Seram District. This area often experiences inundation and runoff caused by drainage that cannot accommodate flood discharge and improper drainage elevation systems. To overcome this problem, it is necessary to review the drainage system. The research method used is the method of data collection and analysis. The data used are primary data and secondary data and then analyzed using rational methods based on hydrological analysis and hydraulics analysis and evaluated based on the magnitude of the discharge of the existing canal with the magnitude of the planned discharge. Based on the calculation results for a 5-year return period, a planned rainfall of 632.812 mm is obtained, with a population growth percentage of 1.2% per year so the population of Luhu Village in 2026 is 34,251 people. From the results of the analysis, it was found that the amount of planned discharge entering the Lokki – Iha Kulur Road drainage was 0.15038 m3/s for drainage 1 and 0.14377 m3/s for drainage 2. Meanwhile, the discharge for the Lokki – Iha Kulur Road drainage for drainage 1 is 0.14229 m3/sec and for the drainage 2 is  0.14377 m3/sec. So it was found that the drainage was not able to accommodate the planned flood discharge so it was necessary to re-plan the drainage dimensions so that the problems of inundation and runoff could be overcome.
OPTIMALISASI STRUKTUR RANGKA BATANG JEMBATAN WAY MAMUA KABUPATEN MALUKU TENGAH Pedro Aloon; Pieter Lourens Frans; Godfried Lewakabessy
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1376

Abstract

The truss structure of the bridge is formed from several arrangement of rod elements which are connected by joint joints at the point of connection. The actual conditions in the field on the main frame structure of the Way Mamua bridge, Leihitu District, Central Maluku Regency, have dimensions of the steel cross-section that are quite large and not optimal, so that in this present study aims to analyze the rod forces of the Way Mamua Bridge structure and optimize the cross-sectional dimensions of the Way Mamua Bridge trunk frame. The methods used in this study are the ritter and cremona methods, as well as cross-sectional optimization simulations using the help of the SAP2000 program. Loading Standards for Bridges based on SNI 1725:2016 and Steel Structure Planning Standards for Bridges are used by SK regulations. SNI T-03-2005. Based on the results analysis of the rod forces of the Way Mamua Bridge structure, a minimum bar force was obtained for the upper horizontal bar, the lower horizontal bar and the diagonal bar totaling 2 bars. The maximum bar force for the upper horizontal bar is 1 bar, while the lower horizontal bar and diagonal bar are 2 bars with accepted forces namely compressive and tensile forces. The optimization results obtained an increase in the percentage of cross-sectional dimensions to the cross-sectional area for the upper horizontal bar by 2%, the lower horizontal bar and diagonal bar experienced a percentage reduction of 64% and 54% of the cross-sectional dimensions under actual conditions in the field. From the optimization results, the voltage ratio is not > 1 so that it can be concluded that the bridge bar truss structure is still in safe condition.
ANALISIS PERBANDINGAN PEMAKAIAN SEMEN TONASA DAN SEMEN CONCH TERHADAP KUAT TEKAN BETON Ris Viko Istia; David Daniel Marthin Huwae; Hendrie Tahya
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1482

Abstract

This research was conducted to test the comparison of compressive strength of concrete using Tonasa cement and Conch cement. Remembering that cement is the most important material in making concrete. So many people use Portland cement in making concrete. The aim of this research is to determine the compressive strength of concrete that is good for use in construction work. In this research, Tonasa cement and Conch cement were used to determine the compressive strength of concrete at the age of 3 days and 7 days in the Ambon State Polytechnic laboratory, civil engineering department. With 12 cylindrical test objects with a diameter of 15 cm and a height of 30 cm. The method used in this research is an experimental method, to investigate the relationship between the compressive strength of compression testing machine concrete and the hammer test number test. the result showed that the  average compressive strength is : Tonasa cement was 41.52 Mpa for cylindrical concrete, 500.23  for cube concrete at 3 days old and 28.16 MPa for cylindrical concrete, 339.32  for cube concrete at 7 days and Conch cement of 38.92 Mpa for cylindrical concrete, 468.97  for cube concrete at 3 years of age. days, and 26.86 MPa for cylindrical concrete, 323.58  for cube concrete at the age of 7 days.
PERENCANAAN DINDING PENAHAN TANAH UNTUK MENANGGULANGI KELONGSORAN PADA RUAS JALAN HUTUMURI KECAMATAN LEITIMUR SELATAN Valentino Soumahu; Godfried Lewakabessy; Sjafrudin Latar
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1509

Abstract

Retaining walls serve the purpose of withstanding lateral pressure from the soil behind them. This construction can be considered as an alternative for addressing potential landslides along the embankment of Hutumuri village road. The aim of this research is to plan a retaining wall as one of the reinforcement alternatives for the embankment along the section of Hutumuri road from Station (STA) 1+200 to 1+270. The planning of the retaining wall along this road section begins with a soil stability analysis using the simple slice method. Subsequently, employing the Terzaghi method, the stability of the wall against soil pressure behind it is analyzed to prevent displacement and potential collapse during the construction of the retaining wall. Utilizing the Simple Slice method and Rankine's theory to assess the slope conditions and the construction of the retaining wall along Hutumuri road section, values for the slope safety factor are obtained. In the unsafe condition, the slope safety factor is less than 1.2, indicating the need for an alternative slope reinforcement, such as a retaining wall. The analysis results for the stability of the Counterfort-type retaining wall indicate that it does not meet the requirements. This is due to the fact that, in section I, the soil bearing capacity safety factor (FS) is 2.454, where the value of FS is less than the recommended value of 3, signaling the need for further consideration and potential adjustments in the design.
ANALISIS LAPIS PERKERASAN TAMBAH DAN DRAINASE PADA RUAS JALAN WAEMITAL-KAWATU KABUPATEN SERAM BAGIAN BARAT Juan Devid Pattiradjawane; Selly Metekohy; Standy Johannes
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1555

Abstract

Handling road damage by overlaying the old road surface layer and planning a drainage system to improve the area value of the Waemital-Kawatu road section, West Seram Regency. The aim of the research was to determine the thickness of the overlay layer and the channel dimensions needed by the Waemital-Kawatu road section, West Seram Regency. The data used are primary data and secondary data then analyzed using the 2017 Road Pavement Design Manual Method for Additional Pavement Layers and the Rational Method for Drainage, then data processing is carried out referring to these regulations. Based on the results of this research, it was obtained that the CBR of class A aggregate foundation layer was 54%. So that with a design life of 20 years and a traffic value on the design lane of 801,068.59, the pavement layer thickness (overlay) with AC-WC = 40 mm, AC-BC layer thickness = 60 mm, class A aggregate layer thickness = 400 mm is obtained. . The results of the calculation of the drainage channel for a 5-year return period obtained a planned rainfall of 134,259 mm, with a population growth percentage of 1.1% per year so that the population of Waemital Village in 2026 is 7,443 people. From the results of the analysis of the drainage system, it was found that the planned discharge of the drainage channel on the Waemital-Kawatu Road Section was 0.0635 m3/sec, and the discharge of the drainage channel on the Waemital-Kawatu Road Section was 0.078197 m3/sec, then it was found that the discharge capacity of the channel was greater from the design discharge, so that the plan dimensions are declared safe.
ANALISIS FAKTOR-FAKTOR PENYEBAB TERJADINYA REWORK PADA PROYEK PEMBANGUNAN HOTEL ZEST AMBON Siti Patimah Daeng Simamang; La Mohammat Saleh; Willem Gaspersz
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1593

Abstract

As a developing country, Indonesia cannot be separated from development and development in all fields, one of which is the construction and development of the construction business sector. The success of a project is largely determined by the good cooperation between the owner and the service provider. If the technical implementation is not good, it will have a bad impact on project performance, one of which is rework. The word rework in the Big Indonesian Dictionary is translated as rework or rework. Rework on construction projects is caused by errors in planning, wrong work procedures, and lack of supervision and can result in several losses, such as cost, time, and quality of work. This research was conducted by interviewing and distributing questionnaires to the construction project of Hotel Zest Ambon as many as 30 respondents. Respondents selected were implementers, supervisors, foremen, and workers. The questionnaires distributed were related to the factors causing the rework on the Zest Ambon Hotel construction project, which is located on Jl. Imam Bonjol, Kel Ahusen, Sirimau, Ambon City. Then the research results were processed using SPSS 26, using 4 methods of analysis, namely validity test, reliability test, descriptive analysis, and factor analysis to get the factors causing the rework and the dominant factors causing the rework. The results of the research show that there are three factors that cause rework, namely design and documentation factors with a mean value of 4.53, resource factors with a mean value of 4.37, and managerial factors with a mean value of 3.80. And the dominant factor is the design and documentation factor with Eigenvalues ​​> 1, which is 1.50.
ANALISIS PENGARUH SUHU CAMPURAN AC-WC TERHADAP BERAT JENIS PEKERJAAN JALAN TANIWEL-SALEMAN PULAU SERAM Najar Rumbia; David Daniel Marthin Huwae; Elisabeth Talakua
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1604

Abstract

This condition causes the asphalt mixture to be unable to be overlaid on the road work site because the temperature of the mixture is below the overlay and compaction temperature. According to the provisions of the asphalt mixture that has experienced a decrease in temperature can no loger be used. But the reality that happens a lot in the field is that sanding is still done and followed by the next stage, namely compaction. Therefore, it is necessary to conduct research on the effect of heating on the concrete asphalt layer mixture, namely hot rolled sheet-Base (HRS-Base). The method used, the effect of AC-WC asphalt mixture temperature on the specific gravity of road work is . From yhe results of the marshall analysis, the value of marshall parameters that meet the requirements is in the range of asphalt content 4.50-5.80 so that the optimum asphalt content is obtained at the middle value of the limit range above is 5.12%. Comparison of asphalt temperature to field temperature and lab asphalt temperature. The asphalt temperature in the lab is 5.5% asphalt content and the asphalt temperature used in the lab is 160°C, 150°C, 140°C, 130°C, while the asphalt content used in the field is 5.0% asphalt content and the asphalt temperature used in the field is 125°C, 135°C, 140°C, 145°C. Further research needs to be carried out in the form of marshall soaking tests with the intention of measuring the durability of the binding/adhesion of asphalt mixtures to the influence of temperature.
PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN REVITALISASI DAN PENGEMBANGAN ASRAMA HAJI WAIHERU AMBON Tomabuji Talaohu; Tonny Sahusilawane; Maslan Abdin
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1679

Abstract

The revitalization and construction of the Waiheru Ambon hajj dormitory building, the method used in this research is the validation test, reliability test, f test and t test using the SPSS V16 tool where in this method the questionnaire data will be obtained which will then be analyzed with the SPSS V16 tool. The research results were obtained based on the results of data analysis that has been carried out to solve the problem in this research where when conducting research on project implementation such as column casting work, it is often found that the workforce is not effective and efficient when pressing the vibrator so that when dismantling the formwork you can see many columns. which is corroded, then obtained: 1) The positive influence between competence on labor productivity can be seen from the t-count of  5.149 > t-table 1.724 and sig value = 0.000 < 0.05 which means that competence is very influential in influencing labor productivity. 2) The positive effect between skills on labor productivity can be seen from the t-count of 3.732 > t table 1.724 and sig value = 0.001 < 0.05 which means that skills is very influential in influencing labor productivity. 3) The positive effect of work discipline on labor productivity can be seen from the t-count of 11.992 > t-table 1.724 and sig value = 0.000 < 0.05 which means that work discipline is very influential in influencing labor productivity. 4) The positive influence between the level of income on labor productivity can be seen from the t-count 3.968 > t-table 1.724 and sig value = 0.001 < 0.05 which means that the level of income is very influential in influencing labor productivity. 