cover
Contact Name
Tri Wardati Khusniyah
Contact Email
trikhusniyah@unesa.ac.id
Phone
+6281217842262
Journal Mail Official
viteks@unesa.ac.id
Editorial Address
Kampus Unesa 1, Jalan Ketintang, Gedung K4, Surabaya. Kode Pos: 60231
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Vokasi Teknik Sipil
ISSN : -     EISSN : 30642159     DOI : -
Core Subject : Engineering,
Jurnal Vokasi Teknik Sipil is aimed at all academics and practitioners in the field of civil engineering, especially applied civil engineering. The Scope of Applied Civil Engineering Journal covers the results of field research, literature studies, application of the method, development of standard operating procedure, and development of civil engineering technology. The journal is issued 3 (two) times a year and min. 5 articles per issue. The research is viewed through macro or micro civil engineering perspectives from various aspects, such as: planning, design, management, operational, production, , human resources, safety, and finance. Focus and Scope : The scope of the article includes: Construction management Structural Engineering Geotechnical Engineering Construction Materials Construction Surveyors Safety and Environmental of construction
Articles 113 Documents
ANALISIS DAYA DUKUNG TANAH DENGAN METODE UJI SONDIR DI RUMAH SAKIT KABUPATEN KEDIRI PROVINSI JAWA TIMUR Aisya Kamila Putri
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

JENIS DAN DOMINASI MATERIAL YANG DIANGKAT OLEH TOWER CRANE PADA PEKERJAAN STRUKTUR (STUDI KASUS PROYEK RUMAH SAKIT MITRA KELUARGA SIDOARJO) Naufal Hafidz Irsadunnafi
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Development projects in Indonesia have progressed rapidly. One of the ongoing projects is the Mitra Keluarga Hospital Project (RSMK) Sidoarjo. Mitra Keluarga Hospital Project (RSMK) Sidoarjo was built with a building area of 14,330 m2 and has 6 floors + roof floor. In the implementation of the Mitra Keluarga Hospital Project (RSMK) Sidoarjo requires heavy equipment in the form of a tower crane which has a high mobility function as a supplier of materials and tools needed during construction. This study aims to determine the type and dominance of materials lifted by tower cranes in structural work. The method used is field observation which is carried out for 14 working days with 8 hours per day. From the observations obtained several types of materials lifted by the tower crane, namely reinforcing iron, UNP iron, hollow iron, plywood, suri-suri, tie rod + wing nut, push pull, bucket concrete, formwork, scaffolding, support pipes, galvanized pipes, rafters, beam clamps, column clamps, hanging formwork, welding machines, compressors, stirrups, bendrat wire, and reinforcement circuits. From the analysis of several materials raised, there are 3 dominant materials, namely D19 iron, D10 iron, and bucket concrete + ready mix.
PEKERJAAN STRUKTUR ATAP PADA PROYEK GEDUNG TERPADU PSIKOLOGI OLAHRAGA UNESA Intan Imroatuzzakiyah
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This activity was carried out in the construction project of the Integrated Sports Psychology Building of the State University of Surabaya which is located in Lidah Wetan, Surabaya. The project was carried out by PT. Nindya Karya as the implementing contractor with a project contract value of IDR 120,140,000,000 (Inches VAT). The project consists of two parts of the structure, namely the lower structure and the upper structure. The upper structure is a structure whose position is above the lower structure that is above the ground level such as a roof structure. There are several types of roof structures used, one of which is light steel and conventional steel. Light steel as a roof truss nowadays is increasingly popular, almost all buildings, offices, hospitals, places of worship, in big cities in Indonesia have used light steel roof trusses. The use factor of light steel structure is due to the ease and speed of installation.
PERBANDINGAN PRODUKTIVITAS EXCAVATOR PC 200 PADA PEKERJAAN GALIAN TANAH METODE SEMI TOP-DOWN DENGAN METODE KONVENSIONAL Khrisna Dandy Alfariz
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penggunaan alat berat, terutama excavator, sangat penting dalam proyek konstruksi untuk efisiensi dan percepatan pekerjaan. Tujuan dari penelitian ini adalah untuk membandingkan produktivitas excavator PC 200 dalam pekerjaan galian tanah menggunakan metode semi top-down dan metode konvensional. Metode penelitian yang digunakan adalah kuantitatif, dengan pengumpulan data primer dan sekunder dari proyek pembangunan apartemen Grand Shamaya, Surabaya. Data yang dikumpulkan diolah menggunakan perangkat lunak Microsoft Excel untuk menganalisis perbedaan produktivitas kedua metode. Dari hasil penelitian menunjukkan jika metode semi top-down memiliki produktivitas yang lebih tinggi dibandingkan dengan metode konvensional. Faktor-faktor seperti waktu siklus, jumlah pergerakan alat, dan kondisi tanah sangat mempengaruhi hasil produktivitas. Dengan demikian, pemilihan metode penggalian yang tepat dapat meningkatkan efisiensi serta efektivitas dalam proyek konstruksi.
Pelaksanaan Pemancangan Pondasi Tiang Pancang Menggunakan Hydraulic Static Pile Driver pada Proyek Pembangunan Gedung Pringgodigdo Universitas Airlangga Surabaya Aisyatur Rahmah
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Project activity is an activity that requires careful planning so that its implementation runs smoothly. One of them is a construction development project. Therefore, researchers are interested in discussing construction development. This study aims to examine and analyze related piling work, namely starting from the piles used, the piling tools used, to the stages in the piling work. This type of research is quantitative research. The data collection techniques used in this research are observation, interviews, literature, working drawings from the project and documentation. The piling method uses a compressive mode so that the piles reach the depth of the soil. The informants of this research are people who are in the Pringgodigdo Building Construction project, Airlangga University Surabaya right on Jl. Dharmawangsa No. 4-6, Kec. Gubeng, Surabaya. The results of this study indicate that in the construction of the Pringgodigdo Building, piling work was carried out using a diameter 60 spun pile using a ZYJ type HSPD (Hydraulic Static Pile Driver) piling tool.46 The results of the calculation of HSPD machine productivity are in line with the specifications
EVALUASI KEBUTUHAN RUANG PARKIR PADA GEDUNG PARKIR RUMAH SAKIT BHAYANGKARA KEDIRI BERDASARKAN SATUAN RUANG PARKIR (SRP) Giovanni Mahardika Novianto
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Untuk mengatasi kemungkinan lonjakan pasien di Rumah Sakit Bhayangkara Kediri, maka dibangunnya fasilitas gedung parkir baru agar tidak menimbulkan parkir liar di badan jalan. Dalam merencanakan tempat parkir yang nyaman, penting untuk memahami kebutuhan ruang parkir yang ditentukan berdasarkan Satuan Ruang Parkir (SRP). Tujuan dari penelitian ini yaitu, untuk mengetahui apakah pembangunan gedung parkir pada Rumah Sakit Bhayangkara Kediri telah mematuhi ketentuan yang ditetapkan oleh Satuan Ruang Parkir (SRP). Metode yang digunakan untuk pencarian data menggunakan observasi langsung di lapangan untuk membandingkan parkir eksisting dengan ketentuan Satuan Ruang Parkir (SRP) yang ditetapkan oleh Direktorat Jenderal Perhubungan Darat tahun 1996. Berdasarkan hasil observasi dapat diketahui data eksisting diperoleh hasil yakni 89 SRP, sedangkan pada ketentuan Pedoman Dirjen Perhubungan Darat 1996, SRP yang dibutuhkan adalah 125 SRP. Maka perlu dilakukan evaluasi penambahan SRP pada mobil dan motor. Hasil evaluasi penambahan petak parkir untuk motor yaitu 21 SRP, lalu dijumlahkan dengan SRP mobil sebesar 104 SRP. Sehingga diperoleh hasil total 125 SRP. Hasil tersebut sudah sesuai dengan pedoman Dirjen Perhubungan Darat 1996. Kata Kunci: Gedung Parkir, Parkir, Satuan Ruang Parkir (SRP)
PRODUKTIVITAS ALAT PANCANG HYDRAULIC STATIC PILE DRIVER PADA PROYEK GRAHA CAHAYA KUSUMA Priska Krisna Santoso
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Proyek konstruksi yang berhasil adalah proyek yang dapat diselesaikan dengan biaya dan waktu yang seefisienmungkin. Untuk mencapai hal ini, diperlukan prediksi produktivitas yang tepat untuk merencanakan danmengendalikan operasi konstruksi. Penelitian ini bertujuan mengetahui produktivitas hydraulic static pile driversebagai kontrol dalam pengoperasiannya agar proyek dapat berjalan lancar sesuai dengan kebutuhan yangdiinginkan. Metode penelitian yang digunakan adalah kuantitatif. Berdasarkan hasil penelitian produktivitastertinggi terjadi di titik nomor 58 dengan kedalaman tiang pancang 36 meter sebesar 34,47 m/jam dan titik nomor157 dengan kedalaman tiang pancang 24 meter sebesar 32,31 m/jam. Sedangkan, produktivitas terendah pada titiknomor 34 dengan kedalaman tiang pancang 36 meter sebesar 22,99 m/jam dan titik nomor 158 dengan kedalamantiang pancang 24 meter sebesar 19,24 m/jam.
Produktivitas Alat Berat Excavator Caterpillar 320 Pada Pekerjaan Galian Tanah Di Proyek Pekerjaan Kontruksi Fisik dan Bangunan Rumah Sakit UPT Vertikal Surabaya Athian Ravanelli Dei Rizaldi
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PROYEK RENOVASI GEDUNG NEUCENTRIX KEBALEN SURABAYA Susi Risma Aprilia
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Internship practice is a program designed to provide practical work experience to students or individuals who are required to be students. The main objectives of internship practice are to develop professional skills, understand the dynamics of the workplace, apply theories that have been learned, and open up employment opportunities. The purpose of this research is to increase insight into the process of building renovation in construction projects. This research uses a literature study research method, with data collection in the form of literature reviews from journals and scientific articles. The results showed that in the construction of the renovation of the Neucentrix Kebalen data center office building, the control and monitoring process was very good and complete. All control and monitoring activities were held regularly every day, week, and month. The overall implementation of the work did not experience any obstacles thanks to the time acceleration that was implemented. However, the application of Occupational Safety & Health (OHS) at the project site is still relatively lacking, because there are still many workers who are less compliant with the application of OHS and the use of Personal Protective Equipment (PPE).
PENDAMPINGAN PEMBANGUNAN RUMAH SUSUN KEMENSOS BBRSPDF PROF. DR. SOEHARSO, KOTA SURAKARTA Namira Farah Amitra
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Magang dan Studi Independen Bersertifikat program (MSIB) is an internship program held by the government through the Ministry of Education and Culture so that students gain experience in the world of work in a professional manner. The Directorate General of Housing under the auspices of the Ministry of Pekerjaan Umum dan Perumahan Rakyat (PUPR) has also opened an apprenticeship program with one of them as Assistant for Flats Development. The Directorate of Flats in the 2022 strategic plan plans an assistance program for the construction of flats of 51,340 units by 2024. Therefore, students are invited to directly participate in the apartment development assistance program. Student participation in this program is assisting the construction of flats as Construction Supervisor Assistants or Project Management Assistants spread across 7 provinces in Indonesia. This internship program will provide many benefits such as increasing knowledge regarding assistance in the construction of flats, procurement of construction services, project management and other knowledge, especially in the field of construction.

Page 8 of 12 | Total Record : 113