cover
Contact Name
Tri Wardati Khusniyah
Contact Email
trikhusniyah@unesa.ac.id
Phone
+6281217842262
Journal Mail Official
viteks@unesa.ac.id
Editorial Address
Kampus Unesa 1, Jalan Ketintang, Gedung K4, Surabaya. Kode Pos: 60231
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Vokasi Teknik Sipil
ISSN : -     EISSN : 30642159     DOI : -
Core Subject : Engineering,
Jurnal Vokasi Teknik Sipil is aimed at all academics and practitioners in the field of civil engineering, especially applied civil engineering. The Scope of Applied Civil Engineering Journal covers the results of field research, literature studies, application of the method, development of standard operating procedure, and development of civil engineering technology. The journal is issued 3 (two) times a year and min. 5 articles per issue. The research is viewed through macro or micro civil engineering perspectives from various aspects, such as: planning, design, management, operational, production, , human resources, safety, and finance. Focus and Scope : The scope of the article includes: Construction management Structural Engineering Geotechnical Engineering Construction Materials Construction Surveyors Safety and Environmental of construction
Articles 113 Documents
PENGAMATAN PELAKSANAAN PEKERJAAN STRUKTUR KOLOM PADA PROYEK GEDUNG TERPADU PSIKOLOGI OLAHRAGA UNIVERSITAS NEGERI SURABAYA DI PT. NINDYA KARYA Aprillia Rachmayanti
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This article presents the findings of an internship report carried out on the Unesa Sports Psychology Integrated Building construction project with the aim of analyzing and evaluating the project. The contents of the report include an in-depth analysis of the column structure. Columns act as the main vertical elements that distribute the building load to the ground base, a deep understanding of the behavior and structural characteristics of columns is essential in ensuring the success of the project. The approach applied includes data and information collection, structural modeling using special software and analysis of the load and strength of column structures. The results of the analysis show that the column structure in the Unesa Sports Psychology Integrated Building construction project meets the specified strength and stability requirements. It is hoped that this Work Practice Internship report and article can make a positive contribution to developing knowledge about column structures and improving safe and efficient construction practices in the future.
PERHITUNGAN PRODUKTIVITAS ALAT BERAT DUMP TRUCK COLT DIESEL CANTER FE 74 HD 125 PS UNTUK PEKERJAAN GALIAN PADA PEMBANGUNAN GEDUNG JI'RONA PROYEK RS AISYIYAH BOJONEGORO Fajriel Itsnani Nur Syamsiyah
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Identifikasi Variabel Risiko Kesehatan dan Keselamatan Kerja (K3) Pada Pembangunan Waron Hospital Rufiyani Devi
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

During the construction period, there will be risks that do not rule out the possibility of occurring, such as occupational health and safety hazards, one of which is the occurrence of work accidents. Lack of discipline in the use of PPE can also trigger these risks, so that it can make it possible for construction construction to have a high risk of work accidents. The purpose of this study is to identify the variables of occupational accident risk that can occur in the construction of Waron Hospital. This study collects data with secondary data taken from literature books, journals, and the internet. The results of the study obtained 38 risk indicators that were reviewed based on work items, namely 6 work items, and 13 work activities. The description of the work activities is that there are 4 risks in soil excavation work, 1 risk in material lifting work, 2 risks in welding cutting work, 3 risks in the installation of reinforcing steel frames, 4 risks in casting, 4 risks in formwork installation, 3 risks in material lifting, 1 risk in the preparation and cutting process work, 3 risks in the installation of roof and ceiling coverings, 3 risks in wall and stucco installation work, 4 risks in ceramic installation work, 3 risks in water pipeline installation, and 3 risks in electrical installation.
Pemodelan Menggunakan Software Plaxis Untuk Simulasi Daya Dukung Fondasi Bored Pile Nur Syintyiah Rachmah
Jurnal Vokasi Teknik Sipil Vol 2 No 2 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The foundation of a drill pile or bored pile is used to support a building structure by drilling a hole into the ground and filling it with steel reinforcement and concrete. Evaluation of the strength of the supporting capacity of a bored pile foundation is important in the design and construction process, to ensure that the foundation can bear the load of the structure to be placed on it. The study used the Plaxis 2D software to simulate the support strength of the bored pile foundation, the Luciano Decourt method, and the Reese and Wright method to determine the comparison of the maximum support strength values. The results of this study show that the support power value obtained with the Reese and Wright method is closer to the support force result using the 2D Plaxis. From the third method calculations, the Qult value difference between the Plaxis 2D method and the Luciano Decourt method is -469.73 kN or -32.8% for data 1, -666.56 kN, or -36.7% for data 2, and -407.24 kN and -12.1% for data 3. For the differential between the Plaxis 2D method and the Reese and Wright method, the result was 0.63 kN or 0.1% for data 1, 78,58 kN, or 7.3% for data 2, and -80,64 kN (or -2.7% for data 3).
IDENTIFIKASI RISIKO KECELAKAAN KERJA PADA PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT Tiara Romadhona Ika Bayu Putri
Jurnal Vokasi Teknik Sipil Vol 2 No 3 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Currently, there are many hospital building projects which generally carry out risky activities which can lead to undesirable events Based on a literature study, hospital building construction projects, including construction projects, have a relatively high potential risk of accidents. This is because the hospital construction project involves quite complex work. In this study, the descriptive qualitative method was used, that is descriptive qualitative research, that is a research approach carried out by dechiper or describe the meaning of information or data obtained. The writing of this research was based on risk identification obtained through literature studies from 10 previous studies and then validated through expert judgment by experts. Based on the analysis, it can be concluded that there are 34 work accident risk indicators consisting of 5 risks from excavation and embankment work, 9 risks from formwork work, 10 risks from casting work, and 10 risks from casting work. 43 work accident risk variables consisting of 5 risks from excavation and embankment work, 10 risks from formwork work, 12 risks from casting work, and 16 risks from casting work. The results of this risk identification can be used as a basis for preventing possible risks from occuring of work accidents in hospital building construction projects.
PEKERJAAN STRUKTUR HIGH RISE BUILDING PADA PROYEK PEMBANGUNAN KANTOR BEST INDUSTRY GROUP Wirawan Abied Jayawardana
Jurnal Vokasi Teknik Sipil Vol 2 No 3 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

An internship is a set of exercises that students complete as part of training to advance their soft skill competencies. Purposive sampling is used in this study, meaning that the sample is chosen in accordance with predetermined standard that are carefully considered, namely interviews and observations. The project data results obtained included the Best Industry Surabaya Office construction project by PT. Sinar Waringin Adi Perkasa served as structural contractor and PT. Best as the owner or project owner. The Best Industry Surabaya Office Project has a land area of ± 2406 m² with a total of 10 floors (9 floors + 1 roof floor). The project value of the Surabaya Best Industry Office Project is IDR. 9,900,000,000. In this research, the results showed that during the work process in accordance with the RKS, the work drawings used were very clear and easy to understand, the implementation of the K3 system was not implemented well and operational activities ran quite smoothly and well.
PERBANDINGAN BIAYA BEKISTING KONVENSIONAL DAN BEKISTING ALUMINIUM (Studi Kasus: Gedung Rusunawa Pakal, Surabaya) Mia Sekar Ningrum Mia
Jurnal Vokasi Teknik Sipil Vol 2 No 3 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Project implementation time planning and cost budgeting are important aspects of project construction management. Project success can be measured by the timeliness of implementation and cost efficiency. One of the important components in construction is formwork, which functions as a concrete mold. The research aims examine time and cost efficiency between customary formwork and aluminum formwork in Pakal Surabaya 5-Storey Rusunawa Building project. The results show that although the initial cost of aluminum formwork is higher (Rp4.144.573.844,00) than conventional formwork (Rp3.530.269.038,00. Aluminum formwork also offers advantages in terms of efficiency, ease of installation, and quality of concrete finish. Thus, despite the larger initial investment, aluminum formwork can save time and long-term operational costs. This research provides recommendations to consider the use of aluminum formwork in future construction projects to improve project efficiency and effectiveness.
... Arroyhan Fatkholi Surur
Jurnal Vokasi Teknik Sipil Vol 2 No 3 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dalam proyek konstruksi, pemilihan alat berat sangat berperan dalam meningkatkan efisiensi dan produktivitas, yang dipengaruhi oleh karakteristik alat serta kondisi medan kerja. Salah satu alat berat yang digunakan dalam proyek pembangunan Apartemen Grand Shamaya Surabaya adalah Tower Crane Zoomlion/TC6520-10E, yang berfungsi untuk mengangkut material. Penelitian ini menggunakan metode kuantitatif dengan pengumpulan data primer dan sekunder dari proyek tersebut. Data yang diperoleh dianalisis menggunakan perangkat lunak Microsoft Excel yang nantinya akan digunakan untuk mengevaluasi produktivitas alat berat tower crane. Terdapat faktor yang dapat mempengaruhi produktivitas tower crane salah satunya yaitu waktu siklus memiliki pengaruh yang signifikan terhadap produktivitas alat berat; semakin pendek atau kecil waktu siklus, semakin tinggi produktivitas, sedangkan semakin panjang waktu siklus, produktivitas cenderung menurun.
Perhitungan Volume Menggunakan autodesk Revit Pada Struktur Rumah Sakit Orthopedi dan traumatologi Satrio Wibowo Amroin
Jurnal Vokasi Teknik Sipil Vol 2 No 3 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The construction sector in Indonesia is currently experiencing rapid progress, in line with the adoption of increasingly advanced technology. This technology greatly assists in various aspects of construction projects, particularly in the planning and calculation of structural work volumes. One of the commonly used software for this purpose is Autodesk Revit. This research was conducted at the Orthopedic and Traumatology Hospital 3 project in Surabaya, with the aim of calculating the work volume of various structural elements, such as foundations, sloofs, columns, beams, stairs, slabs, and elevator walls, and then comparing the results with existing volume data. The method used is quantitative descriptive. The results of the calculations using Autodesk Revit showed work volumes such as 13.45 m³ for working floors, 300.16 m³ for foundations with 5021.76 kg of reinforcement, and 197.28 m³ for columns with 257.20 kg of reinforcement, as well as 75.36 m³ for shear walls with 4661.54 kg of reinforcement. There is a significant difference in volume calculations between the conventional method and the BIM software, with the shear wall showing the largest difference (46%) and the beam (26%).
Penerapan BIM Menggunakan Software Archicad pada Perencanaan Gedung Asrama Putra Pondok Pesantren Baitul Makmur Surabaya Achmad Rosyid Wahyu Pabelan
Jurnal Vokasi Teknik Sipil Vol 2 No 3 (2024)
Publisher : Jurnal Vokasi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The implementation of the Building Information Modeling (BIM) concept is one of the significant innovations in the construction sector. Considering the substantial benefits of using BIM in construction projects and its high adoption rates in developed countries, yet recognizing the disparity in BIM software selection in Indonesia, this research aims to evaluate the outcomes of applying the BIM concept using ArchiCAD software in the building planning process. A case study was conducted on the planning of the Boys' Dormitory Building at the Baitul Makmur Islamic Boarding School in Surabaya, where the building was remodeled using ArchiCAD. This modeling produced outputs that were then analyzed as planning results. The findings indicate that ArchiCAD can apply the 3D BIM concept by automatically generating work volumes. The Budget Plan (RAB) obtained through BIM with ArchiCAD amounts to Rp. 3,743,234,392.57, which is 5.18% lower than the RAB from the planning consultant.