cover
Contact Name
Wesli
Contact Email
wesli@unimal.ac.id
Phone
+62811671918
Journal Mail Official
teras.jurnal@unimal.ac.id
Editorial Address
Civil Engineering Department, Universitas Malikussaleh,Main Campus of Universitas Malikussaleh Jl. Medan-Banda Aceh, Cot Tengku Nie, Reuleut, North Aceh District, Aceh, Indonesia Email: teras.jurnal@unimal.ac.id
Location
Kota lhokseumawe,
Aceh
INDONESIA
Jurnal Teknik Sipil
ISSN : 20880561     EISSN : 25021680     DOI : https://doi.org/10.29103/tj.v16i2.1360
Core Subject :
Focus and Scope Teras Jurnal - Jurnal Teknik Sipil is a journal that communicates the results of research within the scope of civil engineering and scientific development as well as aspects of practitioners. The process of manuscript submission is open throughout the year. All submitted manuscript will be screened with double-blind peer review and editorial review before they are accepted to publish. Teras Jurnal receives a manuscript from the following area below civil engineering science and development with the interdisciplinary and multidisciplinary approach: Building Materials and Structures Constructions Technology Constructions Economy and Management Earthquake Engineering Environmental Engineering Renovation of Buildings Geotechnical Engineering Highway Engineering Hydraulic and Hydraulic Structures Road and Bridge Engineering Structural Engineering Surveying and Geo-Spatial Engineering Transportation Engineering Tunnel Engineering Urban Engineering and Economy Water Resources Engineering Urban Drainage
Arjuna Subject : -
Articles 441 Documents
Perencanaan Bangunan Pelindung Pantai Di Desa Pesisir Besuki Kabupaten Situbondo Sabda Alam Akbar; Retno Utami Agung Wiyono; Entin Hidayah
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.816

Abstract

Abstrak Desa Pesisir yang terletak di Timur Pelabuhan Besuki Kabupaten Situbondo mengalami tangkis jebol dan rusak sepanjang 450 meter akibat diterjang gelombang laut. Angin kencang dan ombak besar yang menerjang tangkis pada 28 Januari 2021 itu mengakibatkan tangkis hancur di beberapa titik sepanjang garis pantai. Penelitian ini direncanakan 2 alternatif pelindung pantai yaitu revetment dan seawall sebagai perbandingan bangunan pelindung pantai yang cocok di Desa Pesisir Besuki untuk mengatasi permasalahan yang terjadi. Hasil perhitungan dimensi untuk bangunan revetment yaitu elevasi puncak sebesar 5.90 m dan lebar yaitu 2.13 dan dimensi seawall yang didapat yaitu tinggi puncak bangunan yaitu 6.10 m dan lebar 2.55 m. Total Rencana Anggaran Biaya (RAB) perencanaan kedua alternatif bangunan yaitu revetment blok beton 3B sebesar Rp. 59,699,911,000.00 dan seawall sebesar Rp. 59,350,778,000.00 dan dipilih seawall sebagai alternatif solusi bangunan pelindung pantai di Desa Pesisir Besuki Kabupaten Situbondo. Kata kunci: abrasi, revetment, seawall, pantai.   Abstract Pesisir village is located east of Besuki Harbor, Situbondo Regency, experienced a 450-meter being hit by sea waves. Strong winds and big waves that hit the seawall on January 28, 2021 caused the seawall to be destroyed at several points along the coastline. This study plans 2 alternative coastal protection, namely revetment and seawall as a comparison of suitable coastal protection buildings in Village Pesisir Besuki to overcome the problems that occur. The results of the calculation of dimensions for the revetment building are the peak elevation 5.90 m and the width 2.13 m and the dimensions of the seawall obtained are the peak height of the building which is 6.10 m and width is 2.55 m. The Total Budget Plan (RAB) for the planning of the two alternative buildings, namely the 3B concrete block revetment, is Rp. 59,699,911,000.00 and a seawall of Rp. 59,350,778,000.00 and selected seawall as an alternative solution for coastal protection buildings in Village Pesisir Besuki, Situbondo Regency. Keywords: abrasion, revetment, seawall, beach.
Identifikasi Sistem Manajemen Mutu Berbasis ISO 9001:2015 Pada Perusahaan Penyedia Jasa Konstruksi Di Kota Bengkulu Nova Novita; Annisa Fitria Edriani; Agustin Gunawan
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.818

Abstract

Abstrak Standar mutu yang digunakan oleh dunia konstruksi adalah standar ISO 9001:2015. Tujuan dari penelitian adalah untuk mengidentifikasi arah perkembangan penerapan sistem manajemen mutu, faktor pendorong dan faktor hambatan dalam penerapan sistem manajemen mutu berbasis ISO 9001:2015. Populasi dalam penelitian berjumlah 12 perusahaan sesuai batasan masalah dan sampel penelitian berjumlah 36 orang, yang diambil dari 3 orang responden per perusahaan. Penelitian dilakukan dengan menyebarkan kuesioner kemudian dianalisis menggunakan analisis statistik deskriptif dengan uji validitas dan uji reliabilitas. Hasil penelitian menunjukkan bahwa terdapat 8% perusahaan yang sudah menerapkan sistem manajemen mutu ISO 9001:2015 dan bersertifikat, 8% perusahaan sudah mengarah pada penerapan, dan 84% perusahaan belum menerapkan sama sekali. Faktor pendorong utama yaitu adanya tuntutan untuk memiliki sertifikat ISO sebagai syarat proses pelelangan proyek konstruksi jalan dan adanya persyaratan dari Kementerian PUPR. Faktor hambatan utama yaitu kurangnya dana untuk implementasi sistem manajemen mutu dan kurangnya sumber daya yang memenuhi standar. Kata kunci: Sistem manajemen mutu, ISO 9001:2015, perusahaan penyedia jasa konstruksi, faktor pendorong, faktor hambatan  Abstract The quality standard used by the construction world is the ISO 9001:2015 standard. The objective of this research was to identify the direction of the implementation development of a quality management system, the driving factors, and the inhibiting factors in the implementation of a quality management system based on ISO 9001:2015 in a road construction service provider companies in Bengkulu City. The population in this research consisted of 12 companies according to the problem boundaries and the research sample consisted of 36 people, which were taken from 3 respondents per company. The study was conducted by distributing questionnaires and then analyzed using descriptive statistical analysis namely validity and reliability test. The results showed that there were 8% of companies had implemented the ISO 9001:2015 quality management system and were certified, 8% of companies were already on the way to implementation, and 84% of companies have not implemented it at all. The main driving factor was the demand to have an ISO certification as a condition for the auction process and the requirements from the Ministry of Public Works. The main constraining factors were the lack of funds and the lack of resources that meet the standards. Keywords: Quality management system, ISO 9001:2015, construction service provider, driving factors, inhibiting factors
Aplikasi Metode Vertical Electrical Sounding untuk Pendugaan Kedalaman dan Ketebalan Lapisan Akuifer di Kota Langsa Sabrian Tri Anda; Nanda Firmanda; Zul Fadhli; Muhammad Syukri
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.819

Abstract

Abstrak Penyediaan sumber baku air bersih masih menjadi sebuah masalah utama yang dihadapi oleh pihak Perusahaan Air Minum Daerah (PDAM) Tirta Keumuneng Kota Langsa. Oleh sebab itu dilakukan sebuah studi sebagai acuan alternatif dalam penyediaan sumber baku air bersih di Kota Langsa berupa air tanah (groundwater). Studi dilakukan dengan menggunakan metode Vertical Electrical Sounding (VES) untuk menentukan potensi air tanah yang ditandai dengan keberadaan lapisan akuifer. Metode ini dilakukan dengan menginjeksi arus ke bawah permukaan bumi sehingga parameter fisis berupa nilai resistivitas dapat diketahui, untuk pendugaan awal lapisan akuifer guna pengidentifikasian potensi sumber baku air bersih berupa air tanah. Pengukuran data lapangan dilakukan di beberapa titik yang tersebar di wilayah Kota Langsa. Dari hasil pengukuran lapangan, diketahui bahwa Kota Langsa memiliki potensi keberadaan air tanah yang ditandai dengan adanya lapisan akuifer diduga berada pada kedalaman 43 - 105 m di bawah permukaan dengan rentang nilai resistivitas sebesar 31 - 45 „¦m. Kata kunci: groundwater, akuifer, vertical electrical sounding, resistivitas  Abstract The provision of a raw source of clean water is still a significant problem faced by the Local Water Company in Langsa City therefore, a study was carried out as an alternative in order to provide raw source of clean water in Langsa City by exploring the existence of groundwater. The study was conducted using the Vertical Electrical Sounding (VES) method to determine the groundwater potential which is indicated by the presence of aquifer layers. The method is applied by injecting the electrical currents beneath the surface to calculate the physical parameters (resistivity) as the initial stage to estimate the aquifer layers in order to identify potential sources of groundwater. Field data measurements were carried out at several points across the Langsa City area. Based on the result, it was found that presence of groundwater exists in the study area, indicated by the presence of aquifer layer at depth of 43 - 105 m beneath the surface with resistivity value of 31 - 45 Ωm. Keywords: groundwater, aquifer, vertical electrical sounding, resistivity
Development of Spectra Acceleration Map to Seismic Design Category Map In Yogyakarta Province Elvis Saputra
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.824

Abstract

Abstrak Indonesia dikelilingi oleh empat lempeng besar dunia yang bergerak secara konvergen sehingga menyebabkan sering mengalami kejadian gempa. Salah satu upaya mengurangi risiko bencana gempa adalah melakukan upaya mitigasi seperti pembuatan peta bahaya gempa. Penyusunan Peta Kategori Desain Seismik (KDS) Indonesia saat ini masih terkendala karena keterbatasan data penyelidikan tanah. Meskipun demikian, problem tersebut dapat diatasi dengan melakukan pendekatan berdasarkan data kecepatan gelombang geser pada kedalaman 30 (Vs30) yang disediakan oleh (USGS, 2020). Tujuan dari penelitian ini adalah melakukan penyusunan Peta Kategori Desain Seismik untuk Provinsi Daerah Istimewa Yogyakarta (DIY). Tahapan penelitian diawali dengan pengumpulan data, perhitungan percepatan tanah dan penentuan kategori desain seismik untuk setiap titik dari 3759 titik tinjauan. Hasil penyusunan peta kategori desain seismik Daerah Istimewa Yogyakarta pada kategori risiko I, II, dan III menunjukkan hasil Kabupaten Bantul, Kota Yogyakarta masuk dalam kategori risiko tinggi (KDS D), sedangkan Kabupaten Sleman, Kabupaten Kulonprogo, dan Kabupaten Gunung Kidul masuk dalam kategori risiko sedang hingga tinggi (B, C, dan D). Kategori desain seismik pada kategori risiko IV hampir secara keseluruhan kabupaten-kabupaten di Provinsi Daerah Istimewa Yogyakarta masuk dalam Kategori Desain Seismik D yang artinya memiliki tingkat risiko gempa bumi yang tinggi. Kata kunci: Gempa, mitigasi, kecepatan gelombang geser, kategori desain seismik  Abstract Indonesia is surrounded by four large plates of the world that move convergently, causing frequent earthquakes. One of the efforts to reduce the risk of earthquake disasters is to carry out mitigation efforts such as making earthquake hazard maps. The compilation of Indonesia's Seismic Design Category Map is currently still hampered due to limited soil investigation data. However, this problem can be overcome by making an approach based on the shear wave velocity data (Vs30) provided by (USGS, 2020). The purpose of this research is to create a Seismic Design Category Map for the Province of the Special Region of Yogyakarta. The research phase begins with collecting data, calculating ground acceleration, and determining the seismic design category for each point of the 3759 review points. The compilation result of seismic design category maps for the Special Region of Yogyakarta in risk categories I, II, and III showed that Bantul Regency, Yogyakarta City were in the high risk category (KDS D), while Sleman Regency, Kulonprogo, and Gunung Kidul fall into the moderate to high-risk category (B, C, and D). The Seismic Design Category Map for risk category IV showed that almost all districts in the Special Region of Yogyakarta Province were Seismic Design Category D, which means it has a high level of earthquake risk. Keywords: Earthquake, mitigation, shear wave velocity, seismic design categories
Analisis Kinerja Parkir di Tepi Jalan Umum Wilayah Kota Malang Aji Suraji; Carissa Maulida Qomariyah; Mohamad Cakrawala; Dafid Irawan; Abdu Halim
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.825

Abstract

Abstrak Parkir di kawasan Kota Malang masih menjadi persoalan terutama terkait dengan kinerja parkir dan kelancaran lalu lintas serta potensinya menimbulkan kemacetan. Untuk itu mengetahui kinerja parkir menjadi sesuatu yang sangat penting apabila akan melakukan evaluasi secara komprehensif. Tujuan penelitian ini adalah untuk mengetahui kinerja parkir di Kota Malang. Metode pengambilan data berupa survei karakteristik parkir untuk mengetahui jenis dan jumlah kendaraan yang masuk dan keluar tempat parkir serta lamanya parkir melalui metode vehicle count. Metode analisis dilakukan dengan menghitung volume parkir, akumulasi parkir, tingkat pergantian parkir, indeks parkir, dan Satuan Ruang Parkir (SRP). Hasil kajian diperoleh bahwa tingkat pergantian parkir tertinggi terjadi di lokasi Mal Ramayana dengan nilai sebesar 1,16 kendaraan/SRP/jam.  Sedangkan indeks parkir tertinggi berada di lokasi Ruko BRI Soehat dengan nilai 57,01 kendaraan/SRP/jam. Secara umum dapat disimpulkan bahwa kinerja parkir yang dilihat dari tingkat pergantian parkir dan indeks parkir  di kawasan kota Malang cukup tinggi, terutama pada waktu siang hari. Kata kunci: kinerja parkir, tepi jalan, pergantian parkir, indeks parkir    Abstract Parking in the Malang City area is still a problem, especially related to parking performance and smooth traffic and its potential to cause congestion. For this reason, knowing parking performance is very important if you are going to do a comprehensive evaluation. The purpose of this study was to determine parking performance in Malang City. The data collection method is a survey of parking characteristics to determine the type and number of vehicles entering and leaving the parking lot and the length of time they have been parked using the vehicle count method. The method of analysis is carried out by calculating parking volume, parking accumulation, parking turnover rate, parking index, and Parking Space Unit (PSU). The results of the study found that the highest parking turnover rate occurred at the Ramayana Mall location with a value of 1.16 vehicles/PSU/hour. While the highest parking index is at the BRI Soehat Ruko location with a value of 57.01 vehicles/PSU/hour. In general, it can be concluded that parking performance as seen from the parking turnover rate and parking index in the Malang city area is quite high, especially during the day.. Keywords: parking performance, on streets parking, parking, turnover parking, parking index.
Evaluasi Dan Penanganan Kerusakan Jalan Menggunakan Metode Surface Distress Index Pada Ruas Jalan Ahmad Malawat Kota Tidore Kepulauan Rusdi Ibrahim; Mufti Amir Sultan; Sabaruddin Sabaruddin
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.831

Abstract

Abstrak Jalan merupakan prasarana transportasi darat yang banyak digunakan di suatu wilayah, kondisi jalan mempengaruhi aktivitas setempat. Penelitian ini untuk mengidentifikasi sifat dan tingkat kerusakan di Jalan Ahmad Malawat dan cara mengatasinya. Panjang jalan yang disurvei adalah 2650 m dan metode yang digunakan adalah Surface Distress Index (SDI). Data yang dibutuhkan untuk penyelidikan ini adalah dimensi kerusakan panjang, lebar dan kedalaman kerusakan. Hasil penelitian menunjukkan bahwa jenis dan tingkat kerusakan jalan adalah bekas roda kendaraan sebesar 50,57%, retak sebesar 28,64%, lubang sebesar 16,30%, dan amblas sebesar 4,49%. Penanganan kerusakan berdasarkan jenis kerusakan pada permukaan jalan adalah:STA.0+800 - STA.2+000 dan STA.2+600 - STA.2+650 dalam kondisi baik, maka penanganannya dengan pemeliharaan rutin. Kondisi jalan ditangani dengan pemeliharaan berkala Pada STA.0+000 - STA.0+200 dan STA.2+400 - STA.2+600. Perawatan harus dilakukan dengan rehabilitasi untuk STA.0+200 - STA.0+600 dan STA.2+000 - STA.2+400 serta STA.0+600 - STA.0+800 dengan rekonstruksi. Kata Kunci:  Surface Distress Indeks, Kerusakan Jalan, Jenis Penanganan   Abstract The Road is a means of land transportation widely used in an area, and road conditions affect local activities. This research is to identify the nature and level of damage on Ahmad Malawat Street and how to overcome it. The length of the surveyed road is 2650 m, and the method used is the Surface Distress Index (SDI).  The data needed for this investigation are the dimensions of the damage length, width, and depth of damage. The results showed that the type and level of road damage were vehicle ruts by 50.57%, potholes by 16.30%, cracks by 28.64%, and sinking by 4.49%. The handling of damage based on the type of damage to the road surface is STA.0+800 - STA 2+000 and STA.2+600 - STA.2+650 in good condition, so handling it with regular maintenance. Road conditions are handled with periodeic maintenance At STA.0+000 - STA.0+200 and STA.2+400 - STA 2+600. The treatment must be carried out with rehabilitation for STA.0+200 - STA.0+600 and STA.2+000 - STA.2+400, STA.0+600 - STA.0+800 with reconstruction. Keywords: Surface Distress Indeks, Road Damage, Handling Type
Faktor Keterlambatan Proses Pengadaan Tanah Terhadap Pencapaian Kinerja Proyek Strategis Nasional (PSN) Jaringan Irigasi Aceh Alfa Taras Bulba; Cut Zukhrina Oktaviani
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.833

Abstract

Abstrak Pelaksanaan Proyek Strategis Nasional (PSN) membutuhkan kersediaan luas lahan cukup besar sehingga diperlukan pembebasan lahan. Beberapa penelitian memperlihatkan permasalahan pembebasan lahan yang terus ada dalam pembangunan Infrastruktur. Permasalahan pengadaan tanah secara internal antara lain dana, alokasi penambahan dana, data administrasi tanah, sumber daya manusia, pemahaman Panitia Pengadaan tanah (P2T), koordinasi dan pemilik tanah. Sementara secara ekternal meliputi peraturan, keuangan, harga, status tanah, faktor lingkungan, faktor geografis dan keterlibatan instansi dari luar. Provinsi Aceh dalam beberapa tahun terakhir sedang melaksanakan beberapa PSN diantaranya pembangunan dua jaringan irigasi yaitu Lhok Guci dan Jambo Aye Kanan. Penelitian ini dilakukan untuk mengkaji dampak proses pengadaan tanah terhadap pencapaian kinerja PSN Jaringan Irigasi Aceh. Pengumpulan data dilakukan dengan kuisioner terhadap 115 orang responden. Jawaban kuisioner kemudian diolah dengan analisis korelasi. Hasil analisis data diperoleh tiga faktor utama dari proses pengadaan tanah yang berhubungan dengan pencapaian kinerja proyek yaitu sumber daya manusia, koordinasi dan harga. Kata Kunci: Pengadaan tanah, kinerja proyek, keterlambatan, analisis korelasi  Abstract The implementation of the National Strategic Project (PSN) requires the availability of a large enough land area so that land acquisition is required. Several studies show that land acquisition problems continue to exist in infrastructure development. Internal land acquisition issues include funding, allocation of additional funds, land administration data, human resources, understanding of the Land Acquisition Committee (P2T), coordination and land owners. While externally it includes regulations, finance, prices, land status, environmental factors, geographical factors and the involvement of outside agencies. Aceh Province in recent years has been carrying out several PSNs including the construction of two irrigation networks namely Lhok Guci and Jambo Aye Kanan. This research was conducted to examine the impact of the land acquisition process on the performance achievement of the Aceh Irrigation Network PSN. Data collection was carried out using a questionnaire to 115 respondents. Questionnaire answers were then processed by correlation analysis. The results of data analysis obtained three main factors of the land acquisition process that are related to the achievement of project performance, namely human resources, coordination and price. Keywords: land acquisition, project performance, delays, correlation analysis
Analisis Risiko Rantai Pasok Beton Ready Mix Pada Proyek Konstruksi Gedung Widya Astuti; Haryono Putro
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.836

Abstract

Abstrak Risiko adalah salah satu hal yang tidak dapat dipisahkan dalam kehidupan sehari hari, termasuk dalam pelaksanaan konstruksi. Keterlibatan banyak pihak secara tidak langsung akan membentuk rantai pasok yang kompleks dan menimbulkan risiko. Kompleksitas rantai pasok ini memerlukan suatu manajemen pengelolaan hubungan antar mata rantai yang terlibat terutama dalam aktivitas rantai pasok beton ready mix yang merupakan penunjang utama dalam pelaksanaan konstruksi. Penelitian ini bertujuan untuk menganalisis risiko yang termasuk kategori risiko tinggi dalam aktivitas rantai pasok beton ready mix pada proyek konstruksi gedung. Metode penelitian yang dilakukan yaitu melalui penyebaran kuesioner kepada para pakar yang terlibat dalam aktivitas rantai pasok beton ready mix (kontraktor, supplier, dan suppliers supplier). Analisis risiko menggunakan Severity Index dan Probability and Impact Matrix. Risiko tinggi tersebut akan menjadi fokus peneliti untuk mengetahui cara penanganannya dan dapat meminimalisir risiko yang terjadi. Kata kunci: Analisis risiko, rantai pasok, ready mix, probability and impact matrix  Abstract Risk is one thing that cannot be separated from everyday life, including in construction. The involvement of many parties will indirectly form a complex supply chain and pose risks. The complexity of this supply chain requires management of the relationship between the links involved, especially in the ready-mix concrete supply chain activity, which is the main support in the implementation of construction. This study aims to analyze the risks included in the high-risk category in ready-mix concrete supply chain activities in building construction projects. The research method used is the distribution of questionnaires to experts involved in ready-mix concrete supply chain activities (contractors, suppliers, and suppliers' suppliers). A severity index, probability matrix, and impact matrix are used in risk analysis. This high risk will be the focus of researchers' efforts to find out how to handle it and minimize the risks that occur. Keywords: Risk analysis, supply chain, ready mix, probability and impact matrix
Kajian Penentuan Kuat Tekan Beton Berdasarkan Nilai Pantul Palu dengan Memvariasikan Pola Titik Pantul I Gusti Ngurah Eka Partama; Ni Putu Silvi; I Gusti Made Sudika
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.838

Abstract

Abstrak Indikasi kekuatan tekan beton dapat ditentukan dengan Destructive Test (DT) dan Non-Destruktive Test (NDT). Core Drill (CD) termasuk DT dapat menyebabkan perlemahan kekuatan elemen struktur namun hasilnya dapat menginformasikan mutu beton yang representatif. Hammer Test (HT) relatif mudah dilaksanakan namun hasilnya sering dipertanyakan. Penelitian ini bertujuan mendapatkan formulasi kuat tekan dalam fungsi nilai pantul palu dengan eksperimen menggunakan pelat beton ukuran 30x75x15 cm dengan komposisi berat 1PCC:2,697Ps:2,201 Kr, w/c sebesar 0,5. HT pola segiempat dan radial dilakukan setelah beton mengeras. Spesimen silinder 80x150 mm diambil dengan CD pada umur 14, 21, 28 dan 35 hari selanjutnya diuji tekan. Penelitian ini menyimpulkan untuk HT α sebesar 90o pola segiempat, kuat tekan dengan formulasi , Rn rerata nilai pantul pusat dan empat pada sudut bujur sangkar dengan sisi minimum 3,6 cm, serta dalam pola radial dengan formulasi , Rn rerata nilai pantul pada pusat pengujian dan 4 lainnya keliling merata dalam radius minimum 2,5cm dari pusat. Kata kunci: Kuat tekan beton, hammer test, core drill, destructive test, non- destructive test  Abstract Indication of concrete compressive strength can be determined by Destructive Test (DT) and Non-Destructive Test (NDT). Core Drill (CD) including DT can cause a weakening of the strength of structural elements, but the results can inform representative concrete quality. The Hammer Test (HT) is relatively easy to perform, but the results are often questionable. This study aims to obtain the formulation of compressive strength in terms of hammer reflection value, by experimenting with a concrete plate measuring 30x75x15 cm with a weight composition of 1PCC:2.697Ps:2.201Kr, w/c as 0.5. HT rectangular and radial patterns are carried out after the concrete hardens. Cylindrical specimens of 80x150 mm were taken with a CD at the age of 14, 21, 28 and 35 days and then compressed. This study concludes that for HT α as-90o quadrilateral pattern, compressive strength with the formulation   , Rn mean central and four reflected values at the corners of a square with a minimum side of 3.6cm, as well as in a pattern radial with the formulation , Rn is the average reflectance value at the center of the test and the other 4 circumferences evenly within a minimum radius of 2.5cm from the center. Keywords:   Concrete compressive strength, Hammer Test, Core drill, Destructive Test, Non-Destructive Test.
Analisis Faktor-Faktor Yang Mempengaruhi Triple Constraints Proyek Konstruksi Gedung Di Provinsi Aceh Dalam Masa Pandemi Covid 19 Teuku Arif Billah; Abdullah Abdullah; Alfa Taras Bulba
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i1.839

Abstract

Abstrak Pandemi Covid 19 pada tahun 2020 dan 2021 telah turut mempengaruhi triple constraints dalam pelaksanaan proyek konstruksi gedung di Provinsi Aceh. Penelitian ini bertujuan untuk mengetahui faktor-faktor dominan yang mempengaruhi triple constraints pada proyek konstruksi gedung di Provinsi Aceh dalam masa pandemi Covid 19. Proyek konstruksi gedung yang ditinjau adalah proyek yang telah selesai dibangun oleh perusahaan kontraktor di Provinsi Aceh, dengan menggunakan sumber dana dari Anggaran Pendapatan Belanja Aceh (APBA) tahun 2020 dan 2021 dan mempunyai nilai kontrak lebih dari 1 miliar rupiah. Penelitian ini menggunakan pendekatan metode kuantitatif melalui kuesioner. Teknik analisis data digunakan statistik deskriptif dan Principal Component Analysis (PCA). Hasil penelitian menunjukkan bahwa faktor-faktor yang mempengaruhi triple constraints pada proyek konstruksi gedung di Provinsi Aceh dalam masa pandemi Covid 19 yaitu faktor eksternal, tenaga kerja, keuangan, dan kontrak dengan total varian (persentase triple constraints) sebesar 66,596% dan faktor dominannya adalah faktor eksternal dengan varian sebesar 31,478%. Kata kunci: Triple constraintsi, Covid 19, PCA  Abstract The Covid19 pandemic in 2020 and 2021 has also affected triple constraints in the implementation of building construction projects in Aceh Province. This study aims to determine the dominant factors and factors that affect triple constraints on building construction projects in Aceh Province during the Covid 19 pandemic. The building construction projects reviewed are projects that have been completed by a contractor company in Aceh Province, using funding sources from the Aceh Revenue and Expenditure Budget (APBA) for 2020 and 2021 and have a contract value of more than 1 billion rupiah. Data analysis techniques used descriptive statistics and Principal Component Analysis (PCA). The results showed that the factors that influenced the triple constraints on building construction projects in Aceh Province during the Covid 19 pandemic were external factors, labor, finance, and contracts with a total variance (percentage of triple constraints) of 66,596 % and the dominant factor was external factors with a variance of 31.478%. Keywords: Triple constraints, Covid19, PCA

Filter by Year

2011 2026


Filter By Issues
All Issue Vol. 16 No. 2 (2026): Teras Jurnal (September 2026) Vol. 16 No. 1 (2026): Teras Jurnal Vol. 15 No. 1 (2025): Volume 15 Nomor 1, Maret 2025 Vol. 15 No. 2 (2025): Teras Jurnal (September) Vol. 14 No. 2 (2024): Volume 14 Nomor 2, September 2024 Vol. 14 No. 1 (2024): Volume 14 Nomor 1, Maret 2024 Vol. 13 No. 2 (2023): Volume 13 Nomor 2, September 2023 Vol. 13 No. 1 (2023): Volume 13 No 1, Maret 2023 Vol. 12 No. 2 (2022): Volume 12 Nomor 2, September 2022 Vol. 12 No. 1 (2022): Volume 12 Nomor 1, Maret 2022 Vol. 11 No. 2 (2021): Volume 11 Nomor 2, September 2021 Vol. 11 No. 1 (2021): Maret 2021 Vol. 10 No. 2 (2020): Volume 10 Nomor 2 September 2020 Vol. 10 No. 1 (2020): Volume 10 Nomor 1 Vol. 9 No. 2 (2019): Volume 9, Nomor 2, September 2019 Vol. 9 No. 1 (2019): Volume 9, Nomor 1, Maret 2019 Vol. 8 No. 2 (2018): Vol 8 No 2 September 2018 Vol. 8 No. 1 (2018): Vol 8 Nomor 1, Maret 2018 Vol. 7 No. 2 (2017): Vol. 7 Nomor 2, September 2017 Vol. 7 No. 1 (2017): Vol 7 No 1 Maret 2017 Vol. 6 No. 1 (2016): Volume 6 Nomor 1 (2016), Teras Jurnal, Vol 6 No 1, Maret 2016 Vol. 6 No. 2 (2016): Volume 6 Nomor 2, September 2016 Vol. 5 No. 2 (2015): TERAS JURNAL Vol.5, No.2, September 2015 Vol. 5 No. 1 (2015): TERAS JURNAL, Vol. 5, No. 1, Maret 2015 Vol. 4 No. 2 (2014): TERAS JURNAL, VOL.4, NO.2, SEPTEMBER 2014 Vol. 4 No. 1 (2014): TERAS JURNAL, VOL.4, NO.1, MARET 2014 Vol. 3 No. 2 (2013): Teras Jurnal, Vol 3, No 2, September 2013 Vol. 3 No. 1 (2013): Teras Jurnal, Vol 3, No.1, Maret 2013 Vol. 2 No. 4 (2012): Teras Jurnal, Vol 2, No 4, Desember 2012 Vol. 1 No. 1 (2011): Teras Jurnal, Vol.1, No.1, Maret 2011 More Issue